Machinery & Equipment · Bharat Coking Coal Limited · CPPP tenders
30 live·updated 2 h ago
30 Machinery & Equipment · Bharat Coking Coal Limited · CPPP tenders are open for bids.
Refine by state / ut, category, department, portal
State / UT
CategoryClear
- Electrical & Power35
- Other34
- Machinery & Equipment30
- Civil Works13
- Manpower & Services10
- Water & Sanitation5
- Vehicles & Transport1
- IT & Electronics1
Show 1 more
DepartmentClear
Repairing and Bearing fitting at both side of Tail End Drum and dismantling, transporting and installation of swing drum from Bansjora Siding to Old Gondudih CHP at GKKC under Kusunda Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366204_1Published 26 Sept 2026
Fri, 9 Oct11:00 am · 11 days left
Rectification of Air Conditioning System in Cabin of IDM-30 Drills.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366182_1Published 26 Sept 2026
Tue, 6 Oct6:00 pm · 8 days left
Repair of Blade Assembly
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366185_1Published 26 Sept 2026
Tue, 6 Oct6:00 pm · 8 days left
Mechanical repairing, restrenthening of sump pump base and counter weight assembly for conveyor unit 1401 at Madhuban Coal Washery under Block-II Area, BCCL.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366167_1Published 25 Sept 2026
Mon, 5 Oct5:00 pm · 7 days left
Overhauling of Service Van Generator Set Engine Overhauling, Compressor Overhauling and Adblue Connector Kit Replacement
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366125_1Published 25 Sept 2026
Mon, 5 Oct9:00 am · 7 days left
Casting and Machining of Coupling 12 Inch Dia 04 No for Pump and Motor Under ABDK Colliery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366106_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Fabrication and Fitting of Fan Blade, Fan Cover and Terminal Box of 300 HP Motor at Dobari Colliery Under ABDKGC.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365976_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Casting and Machining of Coupling 12 Inch Dia 04 No for Pump and Motor Under ABDK Colliery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366103_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Repairing of PV-II 5 Stage Pump of 0 Seam Under ABDKGC.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365990_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Fabrication and Errection of Refill Station in T Shape and Making of Short Piece Bend Jointing of Valve etc, at KOCP under ABDKC
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366090_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Complete break assembly, silencer, clutch and cabin of truck no BR17G0181 of Madhuban Coal Washery under Block-II Area, BCCL.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366040_1Published 24 Sept 2026
Sat, 3 Oct5:00 pm · 5 days left
Repairing of HT motor opening, bearing opening bearing portion welding and machining and all item refitting Gayathri crusher PS-1 ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366044_1Published 24 Sept 2026
Sat, 3 Oct5:00 pm · 5 days left
Fabrication and erection of a 15inch x18inch dumping site platform/structure and primary dumping Hopper using Scrap Dumper Bed and Salvaged Materials for the Mobile Jaw Crusher (Asset No. 910000002590) at Block-IV, Govindpur Area
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365853_1Published 24 Sept 2026
Sat, 3 Oct5:00 pm · 5 days left
Complete rewinding of 3 phase induction motor of Make Kirloskar 150hp, 550V, 1465RPM Sl. No. NAKC/M/14 of New Akashkinaree Colliery under Govindpur Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365849_1Published 24 Sept 2026
Sat, 3 Oct5:00 pm · 5 days left
Repairing of bucket assembly as a float for BE1000 sl. No. 10253 Hydraulic Shovel machine at ADIC Kusunda Area
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365944_1Published 22 Sept 2026
Sat, 3 Oct11:00 am · 5 days left
Repairing of transmission and Engine guard and valve over center of HD60835 at ADIC Kusunda Area
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365938_1Published 22 Sept 2026
Sat, 3 Oct11:00 am · 5 days left
Repairing/ Overhauling of Torque convertor, Clutch assembly, Arms Pin, Coupling, Water pump assembly and some damaged parts of Locomotive 266 at Moonidih Coal Washery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365929_1Published 22 Sept 2026
Sat, 3 Oct6:00 pm · 5 days left
Repairing of PV II 6 Stage Pump of Bera Colliery Under ABDKGC
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365887_1Published 21 Sept 2026
Mon, 5 Oct9:00 am · 7 days left
Lifting and Lowering of 120HP 600 GPM Pump Motor Set from Bore Hole No.- 1 Near Sahana Pahari Substation under Dobari Colliery ABDKC
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365854_1Published 21 Sept 2026
Mon, 5 Oct9:00 am · 7 days left
Complete Repairing rewinding and Overhauling of 7.5 HP, 440 Volts, 2900 RPM Submersible Motor and 15 Stage Submersible Pump at CISF Camp Bera Magazine Room for Drinking Water Under Bastacolla Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365889_1Published 21 Sept 2026
Mon, 5 Oct9:00 am · 7 days left
Lifting and Lowering of 7.5 HP/440Volt Submersible Pump at Tisra Regional Hospital under Bastacolla Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365883_1Published 21 Sept 2026
Mon, 5 Oct9:00 am · 7 days left
Complete Repairing of Conveyor Belt Gear box Assy of Atlas Copco Make Feeder Breaker at BNR Siding ROCP/SJ.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365876_1Published 21 Sept 2026
Mon, 5 Oct9:00 am · 7 days left
Repairing/Overhauling of Clutch Plate, Gear Box, King Pin leaf spring assembly of Hyva Tipper JH10AD 7093 of 5.0 MTPA Patherdih NLW Coal Washery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365867_1Published 21 Sept 2026
Wed, 30 Sept6:00 pm · 2 days left
Repairing of equalizing Gear for Vishwa 1200, 2X110 KW drive of Development Section in Underground Project. Sl.No. EG-1, EG-2, EG-3, EG-4
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365735_1Published 19 Sept 2026
Sat, 3 Oct6:00 pm · 5 days left
Repairing and Overhauling of Air Compressor Machine and Repairing of Compressor Motor Stator of Shatabdi Workshop, Amp Colliery, Barora Area
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365757_2Published 19 Sept 2026
Mon, 28 Sept6:00 pm · Today