Result: MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2025 26
Awarded2 bids were received for this tender. The lowest (L1) bid is S K ENGINEERING WORKS's, at ₹7,44,625. As shown on Tamil Nadu eProcurement on 27 Nov 2026.
Bids received (2)
- L1S K ENGINEERING WORKS₹7,44,625
Status: Accepted-AOC · Bid submitted 25-Nov-2025 08:24 AM · Bid no. 1520340
Remarks: L1
- L2BHARATH ENGINEERING WORKS₹7,70,875
vs L1: +3.5% · ₹26,250 more
Status: Rejected-AOC · Bid submitted 25-Nov-2025 08:09 AM · Bid no. 1520330
Remarks: L2
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: Accepted
- Updated On: 27-Nov-2025 05:07 PM
- Document: technical_744726.pdf
Technical Evaluation Summary Details
- Updated On: 27-Nov-2025 05:09 PM
- Financial Bid Opening Date: 28-Nov-2025 05:10 PM
- Document: techsummary_744726.pdf (193.04 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: Accepted
- Updated On: 29-Nov-2025 10:36 AM
- Document: finance_744726.pdf
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 29-Nov-2025 10:40 AM
- Document: finsummary_744726.pdf (193.05 KB)
AOC
- Contract Date: 12-Dec-2025
- Total Contract Value: INR 834,944
- Work Completion Period in days: 15
- Updated on: 27-May-2026 12:36 PM
- AOC document: OT384.pdf (2317.00 KB)
- AOC Description: MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overh
Questions about this result
How many bids were received for tender 2025_EB_622791_1?
2 bids were received, as shown on Tamil Nadu eProcurement on 27 Nov 2026.
Who is the lowest bidder (L1) for "MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2025 26"?
S K ENGINEERING WORKS, at ₹7,44,625. The portal shows the tender as awarded (AOC), as shown on Tamil Nadu eProcurement on 27 Nov 2026.
Where does this result come from?
From Tamil Nadu eProcurement's Tender Summary Report for tender ID 2025_EB_622791_1, read on 27 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.