Result: Structural Repair, Retrofitting and Other Civil Maintenance Works of Piers, Viaducts, Station Buildings and Other Structures of Stations of Line-7 (MKPR to SVVR).
Awarded8 bids were received for this tender. The lowest (L1) bid is P S SOLUTIONS INC's, at ₹3,39,97,095.39. As shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Bids received (8)
- L1P S SOLUTIONS INC₹3,39,97,095.39
Status: Accepted-AOC · Bid submitted 25-Jan-2025 08:29 PM · Bid no. 3161827
Remarks: As per quoted rate
- L2PARYAG BUILDCON CHEMICALS PRIVATE LIMITED₹3,71,19,738.59
vs L1: +9.2% · ₹31,22,643.2 more
Status: Rejected-AOC · Bid submitted 25-Jan-2025 06:14 PM · Bid no. 3161760
Remarks: As per quoted rate
- L3sea rock enggcon private limited₹3,79,97,758.65
vs L1: +12% · ₹40,00,663.26 more
Status: Rejected-AOC · Bid submitted 26-Jan-2025 09:30 PM · Bid no. 3161859
Remarks: As per quoted rate
- L4SSA TECHNO CONSTRUCTION PRIVATE LIMITED₹6,06,20,491.3
vs L1: +78% · ₹2,66,23,395.91 more
Status: Rejected-AOC · Bid submitted 27-Jan-2025 12:56 PM · Bid no. 3161752
Remarks: As per quoted rate
- KUMAWAT INFRASTRUCTURE
Status: Rejected-Technical · Bid submitted 27-Jan-2025 01:33 PM · Bid no. 3162371
Remarks: Non Compliance to the tender condition
- PRAGATI CONSTRUCTION CONSULTANTS
Status: Rejected-Technical · Bid submitted 27-Jan-2025 11:35 AM · Bid no. 3162204
Remarks: Non Compliance to the tender condition
- tercet infrastructure pvt ltd
Status: Rejected-Technical · Bid submitted 27-Jan-2025 01:05 PM · Bid no. 3162367
Remarks: Non Compliance to the tender condition
- Urban Grey Furniture Industries
Status: Rejected-Technical · Bid submitted 27-Jan-2025 10:51 AM · Bid no. 3159636
Remarks: Non Compliance to the tender condition
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: All documents downloaded successfully.
- Updated On: 28-Jan-2025 03:42 PM
- Document: technical_884521.pdf
Technical Evaluation Summary Details
- Updated On: 17-Mar-2025 03:46 PM
- Financial Bid Opening Date: 17-Mar-2025 03:50 PM
- Document: techsummary_884521.pdf (301.45 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: All documents downloaded successfully.
- Updated On: 17-Mar-2025 03:57 PM
- Document: finance_884521.pdf
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 27-Mar-2025 10:50 AM
- Document: finsummary_884521.pdf (247.80 KB)
AOC
- Contract Date: 27-Mar-2025
- Total Contract Value: INR 57,758,000
- Work Completion Period in days: 1095
- Updated on: 27-Mar-2025 10:54 AM
- AOC document: 1802-LOA.pdf (928.00 KB)
Questions about this result
How many bids were received for tender 2024_DMRC_841448_1?
8 bids were received, as shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Who is the lowest bidder (L1) for "Structural Repair, Retrofitting and Other Civil Maintenance Works of Piers, Viaducts, Station Buildings and Other Structures of Stations of Line-7 (MKPR to SVVR)."?
P S SOLUTIONS INC, at ₹3,39,97,095.39. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Where does this result come from?
From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2024_DMRC_841448_1, read on 19 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.