Balance works of Aurangabad to Paithan project Section of NH-752E in the State of Maharashtra on EPC Mode
by National Highways Authority of India
Published
Mon, 14 Sept
9:00 am
Bid submission closes
Thu, 8 Oct
11:00 am· 10 days left
Bid opening
Fri, 9 Oct
11:30 am
Tender details
- Organisation
- National Highways Authority of India
- Location
- Central Government
- Tender ID
- 2026_NHAI_290730_1
- Reference no.
- NHAI/RO/NAG/CSN/RCW/AP/2026-27
- Category
- Other
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_NHAI_290730_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from National Highways Authority of India
All their tenders →- Overlay at various stretches of 6-lane access-controlled Greenfield Highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH-754A in Gujarat on EPC mode at Risk and Cost of existing Contractor
National Highways Authority of India · Central Govt
Mon, 28 Sept4:00 pm · 6 min left
- Rectification of defects on Four lane Gujarat-Maharashtra Border-Surat-Hazira Port Section of NH-53 (Old NH-6) (approx. length 131.500 km) in the State of Gujarat on single percentage item rate basis at Risk and Cost of Concessionaire
National Highways Authority of India · Central Govt
Mon, 28 Sept4:00 pm · 6 min left
- Monthly Basis Cab & Taxi Hiring Services - SUV; 3500 km x 720 hours; Outstation 24*7
National Highways Authority of India · Central Govt
Mon, 28 Sept5:00 pm · Today
- Diesel Power Generator (V2)
National Highways Authority of India · Central Govt
Mon, 28 Sept7:00 pm · Today
- Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
Similar live tenders
Other in Central Govt →- Balance works of Aurangabad to Paithan project Section of NH-752E in the State of Maharashtra on EPC Mode
National Highways Authority of India · Central Govt
Thu, 8 Oct11:00 am · 10 days left
- Risk and cost work for Up gradation of Paithan to Shirur for section Ch..00.00 to Ch..55. 937 NH 752E to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement and Construction EPC Mode Basis Contract.
Ministry of Road Transport and Highways · Central Govt
Tue, 29 Sept5:30 pm · Tomorrow
- Risk and cost work for Up gradation of Paithan to Shirur for section Ch..00.00 to Ch..55. 937 NH 752E to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement and Construction EPC Mode Basis Contract.
Ministry of Road Transport and Highways · Central Govt
Thu, 8 Oct5:30 pm · 10 days left
- Risk and cost work for Up gradation of Paithan to Shirur for section Ch..00.00 to Ch..55. 937 NH 752E to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement and Construction EPC Mode Basis Contract.
Ministry of Road Transport and Highways · Central Govt
Tue, 29 Sept5:30 pm · Tomorrow
- Risk and cost work for Up gradation of Paithan to Shirur for section Ch..00.00 to Ch..55. 937 NH 752E to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement and Construction EPC Mode Basis Contract.
Ministry of Road Transport and Highways · Central Govt
Thu, 8 Oct5:30 pm · 10 days left
- Balance work of Six laning of Kagal Satara section of NH 48 (old NH 4) Package I from km 592.500 to km 658.000 in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojana
National Highways Authority of India · Central Govt
Wed, 28 Oct11:00 am · 30 days left