Result: Cleaning of open RCC canals, box culverts, arch. culverts, rubble pitched drains from Nallah no.2 to 4 at North site, BARC, Trombay, Mumbai, Year-2025.
Awarded4 bids were received for this tender. The lowest (L1) bid is shoiab construction's, at ₹11,24,750. As shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Bids received (4)
- L1shoiab construction₹11,24,750
Status: Accepted-AOC · Bid submitted 03-Jun-2025 11:48 AM · Bid no. 3225247
Remarks: Being L1
- L2M/S NDW CONSTRUCTION.CO₹12,14,063
vs L1: +7.9% · ₹89,313 more
Status: Rejected-Finance · Bid submitted 03-Jun-2025 10:09 AM · Bid no. 3224999
Remarks: Not Being L1
- L3ROSHAN ENTERPRISES₹12,96,988
vs L1: +15% · ₹1,72,238 more
Status: Rejected-Finance · Bid submitted 03-Jun-2025 02:19 PM · Bid no. 3225448
Remarks: Not Being L1
- L4S.B.Pawar Sairam Contractors₹16,68,104
vs L1: +48% · ₹5,43,354 more
Status: Rejected-Finance · Bid submitted 03-Jun-2025 12:12 AM · Bid no. 3225059
Remarks: Not Being L1
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: 4 bids received, 4 accepted and none rejected. Part A opened and bids are being sent for Technical Analysis. However it was observed for one bidder namely M/s. NDW Construction Co. that the EMD quoted amount in CPPP information was erroneously increased.
- Updated On: 09-Jun-2025 04:11 PM
- Document: None
Technical Evaluation Summary Details
- Updated On: 27-Jun-2025 12:23 PM
- Financial Bid Opening Date: 27-Jun-2025 03:00 PM
- Document: techsummary_903942.pdf (338.07 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: Four Bids are admitted and sent for Financial Bid Evaluation.
- Updated On: 27-Jun-2025 04:10 PM
- Document: None
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 10-Jul-2025 05:34 PM
- Document: finsummary_903942.pdf (323.97 KB)
AOC
- Contract Date: 25-Aug-2025
- Total Contract Value: INR 1,124,750
- Work Completion Period in days: 365
- Updated on: 12-Aug-2025 04:47 PM
- AOC document: WOET6.pdf (4334.00 KB)
- AOC Description: WO issued to M/s Shoiab Constn.
Questions about this result
How many bids were received for tender 2025_BARC_859847_1?
4 bids were received, as shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Who is the lowest bidder (L1) for "Cleaning of open RCC canals, box culverts, arch. culverts, rubble pitched drains from Nallah no.2 to 4 at North site, BARC, Trombay, Mumbai, Year-2025."?
shoiab construction, at ₹11,24,750. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 19 Nov 2026.
Where does this result come from?
From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2025_BARC_859847_1, read on 19 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.