Skip to content

Launch offer: 50% off all plans, from ₹10 a day.

See plans

Result: Fabrication, Inspection and Testing, Supply, Installation of Experimental Tank with internal components along with support structure and Platform

Awarded5 bids were received for this tender. The lowest (L1) bid is Snowtech Equipments Pvt Ltd's, at ₹1,95,75,000. As shown on Central Govt eProcurement (NIC) on 26 Nov 2026.

Lowest (L1), awardedSnowtech Equipments Pvt Ltd₹1,95,75,000 (₹2 crore)

Bids received (5)

  1. L1Snowtech Equipments Pvt Ltd₹1,95,75,000

    Status: Accepted-AOC · Bid submitted 18-Apr-2022 06:16 PM · Bid no. 2543157

    Remarks: Technically suitable lowest priced offer

  2. L2Hindustan Equipments Pvt. Ltd₹2,99,26,999

    vs L1: +53% · ₹1,03,51,999 more

    Status: Rejected-Finance · Bid submitted 21-Apr-2022 06:35 PM · Bid no. 2541760

    Remarks: Financially rejected as bidder is L2

  3. 27AALFV6917E1ZU

    Status: Not Admitted-Fee/PreQual/Technical · Bid submitted 19-Apr-2022 12:58 PM · Bid no. 2543561

    Remarks: EMD/Fee not received

  4. M/s. CRYSTAL ENGINEERS

    Status: Not Admitted-Fee/PreQual/Technical · Bid submitted 02-May-2022 02:51 PM · Bid no. 2551616

    Remarks: EMD/Fee not received

  5. SHRI VENKATESWARA HI-TECH MACHINERIES PRIVATE LIMITED

    Status: Not Admitted-Fee/PreQual/Technical · Bid submitted 16-Apr-2022 01:40 PM · Bid no. 2537705

    Remarks: EMD/Fee not received

Stages

  • Technical Bid OpeningNot yet
  • Technical EvaluationNot yet
  • Financial Bid OpeningNot yet
  • Financial EvaluationNot yet
  • AOCNot yet
More from the portal's report

Technical Bid Opening Summary

  • Type: Technical
  • Summary: Summary of technical evaluation
  • Updated On: 04-Aug-2022 04:21 PM
  • Document: technical_714362.pdf

Technical Evaluation Summary Details

  • Updated On: 04-Aug-2022 04:32 PM
  • Financial Bid Opening Date: 05-Aug-2022 03:00 PM
  • Document: techsummary_714362.pdf (598.56 KB)

Finance Bid Opening Summary

  • Type: Finance
  • Summary: All the financial bids are in order and EMD were received
  • Updated On: 09-Sep-2022 02:37 PM
  • Document: None
  • BOQ Comparative Chart: BOQ Comparative Chart

Finance Evaluation Summary Details

  • Updated on: 15-Sep-2022 04:32 PM
  • Document: finsummary_714362.pdf (635.36 KB)

AOC

  • Contract Date: 25-Oct-2022
  • Total Contract Value: INR 19,575,000
  • Work Completion Period in days: 450
  • Updated on: 05-Jan-2023 03:46 PM
  • AOC document: Awardofworkcontract.pdf (3190.00 KB)
  • AOC Description: AOC and price mentioned in the WO is inclusive of all taxes

Questions about this result

How many bids were received for tender 2022_BARC_678813_1?

5 bids were received, as shown on Central Govt eProcurement (NIC) on 26 Nov 2026.

Who is the lowest bidder (L1) for "Fabrication, Inspection and Testing, Supply, Installation of Experimental Tank with internal components along with support structure and Platform"?

Snowtech Equipments Pvt Ltd, at ₹1,95,75,000. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 26 Nov 2026.

Where does this result come from?

From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2022_BARC_678813_1, read on 26 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.

Trusted by contractors and suppliers across India