Result: River bank protection erosion control measures on the Left bank of River Subansiri adjacent to Kaliani Gunasuti GP RD41.65KM to 42.55KM 900m beyond 30KM
Awarded13 bids were received for this tender. The lowest (L1) bid is Haider Ali Ventures LLP's, at ₹3,32,84,318.43. As shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Bids received (13)
- L1Haider Ali Ventures LLP₹3,32,84,318.43
Status: Accepted-AOC · Bid submitted 09-Oct-2023 03:52 PM · Bid no. 2891728
Remarks: The work was already awarded to the L1 bidder M/s Haider Ali Ventures LLP on 19-03-2024 vide the enclosed LOA. This action is being taken solely to regularize the tender status on the CPP Portal.
- L2Bhackta Mohan Hazarika Enterprises LLP₹3,34,55,394.29
vs L1: +0.5% · ₹1,71,075.86 more
Status: Rejected-Finance · Bid submitted 09-Oct-2023 04:04 PM · Bid no. 2894269
Remarks: L2 Bidder
- L3TKJ INFRASTRUCTURE PVT LTD₹3,47,18,336.69
vs L1: +4.3% · ₹14,34,018.26 more
Status: Rejected-Finance · Bid submitted 03-Oct-2023 10:40 AM · Bid no. 2890258
Remarks: L3 Bidder
- L4Losang Power & Infra Private Limited₹3,51,20,868.13
vs L1: +5.5% · ₹18,36,549.7 more
Status: Rejected-Finance · Bid submitted 09-Oct-2023 04:41 PM · Bid no. 2895084
Remarks: L4 Bidder
- L5RAJIB LOHIA₹3,52,11,437.7
vs L1: +5.8% · ₹19,27,119.27 more
Status: Rejected-Finance · Bid submitted 09-Oct-2023 11:54 AM · Bid no. 2894706
Remarks: L5 Bidder
- L6B B CONSTRUCTION AND SUPPLIER₹3,67,30,993.89
vs L1: +10% · ₹34,46,675.46 more
Status: Rejected-Finance · Bid submitted 06-Oct-2023 06:26 PM · Bid no. 2884411
Remarks: L6 Bidder
- L7BHABISHYA ASHIMRAJ VENTURES (OPC) PRIVATE LIMITED₹3,71,83,841.76
vs L1: +12% · ₹38,99,523.33 more
Status: Rejected-Finance · Bid submitted 09-Oct-2023 03:55 PM · Bid no. 2892118
Remarks: L7 Bidder
- L8NORTHERN GASES₹3,72,34,158.19
vs L1: +12% · ₹39,49,839.76 more
Status: Rejected-Finance · Bid submitted 09-Oct-2023 03:59 PM · Bid no. 2894483
Remarks: L8 Bidder
- L9Pushpa Heritage Developers Private Limited₹3,76,81,974.41
vs L1: +13% · ₹43,97,655.98 more
Status: Rejected-Finance · Bid submitted 09-Oct-2023 12:54 PM · Bid no. 2894800
Remarks: L9 Bidder
- L10M/S DEEPAK CHETRY₹4,37,75,294.08
vs L1: +32% · ₹1,04,90,975.65 more
Status: Rejected-Finance · Bid submitted 07-Oct-2023 01:22 PM · Bid no. 2893224
Remarks: L10 Bidder
- L11TRIKALA INDUSTRIES INDIA PVT LTD₹4,49,07,413.76
vs L1: +35% · ₹1,16,23,095.33 more
Status: Rejected-Finance · Bid submitted 08-Oct-2023 12:47 AM · Bid no. 2892415
Remarks: L11 Bidder
- FUTURE FORTUNE INFRASTRUCTURE PRIVATE LIMITED
Status: Rejected-Technical · Bid submitted 09-Oct-2023 01:19 PM · Bid no. 2890177
Remarks: Bidder is Techno-commercially Non-responsive
- Ram Sagar Prasad
Status: Rejected-Technical · Bid submitted 09-Oct-2023 01:24 PM · Bid no. 2894311
Remarks: Bidder is Techno-commercially Non-responsive
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: Techno commercial Bid is opened by TOC Members of the 13 Bidders summary is attached
- Updated On: 12-Oct-2023 05:41 PM
- Document: technical_811681.pdf
Technical Evaluation Summary Details
- Updated On: 03-Jan-2024 11:28 AM
- Financial Bid Opening Date: 03-Jan-2024 11:45 AM
- Document: techsummary_811681.pdf (2542.70 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: TOC has opened the Price Bid on 03rd Jan 2024 of 11 Nos. Bidders.
- Updated On: 03-Jan-2024 12:57 PM
- Document: finance_811681.pdf
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 10-Aug-2026 03:10 PM
- Document: finsummary_811681.pdf (593.90 KB)
AOC
- Contract Date: 10-Aug-2026
- Total Contract Value: INR 33,284,318
- Work Completion Period in days: 300
- Updated on: 10-Aug-2026 03:24 PM
- AOC document: C_37_LOA_19_03_2024.pdf (1860.00 KB)
- AOC Description: The work was already awarded to the L1 bidder M/s Haider Ali Ventures LLP on 19-03-2024 vide the enclosed LOA. This action is being taken solely to regularize the tender status on the CPP Portal.
Questions about this result
How many bids were received for tender 2023_NHPC_772092_1?
13 bids were received, as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Who is the lowest bidder (L1) for "River bank protection erosion control measures on the Left bank of River Subansiri adjacent to Kaliani Gunasuti GP RD41.65KM to 42.55KM 900m beyond 30KM"?
Haider Ali Ventures LLP, at ₹3,32,84,318.43. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Where does this result come from?
From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2023_NHPC_772092_1, read on 16 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.