Skip to content

Launch offer: 50% off all plans, from ₹10 a day.

See plans

Result: Construction of RCC/toe walls and channelization of nallah at backside of academic, administrative blocks from A-09 to A-18 blocks at North Campus of IIT Mandi

Awarded5 bids were received for this tender. The lowest (L1) bid is KDN INFRASTRUCTURE PVT. LTD.'s, at ₹8,34,27,160. As shown on Central Govt eProcurement (NIC) on 19 Nov 2026.

Lowest (L1), awardedKDN INFRASTRUCTURE PVT. LTD.₹8,34,27,160 (₹8.3 crore)

Bids received (5)

  1. L1KDN INFRASTRUCTURE PVT. LTD.₹8,34,27,160

    Status: Accepted-AOC · Bid submitted 09-Sep-2024 02:01 PM · Bid no. 3083549

    Remarks: Quoted rates are lowest

  2. L2CHAUDHARY CONSTRUCTION COMPANY PRIVATE LIMITED₹8,89,90,156

    vs L1: +6.7% · ₹55,62,996 more

    Status: Rejected-Finance · Bid submitted 09-Sep-2024 05:47 PM · Bid no. 3079809

    Remarks: Quoted rates are higher

  3. L3M/s Vijay Kapoor Construction₹9,21,51,435

    vs L1: +10% · ₹87,24,275 more

    Status: Rejected-Finance · Bid submitted 09-Sep-2024 11:52 AM · Bid no. 3080484

    Remarks: Quoted rates are higher

  4. L4Dinesh Kumar Sharma Const. (P) Limited₹9,88,15,700

    vs L1: +18% · ₹1,53,88,540 more

    Status: Rejected-Finance · Bid submitted 02-Sep-2024 10:35 AM · Bid no. 3078026

    Remarks: Quoted rates are higher

  5. sandeep builders

    Status: Not Admitted-Fee/PreQual/Technical · Bid submitted 29-Aug-2024 03:37 PM · Bid no. 3078797

    Remarks: EMD/Fee not received

Stages

  • Technical Bid OpeningNot yet
  • Technical EvaluationNot yet
  • Financial Bid OpeningNot yet
  • Financial EvaluationNot yet
  • AOCNot yet
More from the portal's report

Technical Bid Opening Summary

  • Type: Technical
  • Summary: Total 5 technical bids were received. Out of 5 only 4 were admitted for technical evaluation and M/s Sandeep builders has not submitted tender cost and EMD physically and not uploaded any document. Therefore rejected due to non submission of EMD and Fee.
  • Updated On: 11-Sep-2024 05:39 PM
  • Document: technical_862679.pdf

Technical Evaluation Summary Details

  • Updated On: 23-Sep-2024 05:08 PM
  • Financial Bid Opening Date: 23-Sep-2024 05:20 PM
  • Document: techsummary_862679.pdf (61.54 KB)

Finance Bid Opening Summary

  • Type: Finance
  • Summary: Admitted and forwarded for financial evaluation
  • Updated On: 23-Sep-2024 05:34 PM
  • Document: finance_862679.pdf
  • BOQ Comparative Chart: BOQ Comparative Chart

Finance Evaluation Summary Details

  • Updated on: 19-Nov-2026 03:51 PM
  • Document: finsummary_862679.pdf (868.90 KB)

AOC

  • Contract Date: 30-Oct-2024
  • Total Contract Value: INR 83,427,160
  • Work Completion Period in days: 210
  • Updated on: 05-Nov-2024 05:53 PM
  • AOC document: aoc1630.pdf (470.00 KB)
  • AOC Description: Work of Construction of RCC/toe walls and channelization of nallah at backside of academic, administrative blocks from A-09 to A-18 blocks at North Campus of IIT Mandi has been awared to KDN Infrasttu

Questions about this result

How many bids were received for tender 2024_IITMD_820866_1?

5 bids were received, as shown on Central Govt eProcurement (NIC) on 19 Nov 2026.

Who is the lowest bidder (L1) for "Construction of RCC/toe walls and channelization of nallah at backside of academic, administrative blocks from A-09 to A-18 blocks at North Campus of IIT Mandi"?

KDN INFRASTRUCTURE PVT. LTD., at ₹8,34,27,160. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 19 Nov 2026.

Where does this result come from?

From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2024_IITMD_820866_1, read on 19 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.

Trusted by contractors and suppliers across India