Complete break assembly, silencer, clutch and cabin of truck no BR17G0181 of Madhuban Coal Washery under Block-II Area, BCCL.
Published
Thu, 24 Sept
4:00 pm
Bid submission closes
Sat, 3 Oct
5:00 pm· 5 days left
Bid opening
Mon, 5 Oct
10:00 am
Tender details
- Organisation
- Bharat Coking Coal Limited
- Location
- Central Government
- Tender ID
- 2026_BCCL_366040_1
- Reference no.
- BCCL/PO/MCW/E -Tender/2026-27/011 date- 24.09.2026
- Category
- Machinery & Equipment
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_BCCL_366040_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from Bharat Coking Coal Limited
All their tenders →- Work of Repairing of test weights of 60Te Jamunia Road Weighbridge.
Bharat Coking Coal Limited · Central Govt
Mon, 28 Sept5:00 pm · Today
- Remodeling and up gradation for working space at Director Finance Deptt. And CMS Deptt. at Admin block of Koyla Bhawan
Bharat Coking Coal Limited · Central Govt
Mon, 28 Sept5:00 pm · Today
- Annual Maintenance contract of 40 T Jamunia Road weighbridge running under Block-II Area
Bharat Coking Coal Limited · Central Govt
Mon, 28 Sept5:00 pm · Today
- Cleaning of Drain and dustbin at Budora colony, khodovally colony, barora colony, Dugdha township and Madhuban Colony under Barora area
Bharat Coking Coal Limited · Central Govt
Mon, 28 Sept6:00 pm · Today
- Electrical safety related works of 550V belt circuit and providing and fitting of different safety signals and items at Moonidih Project of WJ Area
Bharat Coking Coal Limited · Central Govt
Mon, 28 Sept6:00 pm · Today
Similar live tenders
Machinery & Equipment in Central Govt →Mon, 28 Sept6:00 pm · Today
- Clutch Release BRG, Field Coil Assy 24V, Expension Valve, Timing Belt, Suspension Bush Kit, Disc Pad, Kit Lined Shoe Assy, Silencer Complete, Hand Brake Cable, Condensor Fan Assy, Electric Fan Assy
Department of Military Affairs · Central Govt
Wed, 30 Sept2:00 pm · 2 days left
- Complete Manufacture of Silencer, Suction Hood, Roof with Lug- All Including Trail Assembly and Packing with Vendors Own Raw Material
Bharat Heavy Electricals Limited · Central Govt
Mon, 5 Oct11:00 am · 7 days left
- Reverse Light Switch, Performed Hose, Suspension Bush, Siren, Temp Transducer, Oil Filter, Head Light Bulb, Field Coil Assy 24V, Chain Sprocket Kit, Assy Head Lamp With Helogen Bulb RH, Wiper Linkage, 352 Dia clutch Disc Assy, Main Cable Harness, Solenoid Switch 12V, Brush Carrier Assy 12V, Bearing Bush CE, Engine Mounting Pad, Silencer Complete, Fog Light, Spider Bearing
Department of Military Affairs · Central Govt
Mon, 28 Sept8:00 pm · Today
- Supply of Complete Break Assembly with Break Coil. Break Liner, Etc for Indef Make 2 Ton Capacity Wi
Department of Defence Production · Central Govt
Mon, 28 Sept5:00 pm · Today
- Clutch Plate, Cabin Lifting Pipe, Speedometer Cable, Wheel Bearing, Clutch Release Bearing, Clutch Cylinder Assembly, Sleeve Cylinder Assembly, Transfer Case oil Seal, Gear Box Oil Seal, Rear Wheel Cylinder Repair Kit, Front Wheel Cylinder Repair kit, Gear Lever Kit
Department of Military Affairs · Central Govt
Thu, 8 Oct1:00 pm · 10 days left