Result: Internal painting and repair work including allied works at various rooms, labs, workshops, etc. at Mod Labs and SCF buildings, BARC, Trombay, Mumbai-400085. (Year 2026-2027).
Awarded6 bids were received for this tender. The lowest (L1) bid is Kunal Construction's, at ₹66,97,100. As shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Bids received (6)
- L1Kunal Construction₹66,97,100
Status: Accepted-AOC · Bid submitted 04-Jun-2026 10:32 PM · Bid no. 3419941
Remarks: Being L1
- L2OM NILKANTHA CONSTRUCTION₹70,09,325
vs L1: +4.7% · ₹3,12,225 more
Status: Rejected-Finance · Bid submitted 02-Jun-2026 11:27 AM · Bid no. 3418821
Remarks: Being L2
- L3M/S A.M CONSTRUCTIONS₹71,84,269.8
vs L1: +7.3% · ₹4,87,169.8 more
Status: Rejected-Finance · Bid submitted 04-Jun-2026 10:00 PM · Bid no. 3413875
Remarks: Being L3
- L4S.B.Pawar Sairam Contractors₹73,09,240
vs L1: +9.1% · ₹6,12,140 more
Status: Rejected-Finance · Bid submitted 05-Jun-2026 11:16 AM · Bid no. 3420753
Remarks: Being L4
- L5SUNIL CONSTRUCTION₹77,66,190
vs L1: +16% · ₹10,69,090 more
Status: Rejected-Finance · Bid submitted 05-Jun-2026 12:38 PM · Bid no. 3420800
Remarks: Being L5
- VAIBHAVCOATS LLP
Status: Rejected-Technical · Bid submitted 01-Jun-2026 03:47 PM · Bid no. 3418368
Remarks: Not meeting NIT criteria
Stages
- Technical Bid OpeningNot yet
- Technical EvaluationNot yet
- Financial Bid OpeningNot yet
- Financial EvaluationNot yet
- AOCNot yet
More from the portal's report
Technical Bid Opening Summary
- Type: Technical
- Summary: 6 bids received, 6 accepted and none rejected. Part A opened and bids are being sent for Technical Analysis.
- Updated On: 10-Jun-2026 05:10 PM
- Document: None
Technical Evaluation Summary Details
- Updated On: 09-Sep-2026 03:40 PM
- Financial Bid Opening Date: 09-Sep-2026 04:00 PM
- Document: techsummary_952771.pdf (319.84 KB)
Finance Bid Opening Summary
- Type: Finance
- Summary: Bids are admitted and will be evaluated
- Updated On: 09-Sep-2026 04:43 PM
- Document: None
- BOQ Comparative Chart: BOQ Comparative Chart
Finance Evaluation Summary Details
- Updated on: 09-Oct-2026 09:59 AM
- Document: finsummary_952771.pdf (344.51 KB)
AOC
- Contract Date: 03-Nov-2026
- Total Contract Value: INR 6,697,100
- Work Completion Period in days: 540
- Updated on: 27-Oct-2026 11:39 AM
- AOC document: CWO63ET5.pdf (6344.00 KB)
- AOC Description: Work Order ET 5
Questions about this result
How many bids were received for tender 2026_BARC_906456_1?
6 bids were received, as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Who is the lowest bidder (L1) for "Internal painting and repair work including allied works at various rooms, labs, workshops, etc. at Mod Labs and SCF buildings, BARC, Trombay, Mumbai-400085. (Year 2026-2027)."?
Kunal Construction, at ₹66,97,100. The portal shows the tender as awarded (AOC), as shown on Central Govt eProcurement (NIC) on 16 Nov 2026.
Where does this result come from?
From Central Govt eProcurement (NIC)'s Tender Summary Report for tender ID 2026_BARC_906456_1, read on 16 Nov 2026 when a visitor looked it up. Bidders are named as the portal names them.