Repair and maintenance of one (01) no. 3MVA 11KV/3.3KV transformer of GEC make sl. No. 4868 installed at Gandhinagar Substation, Bokaro Colliery, BNk Area
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_366242_2Published 26 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Onsite repairing and overhauling of 8 (Eight) Nos. of 11 kV n 3.3 kV grade, 400 Amps grade HT Circuit Breakers of various makes, provided for control of different feeders (incoming feeder, transformer secondary, pump feeder, shovel feeder and others
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_366242_1Published 26 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Repair and maintenance of 4 nos. DG sets installed at P.O. office, Sub-station, Gunjardih magazine and CISF A coy, Karipani in r/o SDOCM Project Dhori Area.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_366186_1Published 26 Sept 2026
Wed, 7 Oct12:00 pm · 9 days left
Comprehensive Annual Maintenance of electrical equipments installed at 2X 10 MVA Main Murpa Substation under GM Unit Kuju Area for a period of 01 year.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_366173_1Published 25 Sept 2026
Mon, 12 Oct6:55 pm · 14 days left
Installation of MCCB, GOAB, Earth Pit and other accessories for Kamal Tola Transformer of Kathara Colliery.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_366170_1Published 25 Sept 2026
Tue, 6 Oct6:00 pm · 8 days left
A. Repairing of DG set 100KVA at Central Hospital, Dhori under G.M. unit, Dhori Area. B. Repairing of 3 Nos DG sets at Raja Bungalow CISF Camp and G.M. office Sub-station under G.M. unit, Dhori Area.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365692_1Published 24 Sept 2026
Mon, 5 Oct10:00 am · 7 days left
Replacement of unserviceable silica gel with breather of different transformer at different places under Jarangdih Colliery.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365922_1Published 22 Sept 2026
Mon, 5 Oct10:00 am · 7 days left
Supply and installation of 3.3KV Grade, 190 ohms, 10A NGR with safety features and accessories required to be installed with 1MVA, 11KV/3.3KV Transformer at Mine substation of Karma Project under Kuju Area.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365913_1Published 22 Sept 2026
Sat, 3 Oct6:55 pm · 5 days left
Supply, Installation and commissioning of DC Distribution board sets, battery charging set and substation lighting indoor and outdoor with allied work of Sarubera Project under Kuju Area.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365781_1Published 19 Sept 2026
Tue, 29 Sept6:55 pm · Tomorrow
Online filtration of transformer oil and providing and fixing of safety devices for different transformers installed at Jarangdih Colliery.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365680_1Published 18 Sept 2026
Tue, 29 Sept10:00 am · Tomorrow
Repair, maintenance and reconditioning of 03 Nos. VCB switches (11KV and 3.3KV) and 01 No. 33KV, SF6 Breaker along with control panel and erection of sky-netting at Main substation (5 MVA) of Sirka Colliery under Argada Area.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365666_1Published 17 Sept 2026
Mon, 28 Sept11:00 am · Today
(A) Complete rewinding/repairing of 63 KVA, 6.6K VA/ 3.3K V 4 Volt Oil cooled auxiliary transformer of EKG -5A Shovel Sl. No - Exc 2859 and (B) Complete rewinding/repairing of 15 K VA 6.6KVM415 Volt air cooled auxiliary transformer of BE- 195 Shovel
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365615_1Published 16 Sept 2026
Mon, 28 Sept9:00 am · Today
Providing and fixing safety and statutory electrical installations at substations, check posts, weighbridges and transformer location at Diya Tola village
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365602_1Published 16 Sept 2026
Mon, 28 Sept5:00 pm · Today
Repairing maintenance of 02 nos. NGR installed at main substation with 02 nos. Power Transformer 3 MVA 11KV-3.3KV N 1 MVA, 11 KV-3.3 KV at Tapin North OCP, Hazaribagh Area.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365590_1Published 16 Sept 2026
Tue, 29 Sept10:00 am · Tomorrow
A)Installation and erection 11KV bus bar with foundation at main substation.B) Power supply arrangement to office of Sarubera Project under Kuju Area.C)Erection of 11 kV overhead line from main substation to crusher substation under Sarubera Project.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365519_1Published 15 Sept 2026
Thu, 1 Oct6:55 pm · 3 days left
Supply and fixing of double interposing gland bush in different interlocking control box and switches at main substation 33KV/11KV/3.3KV of PEOCP under Hazaribagh Area.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365517_1Published 15 Sept 2026
Thu, 1 Oct11:00 am · 3 days left
Repairing and maintenance of (i) 550V, 200A, Proto India make star-delta starter, (ii) 250 KVA, 3.3KV/440V transformer and (iii) 90 KW, 550V, 1470 RPM Marathon make motor, of KUGP.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_365455_1Published 14 Sept 2026
Wed, 30 Sept11:00 am · 2 days left