Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
by National Highways Authority of India
Published
Tue, 4 Aug
1:30 pm
Bid submission closes
Thu, 8 Oct
11:00 am· 9 days left
Bid opening
Fri, 9 Oct
11:30 am
Tender details
- Organisation
- National Highways Authority of India
- Location
- Central Government
- Tender ID
- 2026_NHAI_286513_1
- Reference no.
- NHAI/2026 /UP West/PIU -Lucknow /Lucknow-Sitapur /Upgradation/RFP
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_NHAI_286513_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from National Highways Authority of India
All their tenders- Diesel Power Generator (V2)
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 9:00 am
TomorrowWed, 30 Sept, 9:00 am
- Engagement of user fee agency through E-Tender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section of NH-352A (Pkg-II) in the State of Haryana
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
- Engagement of user fee agency through E-Tender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section of NH-352A (Pkg-II) in the State of Haryana
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
- Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
- Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
Similar live tenders
Civil Works in Central Govt- Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
National Highways Authority of India · Central Govt
9 days leftThu, 8 Oct, 11:00 am
9 days leftThu, 8 Oct, 11:00 am
- Consultancy Services for Preparation of Detailed Project Report for 4 lane Access Controlled Development of existing 4-Lane from Solapur to Sangareddy Section of NH-65 (Length 246Km).
National Highways Authority of India · Central Govt
9 days leftThu, 8 Oct, 11:00 am
9 days leftThu, 8 Oct, 11:00 am
- Consultancy Services for Preparation of Detailed Project Report for 4 lane Access Controlled Development of existing 4-Lane from Solapur to Sangareddy Section of NH-65 (Length 246Km).
National Highways Authority of India · Central Govt
9 days leftThu, 8 Oct, 11:00 am
9 days leftThu, 8 Oct, 11:00 am
- Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode
Ministry of Road Transport and Highways · Central Govt
14 days leftTue, 13 Oct, 5:30 pm
14 days leftTue, 13 Oct, 5:30 pm
- Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode
Ministry of Road Transport and Highways · Central Govt
14 days leftTue, 13 Oct, 5:30 pm
14 days leftTue, 13 Oct, 5:30 pm
- abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas
Ministry of Road Transport and Highways · Central Govt
16 days leftThu, 15 Oct, 5:30 pm
16 days leftThu, 15 Oct, 5:30 pm