Skip to content

Launch offer: 50% off all plans, from ₹10 a day.

See plans

Result: Supply and stacking of Mirzapur Stone Boulder at the stockyard for AR Work during flood period for the Protection of Kalwari-Rampur embankment constructed on the Left Bank of River Ghaghra, Tehsil-Basti Sadar in Distt.-Basti.

Awarded5 bids were received for this tender. The lowest (L1) bid is M/S ARPNA CONSTRUCTION's, at ₹11,94,000. As shown on Uttar Pradesh eProcurement on 19 Nov 2026.

Lowest (L1), awardedM/S ARPNA CONSTRUCTION₹11,94,000 (₹11.9 lakh)

Bids received (5)

  1. L1M/S ARPNA CONSTRUCTION₹11,94,000

    Status: Accepted-AOC · Bid submitted 01-Jul-2026 07:16 PM · Bid no. 4381287

    Remarks: L1 AOC

  2. L2M/S JEET CONSTRUCTION₹12,97,500

    vs L1: +8.7% · ₹1,03,500 more

    Status: Rejected-AOC · Bid submitted 19-Nov-2026 07:16 PM · Bid no. 4381058

    Remarks: L2

  3. L3M/S SOHRAT SINGH₹13,00,000

    vs L1: +8.9% · ₹1,06,000 more

    Status: Rejected-Finance · Bid submitted 01-Jul-2024 11:26 AM · Bid no. 4380195

    Remarks: L3

  4. L4M/S KUMAR MANGLAM CONSTRUCTION₹13,19,500

    vs L1: +11% · ₹1,25,500 more

    Status: Rejected-Finance · Bid submitted 02-Jul-2024 11:05 AM · Bid no. 4381969

    Remarks: L4

  5. L5DILIP KUMAR YADAV₹13,94,500

    vs L1: +17% · ₹2,00,500 more

    Status: Rejected-Finance · Bid submitted 02-Jul-2024 10:20 AM · Bid no. 4383193

    Remarks: L5

Stages

  • Technical Bid OpeningNot yet
  • Technical EvaluationNot yet
  • Financial Bid OpeningNot yet
  • Financial EvaluationNot yet
  • AOCNot yet
More from the portal's report

Technical Bid Opening Summary

  • Type: Technical
  • Summary: Fee/PreQual/Technical
  • Updated On: 10-Jul-2024 09:59 PM
  • Document: technical_1612050.pdf

Technical Evaluation Summary Details

  • Updated On: 12-Jul-2024 12:43 PM
  • Financial Bid Opening Date: 13-Jul-2024 12:00 PM
  • Document: techsummary_1612050.pdf (105.72 KB)

Finance Bid Opening Summary

  • Type: Finance
  • Summary: Finance
  • Updated On: 18-Jul-2024 12:44 PM
  • Document: finance_1612050.pdf
  • BOQ Comparative Chart: BOQ Comparative Chart

Finance Evaluation Summary Details

  • Updated on: 18-Jul-2024 01:02 PM
  • Document: finsummary_1612050.pdf (378.43 KB)

AOC

  • Contract Date: 12-Aug-2026
  • Total Contract Value: INR 1,194,000
  • Work Completion Period in days: 7
  • Updated on: 12-Aug-2026 06:21 PM
  • AOC document: L_4AOCdos.pdf (319.00 KB)
  • AOC Description: AOC

Questions about this result

How many bids were received for tender 2024_UPIDC_932870_4?

5 bids were received, as shown on Uttar Pradesh eProcurement on 19 Nov 2026.

Who is the lowest bidder (L1) for "Supply and stacking of Mirzapur Stone Boulder at the stockyard for AR Work during flood period for the Protection of Kalwari-Rampur embankment constructed on the Left Bank of River Ghaghra, Tehsil-Basti Sadar in Distt.-Basti."?

M/S ARPNA CONSTRUCTION, at ₹11,94,000. The portal shows the tender as awarded (AOC), as shown on Uttar Pradesh eProcurement on 19 Nov 2026.

Where does this result come from?

From Uttar Pradesh eProcurement's Tender Summary Report for tender ID 2024_UPIDC_932870_4, read on 19 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.

Trusted by contractors and suppliers across India