Result: River bank protection erosion control measures on the Left bank of River Subansiri adjacent to Kaliani Gunasuti GP RD41.65KM to 42.55KM 900m beyond 30KM

Awarded13 bids were received for this tender. The lowest (L1) bid is Haider Ali Ventures LLP's, at ₹3,32,84,318.43. As shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Lowest (L1), awardedHaider Ali Ventures LLP₹3,32,84,318.43 (₹3.3 crore)

Bids received (13)

  1. L1Haider Ali Ventures LLP₹3,32,84,318.43

    Status: Accepted-AOC · Bid submitted 09-Oct-2023 03:52 PM · Bid no. 2891728

    Remarks: The work was already awarded to the L1 bidder M/s Haider Ali Ventures LLP on 19-03-2024 vide the enclosed LOA. This action is being taken solely to regularize the tender status on the CPP Portal.

  2. L2Bhackta Mohan Hazarika Enterprises LLP₹3,34,55,394.29

    vs L1: +0.5% · ₹1,71,075.86 more

    Status: Rejected-Finance · Bid submitted 09-Oct-2023 04:04 PM · Bid no. 2894269

    Remarks: L2 Bidder

  3. L3TKJ INFRASTRUCTURE PVT LTD₹3,47,18,336.69

    vs L1: +4.3% · ₹14,34,018.26 more

    Status: Rejected-Finance · Bid submitted 03-Oct-2023 10:40 AM · Bid no. 2890258

    Remarks: L3 Bidder

  4. L4Losang Power & Infra Private Limited₹3,51,20,868.13

    vs L1: +5.5% · ₹18,36,549.7 more

    Status: Rejected-Finance · Bid submitted 09-Oct-2023 04:41 PM · Bid no. 2895084

    Remarks: L4 Bidder

  5. L5RAJIB LOHIA₹3,52,11,437.7

    vs L1: +5.8% · ₹19,27,119.27 more

    Status: Rejected-Finance · Bid submitted 09-Oct-2023 11:54 AM · Bid no. 2894706

    Remarks: L5 Bidder

  6. L6B B CONSTRUCTION AND SUPPLIER₹3,67,30,993.89

    vs L1: +10% · ₹34,46,675.46 more

    Status: Rejected-Finance · Bid submitted 06-Oct-2023 06:26 PM · Bid no. 2884411

    Remarks: L6 Bidder

  7. L7BHABISHYA ASHIMRAJ VENTURES (OPC) PRIVATE LIMITED₹3,71,83,841.76

    vs L1: +12% · ₹38,99,523.33 more

    Status: Rejected-Finance · Bid submitted 09-Oct-2023 03:55 PM · Bid no. 2892118

    Remarks: L7 Bidder

  8. L8NORTHERN GASES₹3,72,34,158.19

    vs L1: +12% · ₹39,49,839.76 more

    Status: Rejected-Finance · Bid submitted 09-Oct-2023 03:59 PM · Bid no. 2894483

    Remarks: L8 Bidder

  9. L9Pushpa Heritage Developers Private Limited₹3,76,81,974.41

    vs L1: +13% · ₹43,97,655.98 more

    Status: Rejected-Finance · Bid submitted 09-Oct-2023 12:54 PM · Bid no. 2894800

    Remarks: L9 Bidder

  10. L10M/S DEEPAK CHETRY₹4,37,75,294.08

    vs L1: +32% · ₹1,04,90,975.65 more

    Status: Rejected-Finance · Bid submitted 07-Oct-2023 01:22 PM · Bid no. 2893224

    Remarks: L10 Bidder

  11. L11TRIKALA INDUSTRIES INDIA PVT LTD₹4,49,07,413.76

    vs L1: +35% · ₹1,16,23,095.33 more

    Status: Rejected-Finance · Bid submitted 08-Oct-2023 12:47 AM · Bid no. 2892415

    Remarks: L11 Bidder

  12. FUTURE FORTUNE INFRASTRUCTURE PRIVATE LIMITED

    Status: Rejected-Technical · Bid submitted 09-Oct-2023 01:19 PM · Bid no. 2890177

    Remarks: Bidder is Techno-commercially Non-responsive

  13. Ram Sagar Prasad

    Status: Rejected-Technical · Bid submitted 09-Oct-2023 01:24 PM · Bid no. 2894311

    Remarks: Bidder is Techno-commercially Non-responsive

Stages

  • Technical Bid OpeningNot yet
  • Technical EvaluationNot yet
  • Financial Bid OpeningNot yet
  • Financial EvaluationNot yet
  • AOCNot yet
More from the portal's report

Technical Bid Opening Summary

  • Type: Technical
  • Summary: Techno commercial Bid is opened by TOC Members of the 13 Bidders summary is attached
  • Updated On: 12-Oct-2023 05:41 PM
  • Document: technical_811681.pdf

Technical Evaluation Summary Details

  • Updated On: 03-Jan-2024 11:28 AM
  • Financial Bid Opening Date: 03-Jan-2024 11:45 AM
  • Document: techsummary_811681.pdf (2542.70 KB)

Finance Bid Opening Summary

  • Type: Finance
  • Summary: TOC has opened the Price Bid on 03rd Jan 2024 of 11 Nos. Bidders.
  • Updated On: 03-Jan-2024 12:57 PM
  • Document: finance_811681.pdf
  • BOQ Comparative Chart: BOQ Comparative Chart

Finance Evaluation Summary Details

  • Updated on: 10-Aug-2026 03:10 PM
  • Document: finsummary_811681.pdf (593.90 KB)

AOC

  • Contract Date: 10-Aug-2026
  • Total Contract Value: INR 33,284,318
  • Work Completion Period in days: 300
  • Updated on: 10-Aug-2026 03:24 PM
  • AOC document: C_37_LOA_19_03_2024.pdf (1860.00 KB)
  • AOC Description: The work was already awarded to the L1 bidder M/s Haider Ali Ventures LLP on 19-03-2024 vide the enclosed LOA. This action is being taken solely to regularize the tender status on the CPP Portal.

Questions about this result

How many bids were received for tender 2023_NHPC_772092_1?

13 bids were received, as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Who is the lowest bidder (L1) for "River bank protection erosion control measures on the Left bank of River Subansiri adjacent to Kaliani Gunasuti GP RD41.65KM to 42.55KM 900m beyond 30KM"?

Haider Ali Ventures LLP, at ₹3,32,84,318.43. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Where does this result come from?

From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2023_NHPC_772092_1, read on 16 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.

Trusted by contractors and suppliers across India