Construction of MPS and 7.0 MLD capacity STP with 6.50 KLD Co Trearment Plant
by U P Jal Nigam (HQ), Lucknow
Published
Thu, 20 Aug
3:00 pm
Bid submission closes
Mon, 28 Sept
5:00 pm· Today
Bid opening
Mon, 28 Sept
6:00 pm
Tender details
- Organisation
- U P Jal Nigam (HQ), Lucknow › Chief Engineer (Lucknow) › SE, 3rd Circle, Lucknow › EE Construction Division Sitapur
- Location
- Uttar Pradesh
- Tender ID
- 2026_UPJNM_1178223_1
- Reference no.
- 2073/M-13/158 DT 17.08.2026
- Category
- Civil Works
- Source portal
- Uttar Pradesh eProcurement
How to bid
- 1Open Uttar Pradesh eProcurement and search for Tender ID 2026_UPJNM_1178223_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from U P Jal Nigam (HQ), Lucknow
All their tenders →- Drainage Work in Magh Mela 2027
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Mon, 28 Sept5:00 pm · Today
- Water Supply in Magh Mela 2027
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Mon, 28 Sept5:00 pm · Today
- Interception and Diversion Work with STP and Co Treatment Plant at Nagar Palika Parishad Konch District Jalaun
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Mon, 28 Sept5:00 pm · Today
- Gorakhpur Sewerage Scheme ZOne A3
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Tue, 29 Sept12:00 pm · Tomorrow
- Construction of 02 Nos. R.C.C. Manholes by well sinking Method and other related work near Arya Samaj Mandir and Beauty Touch Salon on Ram Chandra Mission Road, Mundera in Sewerage District- E of Nagar Nigam Prayagraj
U P Jal Nigam (HQ), Lucknow · Uttar Pradesh
Tue, 29 Sept5:00 pm · Tomorrow
Similar live tenders
Civil Works in Uttar Pradesh →- Construction of STP Plant as per required capacity (Approx 0.4 MLD), construction of drain and other ancillary work at Ara.
Ministry of Railways · Central Govt
Mon, 5 Oct12:00 pm · 7 days left
- Repair to STP Machineries Plant of Capacity 240 KLD Installed
Department of Military Affairs · Central Govt
Mon, 28 Sept7:00 pm · Today
- Construction of STP of Cap. of 20 MLD and Const. of MPS cap. of 45 MLD Peak Flow including 5 Years O and M and all other alied works at Ferozepur Town Distt Ferozepur under AMRUT 2.0 Scheme.
Department of Local Government · Punjab
Wed, 30 Sept1:00 pm · 2 days left
- Mandothi Construction of 1 No. 2.50 MLD STP based on SBR Technology at Mandothi including MPS, RCC collecting tanks, screening chambers, pump chambers, boundary walls, roads, HT/LT panel room, PLC room, blower room, centrifuge house, lab cum office
Haryana Government · Haryana
Thu, 15 Oct3:00 pm · 17 days left
- Design and Construction of Sewage Treatment Plant (STP) of 5.0 MLD capacity at Sindhi Nallah Section with Interception And Diversion (IandD) works along with Gravity Main works of ITARSI Used Water Management Project under SBM 2.0
Directorate Urban Administration and Development · Madhya Pradesh
Mon, 19 Oct5:30 pm · 21 days left
- Construction of 5 MLD Capacity STP with Co treatment units at Elamkulam for Kochi Corporation under AMRUT 2 0
Kerala Water Authority · Kerala
Tue, 29 Sept3:00 pm · Tomorrow