Development of a Link/Connector Corridor connecting the NH 31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG 1 from Km 0.000 to Km 11.744 (TL 28.498 Km including MCW/Flyover/Loop/Ramp/Link Road) in UP on HAM.
by National Highways Authority of India
Published
Fri, 19 Jun
6:00 pm
Bid submission closes
Wed, 7 Oct
11:00 am· 9 days left
Bid opening
Thu, 8 Oct
11:30 am
Tender details
- Organisation
- National Highways Authority of India
- Location
- Central Government
- Tender ID
- 2026_NHAI_281477_1
- Reference no.
- NHAI/HQ/ UP(E)/Varuna Corridor/ Pkg-1
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_NHAI_281477_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from National Highways Authority of India
All their tenders →- Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
- 6 laning of Pani-Jal section of NH-I from Km.96.000 to Km.387.100 in the State of HR and PB to be executed asBOT (Toll) on DBFO Pattern under NHDP Phase-V Balance BC Overlay Works between km. 96.000 and km.387.100 (Balance stretches in HR and PB
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
- 6 laning of Pani-Jal section of NH-I from Km.96.000 to Km.387.100 in the State of HR and PB to be executed asBOT (Toll) on DBFO Pattern under NHDP Phase-V Balance BC Overlay Works between km. 96.000 and km.387.100 (Balance stretches in HR and PB
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
- Engagement of user fee collection agency on the basis of EQ through e tender at Kozhinjipatti Toll Plaza at Km 392.921 for the Dindigul Samayanallur section from Km 373.726 to Km 426.775 in Tamil Nadu
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
- Construction of 6L GF AC Indore Eastern Bypass starting from DC KM 64.000 near Pirkaradiya village and ending at DC KM 113.000 on NH 347BG near village Simrol/Datoda PKG 1 of Indore and Dewas district in Madhya Pradesh on HAM Mode. L 49.00 Km
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
Similar live tenders
Civil Works in Central Govt →- Development of a Link Connector Corridor connecting the NH-31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG2 from Km11.744-km19.420 (TL 14.720Km including Loop Ramp) in the State of Uttar Pradesh on HAM
National Highways Authority of India · Central Govt
Thu, 8 Oct11:00 am · 10 days left
- Development of a Link/Connector Corridor connecting the NH 31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG 1 from Km 0.000 to Km 11.744 (TL 28.498 Km including MCW/Flyover/Loop/Ramp/Link Road) in UP on HAM.
National Highways Authority of India · Central Govt
Wed, 7 Oct11:00 am · 9 days left
- Development of a Link Connector Corridor connecting the NH-31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG2 from Km11.744-km19.420 (TL 14.720Km including Loop Ramp) in the State of Uttar Pradesh on HAM
National Highways Authority of India · Central Govt
Thu, 8 Oct11:00 am · 10 days left
- Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
National Highways Authority of India · Central Govt
Wed, 30 Sept11:00 am · 2 days left
- Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
National Highways Authority of India · Central Govt
Wed, 30 Sept11:00 am · 2 days left
- Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (TL 26.039Km MCW FOB Loop Ramp) in UP on HAM
National Highways Authority of India · Central Govt
Thu, 1 Oct11:00 am · 3 days left