Result: Maintenance Contract for controlling leakage and seepage in elevated Section/Viaduct, station building, ancillary building, Depot, RSS and maintenance of drainage system of viaduct of Line - 7 from Mayur Vihar Phase-I (including) to Shiv Vihar...
Awarded4 bids were received for this tender. The lowest (L1) bid is prayagbuildtech's, at ₹1,30,42,722.77. As shown on Central Govt eProcurement (NIC) on 17 Nov 2026.
Bids received (4)
- L1prayagbuildtech₹1,30,42,722.77
Status: Accepted-AOC · Bid submitted 18-Nov-2026 06:00 PM · Bid no. 3250769
Remarks: As per quoted rate
- L2sea rock enggcon private limited₹1,96,97,894.44
vs L1: +51% · ₹66,55,171.67 more
Status: Rejected-AOC · Bid submitted 12-Jul-2025 06:18 PM · Bid no. 3247605
Remarks: As per quoted rate
- ABR ENGINEERING
Status: Rejected-Technical · Bid submitted 17-Jul-2025 11:23 PM · Bid no. 3248616
Remarks: Non Compliance to the tender condition
- Excellent Structures Pvt Ltd
Status: Rejected-Technical · Bid submitted 18-Jul-2026 06:00 PM · Bid no. 3250519
Remarks: Non Compliance to the tender condition
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: All documents downloaded successfully.
- Updated On: 21-Jul-2025 02:41 PM
- Document: technical_909451.pdf
Technical Evaluation Summary Details
- Updated On: 01-Oct-2025 12:53 PM
- Financial Bid Opening Date: 01-Oct-2025 12:55 PM
- Document: techsummary_909451.pdf (287.53 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: All documents downloaded successfully.
- Updated On: 01-Oct-2025 01:04 PM
- Document: finance_909451.pdf
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 08-Oct-2025 03:41 PM
- Document: finsummary_909451.pdf (268.67 KB)
AOC
- Contract Date: 08-Oct-2025
- Total Contract Value: INR 19,929,000
- Work Completion Period in days: 1095
- Updated on: 08-Oct-2025 03:43 PM
- AOC document: 1971LOA.pdf (879.00 KB)
Questions about this result
How many bids were received for tender 2025_DMRC_865085_1?
4 bids were received, as shown on Central Govt eProcurement (NIC) on 17 Nov 2026.
Who is the lowest bidder (L1) for "Maintenance Contract for controlling leakage and seepage in elevated Section/Viaduct, station building, ancillary building, Depot, RSS and maintenance of drainage system of viaduct of Line - 7 from Mayur Vihar Phase-I (including) to Shiv Vihar..."?
prayagbuildtech, at ₹1,30,42,722.77. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 17 Nov 2026.
Where does this result come from?
From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2025_DMRC_865085_1, read on 17 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.