IE Services for development of Link CC between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg1 from Km0.000-Km7.926 (20.000 Km MCW Loop RampLink Road) in Uttar Pradesh on HAM
by National Highways Authority of India
Published
Thu, 13 Aug
9:05 am
Bid submission closes
Tue, 13 Oct
11:00 am· 15 days left
Bid opening
Wed, 14 Oct
11:30 am
Tender details
- Organisation
- National Highways Authority of India
- Location
- Central Government
- Tender ID
- 2026_NHAI_287464_1
- Reference no.
- UPDIV-21013/253/2026-UP Division/E-323354
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_NHAI_287464_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from National Highways Authority of India
All their tenders →- Monthly Basis Cab & Taxi Hiring Services - SUV; 3500 km x 720 hours; Outstation 24*7
National Highways Authority of India · Central Govt
Mon, 28 Sept5:00 pm · 48 min left
- Diesel Power Generator (V2)
National Highways Authority of India · Central Govt
Mon, 28 Sept7:00 pm · Today
- Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
- 6 laning of Pani-Jal section of NH-I from Km.96.000 to Km.387.100 in the State of HR and PB to be executed asBOT (Toll) on DBFO Pattern under NHDP Phase-V Balance BC Overlay Works between km. 96.000 and km.387.100 (Balance stretches in HR and PB
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
- Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
National Highways Authority of India · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
Similar live tenders
Civil Works in Central Govt →- IE Services for development of Link CC between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (26.039 Km including MCW FOB Loop Ramp) in UUP on HAM
National Highways Authority of India · Central Govt
Tue, 13 Oct11:00 am · 15 days left
- IE Services for development of Link CC between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg1 from Km0.000-Km7.926 (20.000 Km MCW Loop RampLink Road) in Uttar Pradesh on HAM
National Highways Authority of India · Central Govt
Tue, 13 Oct11:00 am · 15 days left
- IE Services for development of Link CC between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (26.039 Km including MCW FOB Loop Ramp) in UUP on HAM
National Highways Authority of India · Central Govt
Tue, 13 Oct11:00 am · 15 days left
- Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
National Highways Authority of India · Central Govt
Wed, 30 Sept11:00 am · 2 days left
- Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
National Highways Authority of India · Central Govt
Wed, 30 Sept11:00 am · 2 days left
- Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (TL 26.039Km MCW FOB Loop Ramp) in UP on HAM
National Highways Authority of India · Central Govt
Thu, 1 Oct11:00 am · 3 days left