Carting, installation of firehydarant on bypass chamber, construction /renovation of bypass chamber of tubewell and other required work in tubewell campus like bricksolling etc for Magh Mela 2026-27
by U P Jal Nigam (HQ), Lucknow
Published
Fri, 18 Sept
6:30 pm
Bid submission closes
Fri, 16 Oct
5:00 pm· 18 days left
Bid opening
Sat, 17 Oct
2:00 pm
Tender details
- Organisation
- U P Jal Nigam (HQ), Lucknow › Chief Engineer (Allahabad) › SE, Yantrik Circle, Allahabad › PM, Ganga Pollution Control Unit (II) E-M, Alld
- Location
- Uttar Pradesh
- Tender ID
- 2026_UPJNM_1187617_1
- Reference no.
- 897/ Nivida /67 dated 15-09-2026
- Category
- Water & Sanitation
- Source portal
- Uttar Pradesh eProcurement
How to bid
- 1Open Uttar Pradesh eProcurement and search for Tender ID 2026_UPJNM_1187617_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from U P Jal Nigam (HQ), Lucknow
All their tenders →- Construction of MPS and 7.0 MLD capacity STP with 6.50 KLD Co Trearment Plant
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Mon, 28 Sept5:00 pm · Today
- Drainage Work in Magh Mela 2027
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Mon, 28 Sept5:00 pm · Today
- Water Supply in Magh Mela 2027
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Mon, 28 Sept5:00 pm · Today
- Interception and Diversion Work with STP and Co Treatment Plant at Nagar Palika Parishad Konch District Jalaun
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Mon, 28 Sept5:00 pm · Today
- Gorakhpur Sewerage Scheme ZOne A3
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Tue, 29 Sept12:00 pm · Tomorrow
Similar live tenders
Water & Sanitation in Uttar Pradesh →- Shifting, Loading, Carting and Unloading Installation, Testing, Commissioning and Dismentalling after Mela of the Pumping Plant (28 Nos), Dozer (56 Nos), D.G. set (28 Nos) and Stabilizer etc all complete from Mela Store to different Tubewell site in
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Thu, 15 Oct5:00 pm · 17 days left
- Laying of 200 DI K7 Rising Main Pipe Line at Nagina Road Bypass to Tubewell
Directorate of Local Bodies UP · Uttar Pradesh
Mon, 5 Oct12:00 pm · 7 days left
- Bypass Road isthit Talab ke pass adhisthapit Tubewell ke pass se Puliya ke pass tak DI pipe se main Pipe Line Vistar Karya.
Directorate of Local Bodies UP · Uttar Pradesh
Fri, 9 Oct11:00 am · 11 days left
- Tubewell 150MM Id upto 80 MTR with Percussion Rig Pump Chamber Ohsr 25000 LTR Machinery UPVC Pipe Line Rising Main Etc for Aug WS Scheme Naushera and Channi 186 Block Gharota Distt Pathankot Under NABARD XXXI 4215
Water Supply and sanitation · Punjab
Mon, 5 Oct12:00 pm · 7 days left
- Tubewell 200MM Id upto 110 MTR with Direct Rotary Rig Pump Chamber Ohsr 50000 LTR Machinery UPVC Pipe Line Rising Main Etc for Aug WS Scheme Ferozepur Khurd and Kunda Block Gharota Distt Pathankot Under Head NABARD XXXI State Share 4215
Water Supply and sanitation · Punjab
Mon, 5 Oct12:00 pm · 7 days left
- Installation of a mini-tubewell for drinking water supply in Ward No. 17 (Manipuram) and related construction works.
Directorate of Local Bodies UP · Uttar Pradesh
Mon, 5 Oct11:00 am · 7 days left