Bridge & Culvert · CPPP tenders
72 live·updated 8 min ago
72 Bridge & Culvert · CPPP tenders are open for bids. Most are for civil works (66), consultancy & survey (3) and electrical & power (2). The busiest buyers are Ministry of Railways and National Rural Roads Development Agency (NRRDA).
Refine by state / ut, category, department, portal
State / UT
Department
PortalClear
- Uttar Pradesh eProcurement200
- Jammu and Kashmir eProcurement98
- CPPP — Central Public Procurement Portal72
- Kerala eProcurement59
- Madhya Pradesh eProcurement33
- GeM — Government e-Marketplace33
- Tamil Nadu eProcurement32
- Odisha eProcurement30
Show 14 more
- Himachal Pradesh eProcurement18
- Punjab eProcurement17
- Jharkhand eProcurement16
- Haryana eProcurement11
- Maharashtra eProcurement8
- Defence eProcurement7
- Rajasthan eProcurement6
- Delhi eProcurement6
- Uttarakhand eProcurement5
- Central Govt eProcurement (NIC)5
- Central PSU eTenders4
- Puducherry eProcurement3
- Tripura eProcurement1
- Goa eProcurement1
Rockfall protection, slope stabilization and Debris Flow Protection alongwith other associated miscellaneous works for vulnerable locations from Kheraund (Excluding) to Major Bridge 108 (Excluding ) and Km. 41.500 to 42.220 (on Left Side in increasing chainage direction) & Km. 41.710 to 41.900 (on Right Side in increasing chainage direction) in connection with new BG Line between Tilaiya to Koderma under the jurisdiction of Dy.CE/Construction/ Dhanbad
Ministry of Railways · Central Govt · CPPP
90620409Published 26 Sept 2026
Fri, 23 Oct3:00 pm · 25 days left
Replacement of 0.61 mt. multiple span bridges (06 nos bridges) by RCC box bridge in DNA-MTD section in the Jurisdiction of DEN/North
Ministry of Railways · Central Govt · CPPP
92216668Published 26 Sept 2026
Tue, 20 Oct3:00 pm · 22 days left
Engagement Of Consultant for Providing Consultancy Services Including Preparation of DPR for Construction of 04 Nos of Bridges
National Rural Roads Development Agency (NRRDA) · Central Govt · CPPP
2026_KSRRD_149642_1Published 26 Sept 2026
Sat, 3 Oct4:30 pm · 5 days left
Provision of 3.0 meter wide Foot over Bridge (FOB) at Sariabanjara (SBJ) Railway station.
Ministry of Railways · Central Govt · CPPP
92244010Published 26 Sept 2026
Sat, 17 Oct2:00 pm · 19 days left
Reconstruction of Damaged Pipe Culverts - 2 Nos. (Ch.108/000 and 127/500), Slab Culverts - 4 Nos. (Ch.113/800, 114/900, 118/600 and 127/000), and Minor Bridge at Ch. 15/900 on NH-927A
Ministry of Road Transport and Highways · Central Govt · CPPP
2026_MoRTH_927843_5Published 26 Sept 2026
Mon, 26 Oct11:00 am · 28 days left
Tue, 13 Oct2:25 pm · 15 days left
Balance work of Execution of Earthwork in formation, Blanketing and Construction of Minor Bridge no. 40, 44, 46, 53 & 60 between the section of Mehdawal (excluding) to Kheshraha (excluding) in connection with Khalilabad- Bahraich new B.G Rail line Project.
Ministry of Railways · Central Govt · CPPP
92145203Published 26 Sept 2026
Thu, 22 Oct3:00 pm · 24 days left
Vadodara Division: Construction of Road Over Bridge including approaches in lieu of LC 299 at Km 478/32-34 & LC 300 at Km 482/6-8 on Vadodara-Geratpur section.
Ministry of Railways · Central Govt · CPPP
91922924Published 25 Sept 2026
Tue, 27 Oct3:00 pm · 29 days left
Provision of 6m wide foot Over Bridge with lifts at Chandannagar station.
Ministry of Railways · Central Govt · CPPP
92325211Published 25 Sept 2026
Mon, 19 Oct2:00 pm · 21 days left
Upgradation of the lighting system for Saraighat Bridge.
Ministry of Railways · Central Govt · CPPP
92295075Published 25 Sept 2026
Fri, 16 Oct3:00 pm · 18 days left
Improvement to various bridges by repairing of pitching, steps, protecting of piers, abutments, by scouring and other Misc. works in the jurisdiction of Sr. DEN/South of Jodhpur Division
Ministry of Railways · Central Govt · CPPP
92275464Published 25 Sept 2026
Thu, 22 Oct3:00 pm · 24 days left
Replacement of existing pipe bridges below of size 0.90m Dia in to RCC Box bridges in the jurisdiction of Sr. DEN/South of Jodhpur Division.
Ministry of Railways · Central Govt · CPPP
91923731Published 25 Sept 2026
Thu, 22 Oct3:00 pm · 24 days left
Construction of RCC Pile Foundation Bridge over BAGJHORA River Bearing Road Package No.WB21155, PKG No WB21166
National Rural Roads Development Agency (NRRDA) · Central Govt · CPPP
2026_WBSRD_149633_4Published 25 Sept 2026
Thu, 15 Oct3:00 pm · 17 days left
Construction of RCC Pile Foundation Bridge over KAJLI River Bearing Road Package No.WB21134, PKG No WB21164
National Rural Roads Development Agency (NRRDA) · Central Govt · CPPP
2026_WBSRD_149633_3Published 25 Sept 2026
Thu, 15 Oct3:00 pm · 17 days left
Construction of RCC Pile Foundation Bridge over MOONSANG River Bearing Road Package No.WB21126, PKG No WB2198
National Rural Roads Development Agency (NRRDA) · Central Govt · CPPP
2026_WBSRD_149633_2Published 25 Sept 2026
Thu, 15 Oct3:00 pm · 17 days left
A site Retail Outlet at ON SH19 Within 2km From Tumpreng Bridge Towards Donkamukam under Tinsukia Divisional office under IndianOil AOD state office
IndianOil · Central Govt · CPPP
2026_ERO_191554_1Published 25 Sept 2026
Sat, 3 Oct6:00 pm · 5 days left
Construction of RCC Pile Foundation Bridge over DHOWLAJHORA River Bearing Road Package No.WB21131, PKG WB21165
National Rural Roads Development Agency (NRRDA) · Central Govt · CPPP
2026_WBSRD_149633_1Published 25 Sept 2026
Thu, 15 Oct3:00 pm · 17 days left
Construction of RCC Bridge on PMGSY Road L030 Tarun Sangha Football Ground at Dakshin Padamati To Helapakri within Maynaguri Block, District-Jalpaiguri, vide Package No.WB10264BR1 at Padamati Chainage 0.015 km
National Rural Roads Development Agency (NRRDA) · Central Govt · CPPP
2026_WBSRD_149627_1Published 25 Sept 2026
Thu, 15 Oct3:00 pm · 17 days left
Painting and metalizing of steel girder bridge & ROBs on Bhopal division.
Ministry of Railways · Central Govt · CPPP
90809563Published 25 Sept 2026
Wed, 21 Oct3:30 pm · 23 days left
Construction of Foundation, Substructure and Superstructure of Important Bridge No. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m OPEN WEB GIRDER Spans, including Pile Foundation and 800 m Approaches, for Single-Line Railway Track conforming to RDSO 25 T Axle Load Standard and Substructure designed for 32.5 T Loading over River Barakar between Barakar and Kumardubi Stations from Km 229/30 to Km 230/16 (F/HWH), of Eastern Railway
Ministry of Railways · Central Govt · CPPP
90918790Published 25 Sept 2026
Tue, 3 Nov2:00 pm · 36 days left
(i)Repairs to Sump Well, Recharge Pit, Retaining wall, Pointing, Painting, Desilting/Cleaning and other miscellaneous works at LHS on RPJ-DUI, LDH-Dui, DUI-HSR section under ADEN/PTA. (ii) Repair and Painting of FOB S at various station, Damaged protection screens of ROB on BTI-DUI section. (iii) Repair and maintenance of Various LHS and Minor Bridges on BTI-SGNR Section.
Ministry of Railways · Central Govt · CPPP
92295349Published 25 Sept 2026
Mon, 19 Oct3:00 pm · 21 days left
Preparation of Bridge DPR Including Investigation Design and Drawing Malachinnar Kallarmukku Thooval Bridge Span 18m- (Re-E-Quotatiob)
National Rural Roads Development Agency (NRRDA) · Central Govt · CPPP
2026_KSRD_149635_2Published 25 Sept 2026
Sat, 3 Oct5:00 pm · 5 days left
Preparation of Bridge DPR Including Investigation Design and Drawing Chembanthodu Kuruvakkayam Poomala Bridge Span 40mt - (Re-E-Quatation)
National Rural Roads Development Agency (NRRDA) · Central Govt · CPPP
2026_KSRD_149635_1Published 25 Sept 2026
Sat, 3 Oct5:00 pm · 5 days left
Repair to Drain Culvert and Dustbin at Various Location Under Age B/R-I of GE (Af) Adm Area Agra at Af Station Agra
E-in-C Branch - Military Engineer Services · Central Govt · CPPP
2026_MES_791073_1Published 25 Sept 2026
Fri, 16 Oct6:00 pm · 18 days left
Construction of Platforms, Earthwork/ blanketing in formation/cutting, Retaining Wall & Drain, RUB, FOB, Minor Bridge (Br.No.466/2, 467/1, 467/2, 467/3, 467/4, 468/1, 468/2, 469/1), Station building(G+1) and station building compound wall, Water tank, toilet, RUB Pump house, Road, etc. work and Dismantling and Track Works for Nimbhora Yard Remodelling, including Ballast Supply in connection with BSL-KNW 3rd and 4th line (131km) project of Central Railway. (Two packet System).
Ministry of Railways · Central Govt · CPPP
91888105Published 25 Sept 2026
Mon, 19 Oct11:00 am · 21 days left