Provision of Automatic Signaling System (ABS) at (A) MPO (Excluding)- WZJ (Excluding) section (B) JHD (Excluding)- BELA......
Estimated value
₹6.3 crore
EMD
₹12.7 lakh
Closes
Mon, 28 Dec
30 days left
30d00h44m
Location
Central Government
Upload the tender's files, we read them for you
Who can bid, the papers you need, the scope of work and whether to bid, from the tender's own files.
Tender details
- Organisation
- Ministry of Railways › Indian Railways › East Central Railway › DANAPUR Division-ELECTRICAL
- Location
- Central Government
- Tender ID
- TRD-DNR-OT-12-26-27
- Category
- Electrical & Power
- Work description
- Provision of Automatic Signaling System (ABS) at (A) MPO (Excluding)- WZJ (Excluding) section (B) JHD (Excluding)- BELA (JHD-BELA) section (c) PPTA (Excluding) (DNR Division) - BPGJ (SEE Division) section and as required over Danapur Division.
- Tender type
- Open
- Tender category
- Works
- Form of contract
- Works - General
- Source portal
- IREPS — Indian Railways E-Procurement System
Fees, EMD and value
- Tender value
- ₹63384273.95
- 6.34 crore
- EMD
- ₹1267700
- 12.68 lakh
- Tender fee
- Not stated
- Period of work
- 12 Months days
- Bid validity
- 60 days
Tender documents and BOQ
Notice inviting tender (NIT)
- 212 KB
viewNitPdf_5609103.pdf
Tender documents
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
2022_CE-I_CT_GCC-2022Policy14_07_2022ACS-1.pdf
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-3.pdf
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf
2024_12_20IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_8ACS-8.pdf
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.dt.09.01.25.pdf
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_1111_compressed.pdf
2018_CE-I_CT_9Date04_06_2018.pdf
UDINclarification.pdf
ImportantNoticetoBidderAnnexureV.pdf
TPABS2627_compressed.pdf
Everything published on the portalCovers, payment instruments, fee and EMD details, work item details and more
Notice (IREPS)
- Work area
- Works
- Tender status
- Published
- Bidding type
- Normal Tender
- Tender Type
- Open
- Bidding System
- Single Packet System
- Advertised Value
- 63384273.95
- Tendering Section
- ELEC/TRD
- Bidding Style
- Single Rate for Each Schedule Item
- Earnest Money (Rs.)
- 1267700.00
- Validity of Offer ( Days)
- 60
- Tender Doc. Cost (Rs.)
- 0.00
- Period of Completion
- 12 Months
- Contract Type
- Works - General
- Contract Category
- Expenditure
- Bidding Start Date
- 14/12/2026
- Ranking Order For Bids
- Lowest to Highest
- Expenditure Type
- Capital (Works)
Schedule
- 1.
- Foot by Foot survey and preparation of OHE pegging plan.
- 2.
- Preparation of Design & drawing for cross section SED as created.
- 3.
- Supply of galvanised fabricated steel structure for traction masts / TTC/ portals & dwarf masts.
- 4.
- "Erection of galvanised fabricated steelstructure for traction masts / TTC/ portals & dwarf masts. "
- 5.
- Supply of Fabricated steel (SPS) work other than OHE Mast.
- 6.
- Erection of Fabricated steel (SPS) work other than OHE Mast.
- 7.
- Supply of Cantilever assembly for OHE (Regulated).
- 8.
- Erection of Cantilever assembly for OHE (Regulated).
- 9.
- Supply of Porcelain Stay insulator.
- 10.
- Erection of Porcelain Stay insulator.
- 11.
- Supply of Porcelain Bracket insulator.
- 12.
- Erection of Porcelain Bracket insulator.
- 13.
- Supply of Porcelain 9 Ton insulator.
- 14.
- Erection of Porcelain 9 Ton insulator.
- 15.
- Supply of guy rod assembly complete set for dwarf mast.
- 16.
- Erection of guy rod assembly complete set for dwarf mast.
- 17.
- Foundation(1:3:6) with core filling.
- 18.
- Erection of anticreep with Cadmium copper Catenary wire (65 sq.mm) suitable for OHE regulated.
- 19.
- Supply of Modified 3 Pulley with counter weight assembly complete in all respect.
- 20.
- Erection of Modified 3 Pulley with counter weight assembly complete in all respect.
- 21.
- Supply of structure bond (4.75 m) with nut-bolt.
- 22.
- Erection of structure bond (4.75 m) with nut-bolt.
- 23.
- Supply of rail bond (1.5 m) with nut-bolt.
- 24.
- Erection of rail bond (1.5 m) with nut-bolt.
- 25.
- Supply of Inter track bond (5m) with nut-bolt.
- 26.
- Erection of Inter track bond (5m) with nut-bolt.
- 27.
- Supply of dropper .
- 28.
- Erection of dropper .
- 29.
- Supply of Contact dropper clip.
- 30.
- Erection of Contact dropper clip.
- 31.
- Supply of Catenary dropper clip.
- 32.
- Erection of Catenary dropper clip.
- 33.
- Dismantling charges for OHE Shifting /slewing & cutting/removal of old mast under power block.
- 34.
- Supply & erection of 25 KV Drop out fuse switch assembly complete in all respect with Pedustal Insulator.
- 35.
- Supply & erection of anti climbing device with barbed wire & nut - bolt.
- 36.
- Supply of earhing electrode with switching station.
- 37.
- Erection of earhing electrode with switching station.
- 38.
- Supply of Galvanised mast for Aux. Transformer (B-175).
- 39.
- Erection of Galvanised mast for Aux. Transformer (B-175)
- 40.
- Foundation for AT Mast (1:3:6) with core filling.
- 41.
- Supply of 25 KV Danger caution board.
- 42.
- Erection of 25 KV Danger caution board.
- 43.
- Supply of CU Jumper (50 sqmm - 6m).
- 44.
- Erection of CU Jumper (50 sqmm - 6m).
- 45.
- Supply of structure bond (4.75 m) with nut-bolt.
- 46.
- Erection of structure bond (4.75 m) with nut-bolt.
- 47.
- Supply of MS flat size 50 X 6mm.
- 48.
- Erection of MS flat size 50 X 6mm.
- 49.
- Supply of 9 tone proceline insulator (Creepage distance 1050mm) with catenary suspension clamp and clevis.
- 50.
- Erection of 9 tone proceline insulator (Creepage distance 1050mm) with catenary suspension clamp and clevis.
- 51.
- Supply of 'P.G clamp 1041
- 52.
- Supply of Dropper wire (7mm).
- 53.
- Erection of Dropper wire (7mm)
- 54.
- Supply of Retro reflective number plate for OHE structure as per RDSPO specification no ETI/OHE/33A(12/97) REV.8 of size
- 55.
- Foot by Foot survey and preparation of OHE pegging plan.
- 56.
- Preparation of Design & drawing for cross section SED as created.
- 57.
- Supply of galvanised fabricated steel structure for traction masts / TTC/ portals & dwarf masts.
- 58.
- "Erection of galvanised fabricated steelstructure for traction masts / TTC/ portals & dwarf masts. "
- 59.
- Supply of Fabricated steel (SPS) work other than OHE Mast.
- 60.
- Erection of Fabricated steel (SPS) work other than OHE Mast.
- 61.
- Supply of Cantilever assembly for OHE (Regulated).
- 62.
- Erection of Cantilever assembly for OHE (Regulated).
- 63.
- Supply of Porcelain Stay insulator.
- 64.
- Erection of Porcelain Stay insulator.
- 65.
- Supply of Porcelain Bracket insulator.
- 66.
- Erection of Porcelain Bracket insulator.
- 67.
- Supply of Modified 3 Pulley with counter weight assembly complete in all respect.
- 68.
- Erection of Modified 3 Pulley with counter weight assembly complete in all respect.
- 69.
- Supply of Porcelain 9 Ton insulator.
- 70.
- Erection of Porcelain 9 Ton insulator.
- 71.
- Supply of guy rod assembly complete set for dwarf mast.
- 72.
- Erection of guy rod assembly complete set for dwarf mast.
- 73.
- Supply of double terminating assembly for OHE (Regulated).
- 74.
- Eection of double terminating assembly for OHE (Regulated).
- 75.
- Supply of Contact ending clamp .
- 76.
- Erection of Contact ending clamp .
- 77.
- Supply of Catenary ending clamp.
- 78.
- Erection of'Catenary ending clamp.
- 79.
- Supply of GI fasteeners .
- 80.
- Supply of PVC sleev.
- 81.
- Erection of 150 Sq.mm Copper feeder /cross feeder (37/2.25 mm HDBC) wire .
- 82.
- Supply of feeder ending clamp.
- 83.
- Erection of feeder ending clamp
- 84.
- Supply of PG clamp-1051 for feeder.
- 85.
- Supply of feeder wire suspension clamp.
- 86.
- Erection of feeder wire suspension clamp.
- 87.
- Erection of Complete PTFE short neutral section assembly (phase break).
- 88.
- Foundation(1:3:6) with core filling.
- 89.
- Drilling of hole of bonds
- 90.
- Supply of dropper .
- 91.
- Erection of dropper .
- 92.
- Dismantling charges for OHE Shifting /slewing & cutting/removal of old mast under power block.
- 93.
- Supply of earthing electrode with switching station
- 94.
- Erection of earthing electrode with switching station.
- 95.
- Supply of PG clamp-1041
- 96.
- Supply of GI flat 50 x6 mm size
- 97.
- Erection of GI flat 50 x6 mm size
- 98.
- Supply of Contact dropper clip.
- 99.
- Erection of Contact dropper clip.
- 100.
- Supply of Catenary dropper clip.
- 101.
- Erection of Catenary dropper clip.
- 102.
- Supply & erection of 25 KV Drop out fuse switch assembly completed in all respect with pedestal Insulator.
- 103.
- Supply & erection of anti climbing device with barbed wire & nut-bolt.
- 104.
- Supply of 25 KV Danger caution board.
- 105.
- Erection of 25 KV Danger caution board
- 106.
- Supply of CU Jumper (50 sqmm -6MTR)
- 107.
- Erection of CU Jumper (50 sqmm -6MTR)
- 108.
- Supply of 9 tonne Procelain Insulator (Creepage distance 1050mm) with catenary suspension clamp and clevis.
- 109.
- Erection of 9 tonne Procelain Insulator (Creepage distance 1050mm) with catenary suspension clamp and clevis.
- 110.
- Supply of Dropper wire (7mm)
- 111.
- Erection of Dropper wire (7mm)
- 112.
- Foot by Foot survey and preparation of OHE pegging plan.
- 113.
- Preparation of Design & drawing for cross section SED as created.
- 114.
- Supply of galvanised fabricated steel structure for traction masts / TTC/ portals & dwarf masts.
- 115.
- "Erection of galvanised fabricated steelstructure for traction masts / TTC/ portals & dwarf masts. "
- 116.
- Supply of Fabricated steel (SPS) work other than OHE Mast.
- 117.
- Erection of Fabricated steel (SPS) work other than OHE Mast.
- 118.
- Supply of Cantilever assembly for OHE (Regulated).
- 119.
- Erection of Cantilever assembly for OHE (Regulated).
- 120.
- Supply of Porcelain Stay insulator.
- 121.
- Erection of Porcelain Stay insulator.
- 122.
- Supply of Porcelain Bracket insulator.
- 123.
- Erection of Porcelain Bracket insulator.
- 124.
- Supply of Porcelain 9 Ton insulator.
- 125.
- Erection of Porcelain 9 Ton insulator.
- 126.
- Supply of guy rod assembly complete set for dwarf mast.
- 127.
- Erection of guy rod assembly complete set for dwarf mast.
- 128.
- Foundation(1:3:6) with core filling.
- 129.
- Erection of anticreep with Cadmium copper Catenary wire (65 sq.mm) suitable for OHE regulated.
- 130.
- Supply of Modified 3 Pulley with counter weight assembly complete in all respect.
- 131.
- Erection of Modified 3 Pulley with counter weight assembly complete in all respect.
- 132.
- Supply of structure bond (4.75 m) with nut-bolt.
- 133.
- Erection of structure bond (4.75 m) with nut-bolt.
- 134.
- Supply of rail bond (1.5 m) with nut-bolt.
- 135.
- Erection of rail bond (1.5 m) with nut-bolt.
- 136.
- Supply of Inter track bond (5m) with nut-bolt.
- 137.
- Erection of Inter track bond (5m) with nut-bolt.
- 138.
- Supply of dropper .
- 139.
- Erection of dropper .
- 140.
- Supply of Contact dropper clip.
- 141.
- Erection of Contact dropper clip.
- 142.
- Supply of Catenary dropper clip.
- 143.
- Erection of Catenary dropper clip.
- 144.
- Dismantling charges for OHE Shifting /slewing & cutting/removal of old mast under power block.
- 145.
- Supply & erection of 25 KV Drop out fuse switch assembly complete in all respect with Pedustal Insulator.
- 146.
- Supply & erection of anti climbing device with barbed wire & nut - bolt.
- 147.
- Supply of earhing electrode with switching station.
- 148.
- Erection of earhing electrode with switching station.
- 149.
- Supply of Galvanised mast for Aux. Transformer (B-175)
- 150.
- Erection of Galvanised mast for Aux. Transformer (B-175)
- 151.
- Foundation for AT Mast (1:3:6) with core filling.
- 152.
- Supply of 25 KV Danger caution board.
- 153.
- Erection of 25 KV Danger caution board.
- 154.
- Supply of CU Jumper (50 sqmm - 6m).
- 155.
- Erection of CU Jumper (50 sqmm - 6m).
- 156.
- Supply of structure bond (4.75 m) with nut-bolt.
- 157.
- Erection of structure bond (4.75 m) with nut-bolt.
- 158.
- Supply of MS flat size 50 X 6mm.
- 159.
- Erection of MS flat size 50 X 6mm.
- 160.
- Supply of 9 tone proceline insulator (Creepage distance 1050mm) with catenary suspension clamp and clevis.
- 161.
- Erection of 9 tone proceline insulator (Creepage distance 1050mm) with catenary suspension clamp and clevis.
- 162.
- Supply of 'P.G clamp 1041
- 163.
- Supply of Dropper wire (7mm)
- 164.
- Erection of Dropper wire (7mm).
- 165.
- Erection of Complete PTFE short neutral section assembly (phase break).
- 166.
- Erection of 150 Sq.mm Copper feeder /cross feeder (37/2.25 mm HDBC) wire .
- 167.
- Supply of feeder ending clamp.
- 168.
- Erection of feeder ending clamp.
- 169.
- Supply of PG clamp-1051 for feeder.
- 170.
- Supply of feeder wire suspension clamp.
- 171.
- Erection of feeder wire suspension clamp.
Collected from IREPS — Indian Railways E-Procurement System on 27 Nov 2026, 10:25 pm IST.
See the full details with a free account
- Fees, EMD and tender value in full
- Tender documents and BOQ (16 files)
- Important dates, the tendering authority and the pre-bid meeting
- Everything published on the portal
Takes a minute. The tender ID stays free for everyone.
How to bid
- 1Check the fees, EMD, dates and document list on this page to decide whether to bid.
- 2Download the tender documents and BOQ: search IREPS — Indian Railways E-Procurement System for Tender ID TRD-DNR-OT-12-26-27, then open it (each file asks for a CAPTCHA). Get any corrigenda too.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
New to bidding? Read How to apply for government tenders in India, step by step, How to register and bid on eprocure.gov.in and other NIC portals and How to fill the BOQ in an e-tender: item rate, percentage rate and common errors.
Before you bid
Does this tender fit your business?
Tell us what you do and your past works: we check its EMD, turnover, experience and similar-work rule against them, and find more that fit.
Likely bidders
Companies that bid on the same kind of work before, most of all for this buyer. From past results.
Who bid and who won similar tendersBusiness plan
Every bidder's price and the winner in tenders like this one, and how far below the estimate they were won, before you price yours.
50% off all plans till 31 Dec 2026 — your price stays locked afterUnlock with BusinessAsk AI about this tender3 questions free
In English, Hindi or your language: what it needs, whether to bid, and at what price.
Get tenders like this every morning
New electrical & power tenders, by email each morning and in your account. One district is free; all of India from ₹299 a month.One district is free.
50% off all plans till 31 Dec 2026 — your price stays locked afterWon a tender? Make GST bills and running bills, write letters on your letterhead and pay your workers, all in your account. See what's included
More from Indian Railways
All their tenders- Hand Brake Cylinder (PBACM 254-130)
Indian Railways · Maharashtra
14 min leftSat, 28 Nov, 11:30 am
- Diesel Power Generator (V2)
Indian Railways · Central Govt
44 min leftSat, 28 Nov, 12:00 pm
- Line Interactive UPS with AVR (V2)
Indian Railways · Central Govt
44 min leftSat, 28 Nov, 12:00 pm
- Tower Ladder (V2)
Indian Railways · Central Govt
44 min leftSat, 28 Nov, 12:00 pm
- Entry and Mid Level Desktop Computer
Indian Railways · Central Govt
44 min leftSat, 28 Nov, 12:00 pm
Similar live tenders
Electrical & Power in Central Govt- Danapur-Replacement of existing signaling gear (PI) with EI system at Bela stations in DSTE/PNBE section under Danapur D......
₹34.6 lakh · Indian Railways · Central Govt
17 days leftTue, 15 Dec, 12:00 pm
- Set of Automatic Toilet Seat Cover with rolls. Material - ABS Plastic
Indian Railways · Central Govt
4 days leftWed, 2 Dec, 11:00 am
- Ratlam division: Drone & DGPS Survey of existing underground Signaling & telecom cables in Yard Section and prep......
₹6.4 crore · Indian Railways · Central Govt
20 days leftFri, 18 Dec, 3:00 pm
- Signaling work in connection with different CTR/TTR works in South section of Mumbai Division.
₹3.2 crore · Indian Railways · Central Govt
16 days leftMon, 14 Dec, 3:00 pm
- Signaling work in c/w Raising and Extension of existing Platforms at 11 stations in BAHL-BRML section
₹1.7 crore · Indian Railways · Central Govt
6 days leftFri, 4 Dec, 3:00 pm
- Centurion Vision System Active FMS Packet with Intrepid ultrasleeves (0.9 mm 45⁰ ABS intrepid balanced tip)Item Co......
Indian Railways · West Bengal
9 days leftMon, 7 Dec, 1:30 pm
Who wins East Central Railway tenders
All companies- Shree Mahavir Enterprises6
- Elite Associates5
- Shivdulari Enterprises Private Limited4
- Khushi Enterprises4
- Bhagwati Enterprises4
- Bansal Industries4
The number is this buyer's tenders each firm won, from the results we hold.