Skip to content

Launch offer: 50% off all plans, from ₹10 a day.

See plans

Result: Structural repair, Painting at QAD, AUMP, Pump House, Traffic Building and other miscellaneous civil works of other buildings at South site, BARC, Trombay, Mumbai.

Awarded3 bids were received for this tender. The lowest (L1) bid is H K Infra Engineering's, at ₹1,67,92,450. As shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Lowest (L1), awardedH K Infra Engineering₹1,67,92,450 (₹1.7 crore)

Bids received (3)

  1. L1H K Infra Engineering₹1,67,92,450

    Status: Accepted-AOC · Bid submitted 26-Jan-2026 01:39 PM · Bid no. 3355906

    Remarks: Being L1

  2. L2shoiab construction₹1,83,11,000

    vs L1: +9.0% · ₹15,18,550 more

    Status: Rejected-Finance · Bid submitted 04-Feb-2026 11:16 AM · Bid no. 3361421

    Remarks: Being L2

  3. L3Meena Enterprises₹1,95,92,325

    vs L1: +17% · ₹27,99,875 more

    Status: Rejected-Finance · Bid submitted 25-Jan-2026 09:12 AM · Bid no. 3356104

    Remarks: Being L3

Stages

  • Technical Bid OpeningNot yet
  • Technical EvaluationNot yet
  • Financial Bid OpeningNot yet
  • Financial EvaluationNot yet
  • AOCNot yet
More from the portal's report

Technical Bid Opening Summary

  • Type: Technical
  • Summary: 3 bids received, 3 accepted and none rejected. Part A opened and bids are being sent for Technical Analysis.
  • Updated On: 10-Feb-2026 04:42 PM
  • Document: None

Technical Evaluation Summary Details

  • Updated On: 05-Mar-2026 12:19 PM
  • Financial Bid Opening Date: 05-Mar-2026 03:30 PM
  • Document: techsummary_935882.pdf (304.30 KB)

Finance Bid Opening Summary

  • Type: Finance
  • Summary: Bids are admitted and will be evaluated
  • Updated On: 05-Mar-2026 04:42 PM
  • Document: None
  • BOQ Comparative Chart: BOQ Comparative Chart

Finance Evaluation Summary Details

  • Updated on: 20-Apr-2026 05:24 PM
  • Document: finsummary_935882.pdf (305.64 KB)

AOC

  • Contract Date: 26-Jun-2026
  • Total Contract Value: INR 16,792,450
  • Work Completion Period in days: 455
  • Updated on: 16-Jun-2026 12:30 PM
  • AOC document: WO19ET70.pdf (10326.00 KB)
  • AOC Description: Work Order

Questions about this result

How many bids were received for tender 2025_BARC_890387_1?

3 bids were received, as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Who is the lowest bidder (L1) for "Structural repair, Painting at QAD, AUMP, Pump House, Traffic Building and other miscellaneous civil works of other buildings at South site, BARC, Trombay, Mumbai."?

H K Infra Engineering, at ₹1,67,92,450. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Where does this result come from?

From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2025_BARC_890387_1, read on 16 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.

Trusted by contractors and suppliers across India