Result: Construction of 1200 mm Dia RCC Pile with Concrete Work (Complete Job) at ROB 546 Mathura

Awarded5 bids were received for this tender. The lowest (L1) bid is AK and AK SOIL ENTERPRISES PVT LTD's, at ₹76,92,774. As shown on Uttar Pradesh eProcurement on 29 Nov 2026.

Lowest (L1), awardedAK and AK SOIL ENTERPRISES PVT LTD₹76,92,774 (₹76.9 lakh)

Bids received (5)

  1. L1AK and AK SOIL ENTERPRISES PVT LTD₹76,92,774

    Status: Accepted-AOC · Bid submitted 23-Jan-2025 03:46 PM · Bid no. 4877090

    Remarks: Find lowest tenderer

  2. L2SHREE BALAJI NAMO ENTERPRISES₹80,23,646

    vs L1: +4.3% · ₹3,30,872 more

    Status: Rejected-Finance · Bid submitted 23-Jan-2025 04:26 PM · Bid no. 4875540

    Remarks: Find Highest

  3. ANINDYA INFRATECH PRIVATE LIMITED

    Status: Not Admitted-Fee/PreQual/Technical · Bid submitted 24-Jan-2025 12:06 AM · Bid no. 4873784

    Remarks: Not Complied with technical specification

  4. KRISHNA CONSTRUCTION

    Status: Not Admitted-Fee/PreQual/Technical · Bid submitted 24-Jan-2025 01:00 PM · Bid no. 4875418

    Remarks: Not Complied with technical specification

  5. K S INFRA PROJECT

    Status: Not Admitted-Fee/PreQual/Technical · Bid submitted 24-Jan-2025 02:15 PM · Bid no. 4880006

    Remarks: Not Complied with technical specification

Stages

  • Technical Bid OpeningNot yet
  • Technical EvaluationNot yet
  • Financial Bid OpeningNot yet
  • Financial EvaluationNot yet
  • AOCNot yet
More from the portal's report

Technical Bid Opening Summary

  • Type: Technical
  • Summary: Technical Evoluction
  • Updated On: 20-Feb-2025 01:16 PM
  • Document: technical_1749516.pdf

Technical Evaluation Summary Details

  • Updated On: 20-Feb-2025 01:21 PM
  • Financial Bid Opening Date: 20-Feb-2025 05:00 PM
  • Document: techsummary_1749516.pdf (209.51 KB)

Finance Bid Opening Summary

  • Type: Finance
  • Summary: Financial Summary
  • Updated On: 20-Feb-2025 06:09 PM
  • Document: finance_1749516.pdf
  • BOQ Comparative Chart: BOQ Comparative Chart

Finance Evaluation Summary Details

  • Updated on: 25-Mar-2025 06:18 PM
  • Document: finsummary_1749516.pdf (209.51 KB)

AOC

  • Contract Date: 24-Apr-2025
  • Total Contract Value: INR 7,651,415
  • Work Completion Period in days: 60
  • Updated on: 07-Jul-2025 05:49 PM
  • AOC document: AgreementAKsoilPillingworkROB546.pdf (774.00 KB)
  • AOC Description: Contract Awarded to M/s AK & AK Soil Enterprises, Lucknow

Questions about this result

How many bids were received for tender 2025_UPSBC_990755_1?

5 bids were received, as shown on Uttar Pradesh eProcurement on 29 Nov 2026.

Who is the lowest bidder (L1) for "Construction of 1200 mm Dia RCC Pile with Concrete Work (Complete Job) at ROB 546 Mathura"?

AK and AK SOIL ENTERPRISES PVT LTD, at ₹76,92,774. The portal shows the tender as awarded (AOC), as shown on Uttar Pradesh eProcurement on 29 Nov 2026.

Where does this result come from?

From Uttar Pradesh eProcurement's Tender Summary Report for tender ID 2025_UPSBC_990755_1, read on 29 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.