Rate analysis for works contractors: how CPWD's DAR builds a rate, with a worked concrete example
Rate analysis explained: CPWD DAR 2023 method, water charges, GST, 15% profit and overheads, a 1:2:4 concrete example and how to price extra items.
By GovtTenderHub editorial teamUpdated 12 min read
On this page
In short
- Rate analysis works out the cost of one unit of an item of work, such as one cubic metre of concrete, from the materials, labour and machinery it needs, then adds the standard extras.
- CPWD's Delhi Analysis of Rates (DAR) 2023 is the reference most departments use. It adds 1% water charges, GST (multiplying factor 0.2127), 15% contractor's profit and overheads and 1% cess, in that order.
- Those additions turn every ₹100 of basic cost into about ₹142 in the final rate.
- The DAR's basic prices are Delhi prices of April 2023, without GST. Material prices exclude carriage, and machine hire is for an 8-hour shift with operator and fuel.
- You need rate analysis to price item rate tenders, to judge a percentage above or below the estimate, and to claim market rates for extra items, which CPWD asks for within 15 days.
- CPWD's own definition of a market rate is site cost of materials and labour plus the percentage in Schedule F for overheads and profit, shown as 15% in the standard form.
Rate analysis is how a works contractor knows whether a rate will make money or lose it. It breaks one unit of work into the cement, sand, labour hours and machine time it consumes, prices each at your site, and adds overheads and profit. This guide explains how CPWD's Delhi Analysis of Rates builds a rate, walks through a real concrete example, and shows how to adapt it to your own prices before you bid.
What is rate analysis?
Rate analysis is the costing of one unit of a work item. "Unit" is whatever the item is measured in: a cubic metre (cum) of concrete, a square metre (sqm) of plaster, a running metre of pipe. The result is a rate per unit, which you multiply by the quantity in the bill of quantities.
Every rate analysis has the same parts:
- Materials: quantity per unit times the price at site.
- Labour: worker-days per unit times the daily wage, by trade.
- Machinery and tools: hire of mixers, vibrators, rollers and the like, per day or per hour.
- Sundries: small items not worth listing separately.
- Additions: water, taxes, overheads, profit and any cess.
Departments do the same exercise to build their schedule of rates. CPWD says its Delhi Analysis of Rates "serves as backbone in preparation of DSR", the Delhi Schedule of Rates. Our schedule of rates guide explains the DSR and how estimates use it.
CPWD's Delhi Analysis of Rates (DAR) 2023
The DAR is published by CPWD and was first brought out in 1950. The current civil edition, DAR 2023, comes in two volumes. Between them they cover 27 sub-heads, from basic rates and carriage of materials through earth work, concrete, RCC and masonry to finishing, road work, water supply, drainage and new technologies.
What its preface and notes say about the inputs:
- Prices: market rates at Delhi in April 2023. Basic material rates are without GST.
- Labour: the minimum wage rates, basic plus variable dearness allowance, notified by the Chief Labour Commissioner (Central) and the Delhi Labour Commissioner, whichever is higher, from 1 April 2023. They include wages for the weekly day of rest.
- Machinery: hire charges include the operating staff, lubricating oil, fuel and consumables, but not GST. A day's hire means one shift of eight working hours.
- Materials: basic rates exclude GST, profit and overheads, and carriage. Carriage is analysed separately in its own sub-head.
- Sundries: taken at 2.27 times a base amount, linked to Delhi's cost index of 107 on 1 April 2023.
- GST: GST at 18% on works contracts is built into the analysis of every item.
So the DAR gives you two things: the quantities (how much of each input one unit needs) and the method (what gets added on top). The prices are Delhi's in 2023, which is why you replace them with your own.
How CPWD builds a rate: the formula
Every DAR item ends the same way. Once materials, labour, machinery and sundries are totalled:
| Step | Added | Label in the DAR |
|---|---|---|
| 1. Cost of inputs | Materials + labour + machinery + sundries | W |
| 2. Water charges | 1% of W | X = W + 1% |
| 3. GST | X × 0.2127 | Y = X + GST |
| 4. Contractor's profit and overheads | 15% of Y | Z = Y + 15% |
| 5. Cess | 1% of Z | Cost per unit, then rounded |
Multiply the steps together and each rupee of input cost becomes about ₹1.42 in the final rate (1.01 × 1.2127 × 1.15 × 1.01 ≈ 1.4226). That one number is handy when you change an input price: a change of ₹100 in basic cost moves the final rate by about ₹142.
Rate analysis of concrete: a worked example
This is the DAR 2023 analysis of item 4.1.4: plain cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 40 mm nominal size), for 1 cum.
| Input | Quantity | Rate (₹) | Amount (₹) |
|---|---|---|---|
| Stone aggregate 40 mm | 0.52 cum | 1,400 | 728.00 |
| Stone aggregate 20 mm | 0.22 cum | 1,425 | 313.50 |
| Stone aggregate 10 mm | 0.11 cum | 1,400 | 154.00 |
| Coarse sand (zone III) | 0.445 cum | 1,450 | 645.25 |
| Portland cement | 0.32 tonne | 5,156 | 1,649.92 |
| Mason (average) | 0.10 day | 857 | 85.70 |
| Beldar | 1.63 days | 736 | 1,199.68 |
| Bhisti | 0.70 day | 816 | 571.20 |
| Concrete mixer hire | 0.07 day | 900 | 63.00 |
| Needle vibrator hire | 0.07 day | 400 | 28.00 |
| Sundries | lump sum | 30.69 | |
| Total (W) | 5,468.94 |
Then the additions:
| Step | Amount (₹) | Running total (₹) |
|---|---|---|
| Add 1% water charges on W | 54.69 | 5,523.63 (X) |
| Add GST on X (factor 0.2127) | 1,174.88 | 6,698.51 (Y) |
| Add 15% profit and overheads on Y | 1,004.78 | 7,703.29 (Z) |
| Add 1% cess on Z | 77.03 | 7,780.32 |
| Rate per cum, rounded | 7,780.30 |
Some details worth noticing:
- Voids are allowed for. The 40 mm aggregate line is worked as 0.56 cum less 7.5% for voids, giving 0.52 cum. The DAR builds such allowances into its quantities.
- Labour is a big share. Beldar and bhisti days (unskilled workers, and the worker who carries water) cost more than all the aggregate together. Where your wages differ from Delhi's, your rate moves a lot.
- Cement is the single largest input, at 0.32 tonne per cum for this mix.
Our published schedule of rates guide shows a labour-only item too: earth work item 2.1.1, built from beldar and coolie days at ₹736 a day to a rate of ₹129.85 per sqm.
How to do your own rate analysis, step by step
- Read the item description and specification. The nomenclature tells you the mix, the thickness, what is included (centering, curing, carriage) and what is paid separately. Two items with similar names can differ in what they include.
- Take the quantities. Use the DAR's coefficients for the matching item, or your own records if you have measured consumption on past jobs.
- Price materials at your site. Get current quotes for cement, steel, sand and aggregate, and add the cost of bringing them to site. Remember the DAR's material rates leave out carriage.
- Price labour at what you will pay. Use local wages by trade. Your contract also binds you to the minimum wage law (CPWD GCC 2023, Clause 20), so wages can't be below the notified minimum.
- Price machinery for the time used. Hire or running cost per shift, including operator and fuel, divided over the output.
- Add sundries and water if you will bear them.
- Add overheads and profit. CPWD uses 15%. Your real overheads include site staff, the site office, insurance, bank guarantee charges, and interest on money held back as retention or locked in performance security. If they are higher on a small or remote job, your rate must say so.
- Add GST and any cess the contract makes you bear. Check the tender's tax clause before you add anything.
- Compare with the schedule rate. If your analysed rate is well above the SOR rate for a big item, a "below SOR" bid on that work will lose money.
A quick illustration
Say cement costs you ₹5,600 a tonne at site instead of the DAR's ₹5,156. The difference is ₹444 a tonne, or ₹142.08 per cum of this concrete (0.32 × 444). After water, GST, profit and overheads and cess, that becomes about ₹202 more per cum (142.08 × 1.4226). Do this for each major input and you have your own rate.
Where contractors need rate analysis
Pricing item rate and percentage tenders
In an item rate tender (CPWD Form 8), you quote a rate for every item. CPWD uses this form where most items are non-scheduled or specialised and "detailed analysis of rates is not available" (CPWD Works Manual 2026). So you must analyse each rate yourself.
In a percentage rate tender (Form 7), you quote one percentage above or below the estimated cost. Analyse the items that make up most of the estimate and compare your rates with the SOR rates; the percentage that falls out is the lowest you can safely bid. Our guide on how to fill the BOQ in e-tenders covers entering the figures.
How the department checks your rates
CPWD prepares its own justification before opening financial bids, from market rates of materials and labour at the site on the last day for receiving tenders (Works Manual 2026, para 5.1.6). Under its procedures, the analysed items cover at least 90% of the estimate, a quote up to 5% above the justified figure is ignored, and up to 10% may be allowed in special cases. A bid below 80% of the estimate is treated as abnormally low and needs an additional performance guarantee. Your own rate analysis tells you whether your bid sits where you want it.
Claiming rates for extra items
Extra items are work not in your agreement but needed to finish the job. Under Clause 12.2 of CPWD's General Conditions of Contract 2023:
- You may claim a market rate within 15 days of the order or of the item arising, supported by an analysis of rate, manufacturer's specifications, invoices and vouchers.
- The Engineer-in-Charge decides the rate within 45 days, after considering your analysis.
- If you don't claim in time, the rate the Engineer-in-Charge approves later is final. The rates fixed for extra items can't be taken to arbitration.
The same 15-day and 45-day rule applies under Clause 12.3 when the quantity of a contract item goes beyond the deviation limit in Schedule F.
The GCC defines market rate as the rate the Engineer-in-Charge decides from the cost of materials and labour at the site, plus the percentage in Schedule F to cover all overheads and profits. The standard Schedule F shows 15%. CPWD's manual also says extra items are sanctioned only after a proper rate analysis, and its procedures base market rate analysis, as far as possible, on DAR coefficients. A clear analysis with invoices attached is the fastest way to get paid.
Rate analysis format
A sheet you can reuse, in the same order the DAR uses:
| Line | Unit and quantity | Rate (₹) | Amount (₹) |
|---|---|---|---|
| Item no. and description | per 1 unit (cum, sqm, m, each) | ||
| Material 1, 2, 3… | quantity per unit | at site, incl. carriage | qty × rate |
| Labour by trade | days per unit | daily wage | days × wage |
| Machinery and tools | days or hours per unit | hire or running cost | |
| Sundries | lump sum | ||
| Total (W) | |||
| Water charges | % of W | ||
| GST, as the contract requires | |||
| Overheads and profit | % | ||
| Cess, if applicable | % | ||
| Rate per unit |
Keep the sheet with your bid file. If the department later questions a rate or you claim an extra item, you can show exactly how you arrived at it.
Common mistakes in rate analysis
- Using Delhi prices as if they were yours. The DAR's prices are Delhi's, April 2023.
- Forgetting carriage. Basic material rates in the DAR exclude it.
- Adding GST twice, or adding it where the tender says the quoted rate already includes it.
- Ignoring idle time. Machines and gangs waiting for drawings or materials still cost money.
- Leaving out the cost of money. Retention, performance security and slow payments tie up cash; price the interest.
- No allowance for price rises on a long job without a price variation clause.
Once your rates are ready, browse live civil works tenders on GovtTenderHub, including CPWD tenders, and test them against real estimates.
Common questions
What is rate analysis in civil engineering?
It is working out the cost of one unit of a work item from the quantities of materials, labour and machinery it needs, priced at the site, plus water charges, taxes, overheads and profit. The result is the rate per unit used in estimates and bids.
What percentage of overheads and profit is used in rate analysis?
CPWD's Delhi Analysis of Rates adds 15% for contractor's profit and overheads, after water charges and GST and before a 1% cess. Its standard Schedule F also uses 15% for overheads and profit in market rates for extra items.
What is DAR in CPWD?
DAR is the Delhi Analysis of Rates. It shows the quantities of materials, labour and machinery behind each item of the Delhi Schedule of Rates, and the additions CPWD makes. The current civil edition is DAR 2023, based on Delhi prices of April 2023.
How much water charges are added in rate analysis?
The DAR adds 1% of the cost of materials, labour, machinery and sundries as water charges, before GST.
Is GST included in rate analysis?
Yes, in CPWD's. The DAR adds GST using a multiplying factor of 0.2127 on the cost after water charges, and DSR 2023 rates include GST at 18% on works contracts. Check your tender's tax clause before you add GST to your own rates.
Why do I need rate analysis if the department has a schedule of rates?
Because the schedule rates are the department's estimate, not your cost. Your rate analysis tells you how far below or above the estimate you can safely bid, and it is the evidence CPWD asks for when you claim a market rate for an extra item.
Find tenders. Win them. Run the work.
- Alerts, ₹299 a month: New tenders for your work by email every morning, anywhere in India, and full details of every tender.
- Business, ₹599 a month: Alerts, plus who bid and who won each tender, GST bills, letters on your letterhead and workers' wages.
Searching tenders is free. Prices include GST; pay yearly and save 10%.