Risk and cost work for Up gradation of Paithan to Shirur for section Ch..00.00 to Ch..55. 937 NH 752E to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement and Construction EPC Mode Basis Contract.
by Ministry of Road Transport and Highways
Published
Thu, 13 Aug
3:00 pm
Bid submission closes
Thu, 8 Oct
5:30 pm· 10 days left
Bid opening
Fri, 9 Oct
5:30 pm
Tender details
- Organisation
- Ministry of Road Transport and Highways
- Location
- Central Government
- Tender ID
- 2026_MoRTH_921713_1
- Reference no.
- EENHD/Chh.s/Tender/NIT No.03/3001627
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_MoRTH_921713_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from Ministry of Road Transport and Highways
All their tenders →- Special Repair of NH 320D from Ch. 14.300 km to 16.700 km (Descope Portion) at Bisra Builtup Area for the year 2026-27 in the State of Odisha
Ministry of Road Transport and Highways · Central Govt
Mon, 28 Sept12:00 pm · 38 min left
- Special Repair of NH 320D from Ch. 14.300 km to 16.700 km (Descope Portion) at Bisra Builtup Area for the year 2026-27 in the State of Odisha
Ministry of Road Transport and Highways · Central Govt
Mon, 28 Sept12:00 pm · 38 min left
- Short Term Maintenance Contract (STMC) estimate from km 0/00 to Km 35/350 of NH-153B in the state of odisha for the year 2026-27
Ministry of Road Transport and Highways · Central Govt
Mon, 28 Sept12:00 pm · 38 min left
- Short Term Maintenance Contract (STMC) estimate from km 0/00 to Km 35/350 of NH-153B in the state of odisha for the year 2026-27
Ministry of Road Transport and Highways · Central Govt
Mon, 28 Sept12:00 pm · 38 min left
- One time Improvement of existing left over (Bypassed) Road stretches from Km 354.531 to Km 358.842 of Kurnool - Chittoor - Ranipeta Road of NH-40 (Chittoor Town limits) in State of Andhra Pradesh on EPC mode under Annual Plan 2026-27
Ministry of Road Transport and Highways · Central Govt
Mon, 28 Sept3:00 pm · Today
Similar live tenders
Civil Works in Central Govt →- Risk and cost work for Up gradation of Paithan to Shirur for section Ch..00.00 to Ch..55. 937 NH 752E to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement and Construction EPC Mode Basis Contract.
Ministry of Road Transport and Highways · Central Govt
Tue, 29 Sept5:30 pm · Tomorrow
- Risk and cost work for Up gradation of Paithan to Shirur for section Ch..00.00 to Ch..55. 937 NH 752E to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement and Construction EPC Mode Basis Contract.
Ministry of Road Transport and Highways · Central Govt
Tue, 29 Sept5:30 pm · Tomorrow
- Risk and cost work for Up gradation of Paithan to Shirur for section Ch..00.00 to Ch..55. 937 NH 752E to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement and Construction EPC Mode Basis Contract.
Ministry of Road Transport and Highways · Central Govt
Thu, 8 Oct5:30 pm · 10 days left
- Balance work under Risk and Cost for Up gradation of Paithan Pategaon Mungi Hatgaon Bodhegaon Ladjalgaon Ghogaspargaon Phulsangvi Ukhandachakla Dahiwandi Shirur to 2 lane with paved Shoulder 4 lane Configuration Package 55 937 Km for proper
Ministry of Road Transport and Highways · Central Govt
Mon, 5 Oct5:30 pm · 7 days left
- Balance work under Risk and Cost for Up gradation of Paithan Pategaon Mungi Hatgaon Bodhegaon Ladjalgaon Ghogaspargaon Phulsangvi Ukhandachakla Dahiwandi Shirur to 2 lane with paved Shoulder 4 lane Configuration Package 55 937 Km for proper
Ministry of Road Transport and Highways · Central Govt
Mon, 5 Oct5:30 pm · 7 days left
- Repairs of Mul Chandrapur Section Under Risk And Cost in stipulated maintenance period, NH 930 Km 233.414 to Km 273.088 2 Lane 4 Lane Configuration in the state of Maharashtra on Item Rate Mode.
Ministry of Road Transport and Highways · Central Govt
Wed, 7 Oct5:00 pm · 9 days left