Result: Construction work of Ballia bypass road from NH (Vaina) to Ballia Bansdih road (SH-107) in Ballia district. (including 05 year maintenance cost)
Awarded9 bids were received for this tender. The lowest (L1) bid is M/s Nirbhay Constructions's, at ₹88,60,01,300. As shown on Uttar Pradesh eProcurement on 24 Nov 2026.
Bids received (9)
- L1M/s Nirbhay Constructions₹88,60,01,300
Status: Accepted-AOC · Bid submitted 23-Mar-2026 11:56 AM · Bid no. 5998173
Remarks: AOC
- L2M/S R P INFRAVENTURE PRIVATE LIMITED₹94,70,25,375.38
vs L1: +6.9% · ₹6,10,24,075.38 more
Status: Rejected-Finance · Bid submitted 23-Mar-2026 11:51 AM · Bid no. 5998746
Remarks: HIGH RATE
- L3C S Infraconstruction Limited₹99,70,03,794
vs L1: +13% · ₹11,10,02,494 more
Status: Rejected-Finance · Bid submitted 23-Mar-2026 10:37 AM · Bid no. 5981684
Remarks: HIGH RATE
- L4AMBE INFRAPROJECTS PRIVATE LIMITED₹1,03,97,58,150
vs L1: +17% · ₹15,37,56,850 more
Status: Rejected-Finance · Bid submitted 23-Mar-2026 11:40 AM · Bid no. 5998070
Remarks: HIGH RATE
- L5M/s VIJENDRA PRATAP SINGH₹1,04,96,15,550
vs L1: +18% · ₹16,36,14,250 more
Status: Rejected-Finance · Bid submitted 23-Mar-2026 11:31 AM · Bid no. 5992294
Remarks: HIGH RATE
- L6M/S ANMOL ASSOCIATES₹1,05,78,08,833
vs L1: +19% · ₹17,18,07,533 more
Status: Rejected-Finance · Bid submitted 23-Mar-2026 11:05 AM · Bid no. 5998407
Remarks: HIGH RATE
- L7JAI SHAKTI CONSTRUCTION₹1,06,15,41,550
vs L1: +20% · ₹17,55,40,250 more
Status: Rejected-Finance · Bid submitted 23-Mar-2026 11:19 AM · Bid no. 5996164
Remarks: HIGH RATE
- L8Vijai Construction (India) Private Limited₹1,07,21,41,600
vs L1: +21% · ₹18,61,40,300 more
Status: Rejected-Finance · Bid submitted 23-Mar-2026 10:40 AM · Bid no. 5995004
Remarks: HIGH RATE
- S and P Infrastructure Developers Pvt. Ltd.
Status: Not Admitted-Fee/PreQual/Technical · Bid submitted 23-Mar-2026 11:09 AM · Bid no. 5994768
Remarks: Not Complied with technical specification
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: FB Letter
- Updated On: 29-May-2026 01:50 PM
- Document: technical_2098146.pdf
Technical Evaluation Summary Details
- Updated On: 29-May-2026 01:55 PM
- Financial Bid Opening Date: 29-May-2026 02:00 PM
- Document: techsummary_2098146.pdf (27.30 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: COMPARATIVE
- Updated On: 30-May-2026 02:58 PM
- Document: finance_2098146.pdf
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 30-May-2026 03:04 PM
- Document: finsummary_2098146.pdf (27.30 KB)
AOC
- Contract Date: 20-Jun-2026
- Total Contract Value: INR 886,001,300
- Work Completion Period in days: 540
- Updated on: 20-Jun-2026 05:25 PM
- AOC document: 883.pdf (561.00 KB)
- AOC Description: ACCEPTANCE LETTER
Questions about this result
How many bids were received for tender 2026_CEUAZ_1125534_1?
9 bids were received, as shown on Uttar Pradesh eProcurement on 24 Nov 2026.
Who is the lowest bidder (L1) for "Construction work of Ballia bypass road from NH (Vaina) to Ballia Bansdih road (SH-107) in Ballia district. (including 05 year maintenance cost)"?
M/s Nirbhay Constructions, at ₹88,60,01,300. The portal shows the tender as awarded (AOC), as shown on Uttar Pradesh eProcurement on 24 Nov 2026.
Where does this result come from?
From Uttar Pradesh eProcurement's Tender Summary Report for tender ID 2026_CEUAZ_1125534_1, read on 24 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.