Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2)
Published
Sat, 26 Sept
12:16 pm
Bid submission closes
Wed, 7 Oct
2:00 pm· 9 days left
Tender details
- Organisation
- Ministry of Cooperation
- Location
- Central Government
- Tender ID
- GEM/2026/B/8051727
- Category
- Electrical & Power
- Quantity
- 1
- Source portal
- GeM — Government e-Marketplace
Bid document
How to bid
- 1Read the bid document on this page: the terms, eligibility, EMD, specifications and ATC (additional terms and conditions).
- 2Log in to your GeM seller account (register at gem.gov.in if you don't have one; it's free).
- 3Search BidPlus for bid number GEM/2026/B/8051727 and submit your offer before the closing time.
More from Ministry of Cooperation
All their tenders →- Catering service (Duration Based) - VEG, Non Veg (as per Requirement); Breakfast, LUNCH, Dinner, Session Tea; Regular Thali
Ministry of Cooperation · Central Govt
Mon, 28 Sept3:00 pm · Today
- Examination Answer Books for Higher and Competitive Examinations (V4)
Ministry of Cooperation · Central Govt
Tue, 29 Sept5:00 pm · Tomorrow
- Heavy Duty Storage Racks
Ministry of Cooperation · Central Govt
Wed, 30 Sept12:00 pm · 2 days left
- LT Armoured Cable, 16 Sq.mm Cable Lugs, 63A 4 Pole MCB, Cable and MCB SITC, 320A 4 Pole MCCB, MCCB Spreader, MCCB Operating Handle, MCCB Enclosure, 150 Sq.mm Joint Ferrule, 70 Sq.mm Joint Ferrule, 150 Sq.mm Heat-Shrink Sleeve, 150 Sq.mm Cable Lugs, 70 Sq.mm Cable Lugs, PVC Insulation Tape, MCCB and Associated Works SITC
Ministry of Cooperation · Central Govt
Sat, 3 Oct9:00 am · 5 days left
- Passenger Car
Ministry of Cooperation · Central Govt
Sat, 3 Oct10:00 am · 5 days left
Similar live tenders
Electrical & Power in Central Govt →- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2)
Department of Panchayati Raj · Central Govt
Sat, 3 Oct11:00 am · 5 days left
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2)
Department of Panchayati Raj · Central Govt
Mon, 28 Sept2:00 pm · Today
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2)
Department of Atomic Energy · Central Govt
Mon, 28 Sept1:00 pm · Today
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2)
Department of Atomic Energy · Central Govt
Mon, 5 Oct2:00 pm · 7 days left
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2)
Department of Financial Services · Central Govt
Mon, 28 Sept7:00 pm · Today
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2)
Department of Telecommunications (DOT) · Central Govt
Tue, 29 Sept11:00 am · Tomorrow