Bid cost and break-even calculator
Before you quote, see what a bid really leaves you: EMD, guarantees, deposits, GST, TDS, labour cess and the cost of money tied up for months. Free, no sign-up, and it works on your phone.
Your bid
Example figures are filled in. Change them to your tender's.
₹50 lakh. Leave empty if the tender doesn't say.
₹31 lakh. Material, labour, transport, overheads, without the GST you get back as input credit.
Profit at this quote: ₹4,33,490 (12.04%). See the details
Margin you want10% of the quote before GST
We work out the lowest quote that keeps it.
EMD, guarantees and depositsEMD 2% · guarantee 5% · deposit 2.5%
Usually 2–5%, as your tender states. Usually returned after the award.
Include the portal's processing fee.
Of your quote, as your tender states. Often 5% on CPWD-pattern works.
Of your quote, as your tender states. Often 2.5% on CPWD-pattern works, usually returned after the defect period.
GST, TDS and labour cessGST 18% · TDS 2% · GST TDS 2% · cess 1%
These are the usual rates. Check your tender, and confirm the tax for your contract with your CA.
Usually 18% on government works contracts; some works and supplies are at 5% or 12%.
Usually 1% for an individual or HUF, 2% for others, under section 194C. Taken here on contracts over ₹30,000 (it can also apply when one buyer pays you over ₹1 lakh in a year). You claim it back against your income tax.
Usually 2% when the buyer is a government body and the contract is over ₹2.5 lakh before GST; 0 for a private buyer. It comes back to your GST cash ledger.
Usually 1% on building and construction work (BOCW Cess Act), not on a pure supply. Taken here on the value before GST; your state may use another base.
Money tied upCash 10% a year · bank guarantee 2% a year, 20% margin · EMD 3 months · guarantees 18 months
Your loan interest, or what the money would earn. For the EMD, the deposit held back and the bank's margin.
For the performance guarantee and any extra guarantee. Ask your bank: 2% is only a starting figure. Giving it as cash or an FD? Enter 0 here and 100% margin.
The part of the guarantee the bank keeps as your FD. Ask your bank: 20% is only a starting figure.
The work, plus the defect period if your tender holds them till then.
Result · bid cost check
Profit at your quote of ₹42,50,000
₹4,33,490
12.04% of the quote before GST · quote 15% below the estimate
- Lowest quote with no loss
- ₹37,47,339
- with GST, 25.05% below the estimate
- Lowest quote for a 10% margin
- ₹41,51,910
- with GST, 16.96% below the estimate
Profit, line by line
- Your quote before GSTYour quote includes GST of ₹6,48,305
- ₹36,01,695
- Your cost to do the work
- − ₹31,00,000
- Tender fee
- − ₹1,000
- Labour cess
- − ₹36,017
- Cost of the money locked upInterest on cash held ₹24,813, bank guarantee charge ₹6,375
- − ₹31,188
- Profit
- ₹4,33,490
Money locked up
- EMDAbout 3 months, until the award
- ₹1,00,000
- Performance guaranteeAs a bank guarantee
- ₹2,12,500
- Security deposit held from bills
- ₹1,06,250
- Of the guarantees, held by your bank as margin
- ₹42,500
- Most locked at one timeGuarantees about 18 months
- ₹3,18,750
Cash on your bills
- The buyer pays, GST included
- ₹42,50,000
- Income-tax TDS kept
- − ₹72,034
- GST TDS kept
- − ₹72,034
- Labour cess kept
- − ₹36,017
- Security deposit held back
- − ₹1,06,250
- Paid into your bank on the billsYou then pay GST of ₹6,48,305, less your input credit
- ₹39,63,665
Later you usually get back the deposit (₹1,06,250) and claim both TDS (₹1,44,068) as tax credit. TDS changes when cash reaches you, not your profit.
Rates used: estimate ₹50,00,000 · EMD 2% · guarantee 5% · deposit 2.5% · extra guarantee below 80% · GST 18% (in the quote) · TDS 2% + GST TDS 2% · cess 1% · cash 10% a year, bank guarantee 2% a year with 20% margin · EMD 3 and guarantees 18 months. Estimates only: check your tender, and confirm tax with your CA.
How it works
- 1What your quote leaves youYour quote before GST, less your own cost, the tender fee, labour cess and what the locked-up money costs you. GST passes through: you collect it and pay it on.
- 2Money locked upThe EMD until the award, then the performance guarantee and the security deposit through the work and the defect period. A very low bid can add an extra guarantee.
- 3Cash on your billsGovernment buyers usually keep income-tax TDS, GST TDS and labour cess from each bill, and hold back the deposit. TDS can usually be claimed back as tax credit, so it slows your cash but isn't a cost.
- 4Your lowest safe quoteThe lowest quote with no loss, and the lowest that keeps the margin you want, with everything above counted.
Next: find a tender and see what winners quoted
- Search live government tenders by state, department and value.
- Tender results show who bid and who won.
- Business and higher plans show each bidder's price and rank in tender results. See the plans
FAQ
Questions about bid costs
Short answers about the rules this calculator uses. Your tender's own terms always decide.