Skip to content

Launch offer: 50% off all plans, from ₹10 a day.

See plans

Company in government tendersMSEMake in India Find a company

A. A. Engineering CO.

Took part in 20 government tenders we have results for, the latest closing 8 Oct 2026. On record since Apr 2026. Bids most often for Mvvnl.

WhatsApp

See how A. A. Engineering CO. bids before you bid against it, on the Business plan and up.

  • Its wins, win rate and value won
  • The prices it quoted, tender by tender
  • The buyers and states it works in
  • The rivals it meets most, and who wins

Business, ₹599 a month: 30 company profiles and the bids on 150 tenders a month. Complete: 300 and 1,000.

Tenders it took part in

The 20 tenders it bid for. Who won and each price are in the full profile.

  • GEM/2026/B/8074290 · closed 8 Oct 2026

    Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - As Per ATC/BOQ; As Per ATC/BOQ; As Per ATC/BOQ

    MvvnlPrices opened

  • GEM/2026/B/8078007 · closed 5 Oct 2026

    Fuse Wire Used in Rewirable Type Electric Fuses up to 650 Volts Conforming To IS 9926,Electrical Cable Lugs

    MvvnlPrices opened

  • GEM/2026/B/7953994 · closed 11 Sept 2026

    Fuse Wire Used in Rewirable Type Electric Fuses up to 650 Volts Conforming To IS 9926,Electrical connection Lugs or thimbles

    MvvnlAwarded

  • GEM/2026/B/7891404 · closed 7 Sept 2026

    Stay Clamp with nut Bolt,11 kv Stay Insulater,Earth Wire Clamp with nut Bolt,Holding Clamp for PCC Pole 8.5 mtr with nut Bolt,11 kv F clamp for Pcc Pole With nut Bolt

    MvvnlPrices opened

  • GEM/2026/B/7936570 · closed 3 Sept 2026

    Supply of SWG Tinned Copper Fuse wire for different rating Transformer.

    MvvnlAwarded

  • GEM/2026/B/7891626 · closed 1 Sept 2026

    Stay Clamp with nut Bolt,11 kv Stay Insulater,Earth Wire Clamp with nut Bolt,Holding Clamp for PCC Pole 8.5 mtr with nut Bolt,11 kv F clamp for Pcc Pole With nut Bolt

    MvvnlPrices opened

  • GEM/2026/B/7886409 · closed 20 Aug 2026

    Stay Clamp with nut Bolt,11 kv Stay Insulater,Earth Wire Clamp with nut Bolt,Holding Clamp for PCC Pole 8.5 mtr with nut Bolt,11 kv F clamp for Pcc Pole With nut Bolt

    MvvnlAwarded

  • GEM/2026/B/7886116 · closed 20 Aug 2026

    Stay Clamp with nut Bolt,11 kv Stay Insulater,Earth Wire Clamp with nut Bolt,Holding Clamp for PCC Pole 8.5 mtr with nut Bolt,11 kv F clamp for Pcc Pole With nut Bolt

    MvvnlAwarded

  • GEM/2026/B/7874149 · closed 19 Aug 2026

    Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 70mm for 10 kva to 25 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 95mm for 63 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum Lug 120mm for 100 kva to 160 kva,Aluminum L

    MvvnlPrices opened

  • GEM/2026/B/7742742 · closed 22 Jul 2026

    stay Clamp,Insulator,wire Clamp,holding Clamp,f-Clamp

    MvvnlAwarded

  • GEM/2026/B/7701630 · closed 17 Jul 2026

    Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - As per ATC/BOQ; As per ATC/BOQ; As per ATC/BOQ

    MvvnlAwarded

  • GEM/2026/B/7603207 · closed 15 Jun 2026

    Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - As per BOQ/ATC; As per BOQ/ATC; As per BOQ/ATC

    MvvnlAwarded

  • GEM/2026/B/7500316 · closed 30 May 2026

    X-arm Holding Clamp for PCC Pole 8.5 mtr,Top Channel/Dropper Channel/Holding Clamp,Gaurding Angle Clamp for PCC,LT Clamp for PCC Pole,LT Clamp ABC Cable,Stay Insulator,11 KV F-clamp for PCC Pole,Stay Clamp

    MvvnlAwarded

  • GEM/2026/B/7526719 · closed 22 May 2026

    Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - as per BOQ/ATC; as per BOQ/ATC; as per BOQ/ATC

    MvvnlAwarded

  • GEM/2026/B/7477130 · closed 18 May 2026

    24 Volt 40 Amp. Battery Charger

    MvvnlPrices opened

  • GEM/2026/B/7477318 · closed 11 May 2026

    Silica Ge,Breather With Port,Breather,Arching Horn.,AL Lugs,AL Lugs 240,AL Lugs 70

    MvvnlAwarded

  • GEM/2026/B/7451698 · closed 5 May 2026

    Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - As per BOQ/ATC; As per BOQ/ATC; As per BOQ/ATC

    MvvnlAwarded

  • GEM/2026/B/7454546 · closed 4 May 2026

    Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - As Per BOQ/ATC; As Per BOQ/ATC; As Per BOQ/ATC

    MvvnlAwarded

  • GEM/2026/B/7454651 · closed 4 May 2026

    Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - As per BOQ/ATC; As per BOQ/ATC; As per BOQ/ATC

    MvvnlAwarded

  • GEM/2026/B/7429661 · closed 30 Apr 2026

    Hiring of Special Purpose Mining or Earth Moving Machines (Monthly Basis) - As Per Buyer's Requirement; Hydra (Hydrolic Mobile Crane); Hydra (Hydrolic Mobile Crane)

    MvvnlAwarded

Where these figures come from: Public results on GeM (gem.gov.in), 20 results for this company, last updated 18 Nov 2026. We match results to a company by its name, so two firms with the same name (in different towns, for example) show here as one.

Trusted by contractors and suppliers across India