Result: Construction work of check dam on left bank nallah at upstream of Uri-II Dam
Awarded4 bids were received for this tender. The lowest (L1) bid is SALIM INFRASTRUCTURE PRIVATE LIMITED's, at ₹15,33,489.38. As shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Bids received (4)
- L1SALIM INFRASTRUCTURE PRIVATE LIMITED₹15,33,489.38
Status: Accepted-AOC · Bid submitted 17-Dec-2024 12:27 PM · Bid no. 3139131
Remarks: Being L1
- L2SYED IMTIYAZ HUSSAIN SHAH₹15,75,375.47
vs L1: +2.7% · ₹41,886.09 more
Status: Rejected-Finance · Bid submitted 14-Dec-2024 05:28 PM · Bid no. 3137550
Remarks: Highly Quoted
- L3pathan infratech private limited₹19,38,017.95
vs L1: +26% · ₹4,04,528.57 more
Status: Rejected-Finance · Bid submitted 13-Dec-2024 12:35 AM · Bid no. 3136658
Remarks: Highly Quoted
- L4AYOUB ENGINEERING WORKS PVT LTD₹23,92,982.41
vs L1: +56% · ₹8,59,493.03 more
Status: Rejected-Finance · Bid submitted 18-Dec-2024 09:54 AM · Bid no. 3139401
Remarks: Highly Quoted
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: 04 bids sent for Technical Evaluation
- Updated On: 15-Feb-2025 11:28 AM
- Document: technical_879437.pdf
Technical Evaluation Summary Details
- Updated On: 15-Feb-2025 11:31 AM
- Financial Bid Opening Date: 15-Feb-2025 12:30 PM
- Document: techsummary_879437.pdf (252.75 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: 04 bids sent for Financial Evaluation
- Updated On: 01-Apr-2025 04:40 PM
- Document: finance_879437.pdf
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 01-Apr-2025 04:46 PM
- Document: finsummary_879437.pdf (262.28 KB)
AOC
- Contract Date: 01-Apr-2025
- Total Contract Value: INR 2,436,342
- Work Completion Period in days: 90
- Updated on: 01-Apr-2025 04:49 PM
- AOC document: LOA.pdf (1136.00 KB)
- AOC Description: AOC for Construction work of check dam on left bank nallah at upstream of Uri-II Dam
Questions about this result
How many bids were received for tender 2024_NHPC_836744_1?
4 bids were received, as shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Who is the lowest bidder (L1) for "Construction work of check dam on left bank nallah at upstream of Uri-II Dam"?
SALIM INFRASTRUCTURE PRIVATE LIMITED, at ₹15,33,489.38. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Where does this result come from?
From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2024_NHPC_836744_1, read on 19 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.