Result: River bank protection erosion control measures on the Right bank of River Subansiri Downstream to Ghancharai 27degree 6minute23.26second N and 94degree 9minute 14.87second E between RD 56.70KM to 57.70KM beyond 30KM 1000m

Awarded11 bids were received for this tender. The lowest (L1) bid is m/s rinya yangfo construction's, at ₹3,39,83,020.18. As shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Lowest (L1), awardedm/s rinya yangfo construction₹3,39,83,020.18 (₹3.4 crore)

Bids received (11)

  1. L1m/s rinya yangfo construction₹3,39,83,020.18

    Status: Accepted-AOC · Bid submitted 18-Oct-2023 02:37 PM · Bid no. 2900372

    Remarks: The work was already awarded to the L1 bidder M/s Rinya Yangfo Construction on 10 Jun 2024 vide the enclosed LOA. This action is being taken solely to regularize the tender status on the CPP Portal.

  2. L2Losang Power & Infra Private Limited₹3,70,12,427.57

    vs L1: +8.9% · ₹30,29,407.39 more

    Status: Rejected-Finance · Bid submitted 17-Oct-2023 03:31 PM · Bid no. 2899660

    Remarks: L2 Bidder

  3. L3BHABISHYA ASHIMRAJ VENTURES (OPC) PRIVATE LIMITED₹3,91,25,187.7

    vs L1: +15% · ₹51,42,167.52 more

    Status: Rejected-Finance · Bid submitted 18-Oct-2023 11:38 AM · Bid no. 2900216

    Remarks: L3 Bidder

  4. L4B B CONSTRUCTION AND SUPPLIER₹3,91,81,080.83

    vs L1: +15% · ₹51,98,060.65 more

    Status: Rejected-Finance · Bid submitted 18-Oct-2023 04:09 PM · Bid no. 2890210

    Remarks: L4 Bidder

  5. L5M/S DEEPAK CHETRY₹4,04,10,729.58

    vs L1: +19% · ₹64,27,709.4 more

    Status: Rejected-Finance · Bid submitted 18-Oct-2023 12:12 PM · Bid no. 2900290

    Remarks: L5 Bidder

  6. L6NORTHERN GASES₹4,35,96,637.73

    vs L1: +28% · ₹96,13,617.55 more

    Status: Rejected-Finance · Bid submitted 18-Oct-2023 01:44 PM · Bid no. 2900296

    Remarks: L6 Bidder

  7. L7ALent Technology Pvt Ltd₹5,58,98,714.6

    vs L1: +64% · ₹2,19,15,694.42 more

    Status: Rejected-Finance · Bid submitted 18-Oct-2023 01:42 AM · Bid no. 2900000

    Remarks: L7 Bidder

  8. BARMUNALT PEGUS PRIVATE LIMITED

    Status: Rejected-Technical · Bid submitted 17-Oct-2023 10:02 PM · Bid no. 2900003

    Remarks: Non-responsive

  9. Khagen Konch

    Status: Rejected-Technical · Bid submitted 18-Oct-2023 12:55 PM · Bid no. 2900363

    Remarks: Non-responsive

  10. MINTU BHARALI

    Status: Rejected-Technical · Bid submitted 17-Oct-2023 04:55 PM · Bid no. 2899457

    Remarks: Non-responsive

  11. TKJ INFRASTRUCTURE PVT LTD

    Status: Rejected-Technical · Bid submitted 08-Oct-2023 12:34 PM · Bid no. 2894152

    Remarks: Non-responsive

Stages

  • Technical Bid OpeningNot yet
  • Technical EvaluationNot yet
  • Financial Bid OpeningNot yet
  • Financial EvaluationNot yet
  • AOCNot yet
More from the portal's report

Technical Bid Opening Summary

  • Type: Technical
  • Summary: The scheduled date for opening of techno commercial bids was 24 Oct 2023 due to Holiday on 24 Oct 2023 it is opened by TOC members on 25 October 2023 and admitted for 11 bidders summary is attached
  • Updated On: 25-Oct-2023 12:27 PM
  • Document: technical_813394.pdf

Technical Evaluation Summary Details

  • Updated On: 13-Feb-2024 03:25 PM
  • Financial Bid Opening Date: 13-Feb-2024 04:00 PM
  • Document: techsummary_813394.pdf (8514.34 KB)

Finance Bid Opening Summary

  • Type: Finance
  • Summary: TOC open Price bid of Seven bidders and not open Four bidders
  • Updated On: 13-Feb-2024 05:22 PM
  • Document: finance_813394.pdf
  • BOQ Comparative Chart: BOQ Comparative Chart

Finance Evaluation Summary Details

  • Updated on: 18-Aug-2026 03:57 PM
  • Document: finsummary_813394.pdf (597.88 KB)

AOC

  • Contract Date: 18-Aug-2026
  • Total Contract Value: INR 33,983,020
  • Work Completion Period in days: 300
  • Updated on: 18-Aug-2026 04:08 PM
  • AOC document: C_40_LOA.pdf (5740.00 KB)
  • AOC Description: The work was already awarded to the L1 bidder M/s Rinya Yangfo Construction on 10 Jun 2024 vide the enclosed LOA. This action is being taken solely to regularize the tender status on the CPP Portal.

Questions about this result

How many bids were received for tender 2023_NHPC_773629_1?

11 bids were received, as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Who is the lowest bidder (L1) for "River bank protection erosion control measures on the Right bank of River Subansiri Downstream to Ghancharai 27degree 6minute23.26second N and 94degree 9minute 14.87second E between RD 56.70KM to 57.70KM beyond 30KM 1000m"?

m/s rinya yangfo construction, at ₹3,39,83,020.18. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.

Where does this result come from?

From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2023_NHPC_773629_1, read on 16 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.