Result: Deployment of 01 (One) No. 300 MT or Higher Capacity Crawler Crane on hire basis for Work Erection of equipments, during Shut-Down at HCU Revamp in connection with Composite Works Comprising of Piping, Mechanical, Electrical and Instrumentation Jobs
Awarded4 bids were received for this tender. The lowest (L1) bid is TRIVENY ENGINEERING CO's, at ₹89,68,000. As shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Bids received (4)
- L1TRIVENY ENGINEERING CO₹89,68,000
Status: Accepted-AOC · Bid submitted 12-Jan-2025 01:02 PM · Bid no. 3153461
Remarks: Accepted Financially
- L2HI TECH MOVERS₹97,94,000
vs L1: +9.2% · ₹8,26,000 more
Status: Rejected-AOC · Bid submitted 10-Jan-2025 04:31 PM · Bid no. 3152912
Remarks: Not Accepted Financially
- L3URMILLA ENTERPRISES PRIVATE LIMITED₹1,39,24,000
vs L1: +55% · ₹49,56,000 more
Status: Rejected-AOC · Bid submitted 08-Jan-2025 10:24 AM · Bid no. 3149883
Remarks: Not Accepted Financially
- AGGCON EQUIPMENTS INTERNATIONAL PVT LTD
Status: Rejected-Technical · Bid submitted 14-Jan-2025 04:52 PM · Bid no. 3155002
Remarks: NOT RECOMMENDED
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: Technical Opening Completed
- Updated On: 22-Jan-2025 06:06 PM
- Document: None
Technical Evaluation Summary Details
- Updated On: 14-Feb-2025 12:08 PM
- Financial Bid Opening Date: 14-Feb-2025 12:20 PM
- Document: techsummary_885144.pdf (174.28 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: boq comparative chart
- Updated On: 14-Feb-2025 12:38 PM
- Document: finance_885144.pdf
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 16-Apr-2026 04:18 PM
- Document: finsummary_885144.pdf (63.18 KB)
AOC
- Contract Date: 16-Apr-2026
- Total Contract Value: INR 8,968,000
- Work Completion Period in days: 120
- Updated on: 16-Apr-2026 04:23 PM
- AOC document: WO_ms_TRIVENY_ENGG_Co.pdf (6484.00 KB)
- AOC Description: WO to M/s TRIVENY ENGINEERING CO -Attached
Questions about this result
How many bids were received for tender 2024_BandR_842038_1?
4 bids were received, as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Who is the lowest bidder (L1) for "Deployment of 01 (One) No. 300 MT or Higher Capacity Crawler Crane on hire basis for Work Erection of equipments, during Shut-Down at HCU Revamp in connection with Composite Works Comprising of Piping, Mechanical, Electrical and Instrumentation Jobs"?
TRIVENY ENGINEERING CO, at ₹89,68,000. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Where does this result come from?
From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2024_BandR_842038_1, read on 16 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.