Machinery & Equipment · CPPP tenders
160 live·updated 5 min ago
160 Machinery & Equipment · CPPP tenders are open for bids. The busiest buyers are Ministry of Railways and E-in-C Branch - Military Engineer Services.
Branding and Fabrication
Hindustan Petroleum Corporation Limited · Central Govt · CPPP
137089Published 27 Sept 2026
Mon, 19 Oct3:00 pm · 21 days left
Insulating Rod Assembly for Positive & Negative Support Insulator for Hitachi TM Type HS-15250A to DRG.No. Skel-4439, ALT-1, REF: 1 TO 4. NOTE: One sample set should be got approved before effecting bulk supply. (As per UVAM ID:2101199).
Ministry of Railways · Central Govt · CPPP
107197735Published 26 Sept 2026
Tue, 20 Oct2:30 pm · 22 days left
C/S of Side wall Frame Work, Welding Parts and Carline (LWACCN PP)
Ministry of Railways · Central Govt · CPPP
107197710Published 26 Sept 2026
Fri, 23 Oct2:15 pm · 25 days left
Electronic Weighing Machine
Ministry of Railways · Central Govt · CPPP
107197705Published 26 Sept 2026
Mon, 26 Oct11:00 am · 28 days left
Body Bolster Assembly (VB Sleeper MC, NDTC, TC & DTC)
Ministry of Railways · Central Govt · CPPP
107195195Published 26 Sept 2026
Mon, 5 Oct2:15 pm · 7 days left
List of Consumables for CNC Air Plasma Cutting Machine of Make: Kjellberg 1) Nozzle - Kjellberg Part Code-F2010 ( or) Equivalent =100 Nos. 2) Nozzle - Kjellberg Part Code-F2012 ( or) Equivalent = 50 Nos. 3) Swirl Cap - Kjellberg Part Code-F4030 ( or) Equivalent = 100 Nos. 4) Gas Guide - Kjellberg Part Code-F101C ( or) Equivalent = 20 Nos. 5) Cathode - Kjellberg Part Code-F005 (or) Equivalent = 40 Nos. 6) Cathode - Kjellberg Part Code-F012 (or) Equivalent = 250 Nos. 7) Nozzle Cap - Kjellberg P
Ministry of Railways · Central Govt · CPPP
107197693Published 26 Sept 2026
Mon, 12 Oct10:30 am · 14 days left
Wed, 30 Sept2:00 pm · 2 days left
Mon, 5 Oct11:00 am · 7 days left
C/S of Sidewall Assembly (VB Sleeper NDTC CW)
Ministry of Railways · Central Govt · CPPP
107194463Published 26 Sept 2026
Tue, 20 Oct2:15 pm · 22 days left
Manual Metal Arc Welding Electrode of size 4.00 x 350mm, Class M5, Type of Coating: Heavy (Spec. No. IRS M: 28-2020, Code E18.8MnR26 as per IS: 5206-2019) Note: The shelf life of the electrodes shall be 12 months from the date of receipt in stores or 18 months from the date of manufacture whichever is more.
Ministry of Railways · Central Govt · CPPP
107197673Published 26 Sept 2026
Wed, 21 Oct2:30 pm · 23 days left
Repairing work of damaged cylindrical area nearby surround-ing base portion and Rail path and live ring assembly of 24 96 Saurav and Gaurav Dragline
Northern Coalfields Limited · Central Govt · CPPP
2026_NCL_366230_1Published 26 Sept 2026
Fri, 9 Oct10:00 am · 11 days left
A)Repairing and maintenance of pipeline from quarry no.1 to Pundi filter plant along with dismantling and installation of 1000 GPM pump.B) Construction of 2 nos foundation for 1000GPM pump and motor set at Quarry no.1 of pundi project.
Central Coalfields Limited · Central Govt · CPPP
2026_CCL_366241_1Published 26 Sept 2026
Tue, 6 Oct6:55 pm · 8 days left
Procurement of AFDSS SPARES for TATA HITACHI EX1900
Northern Coalfields Limited · Central Govt · CPPP
2026_NCL_366223_1Published 26 Sept 2026
Wed, 28 Oct6:55 pm · 30 days left
Weld Trimmer Power Pack Version For A.T. Welding
Ministry of Railways · Central Govt · CPPP
107197664Published 26 Sept 2026
Mon, 19 Oct2:30 pm · 21 days left
Maintenance of pressurized flushing system/Electro-pneumatic pressurized flushing system (EPPFS) fitted in LHB coaches during SS2/SS3 repairs
Ministry of Railways · Central Govt · CPPP
92316991Published 26 Sept 2026
Mon, 26 Oct5:00 pm · 28 days left
Repairing of Anti Roll Bar Bracket and Bearing Assembly of FIAT Bogie.
Ministry of Railways · Central Govt · CPPP
92328084Published 26 Sept 2026
Mon, 26 Oct5:00 pm · 28 days left
Fabrication of rear view mirrors for 190T CAT-789 Dumpers of Amlohri Project
Northern Coalfields Limited · Central Govt · CPPP
2026_NCL_366203_1Published 26 Sept 2026
Fri, 9 Oct11:00 am · 11 days left
Repairs/ Replacement/Maint of Spare Parts and Overhauling of Pump Sets of Various Rating and Starter Panel Connected Accessories and Cleaning of Oh Reservoir/Ug Sumps Under the Aor of GE Deolali
E-in-C Branch - Military Engineer Services · Central Govt · CPPP
2026_MES_791398_1Published 26 Sept 2026
Sat, 17 Oct6:00 pm · 19 days left
Maint works related to flushing of various borewells and repair of pump, motor, starter and allied wks at Bdg area, Engr Sqn, 2 ASD, under AOR of AGE (I) Nyoma
E-in-C Branch - Military Engineer Services · Central Govt · CPPP
2026_MES_778897_3Published 26 Sept 2026
Mon, 5 Oct6:00 pm · 7 days left
Repair replacement and improvement to defective parts overhauling of compressor hot and cold water pipeline insulations AHU filters heaters descaling of condensor chiller and their defective accessories certain essential spares and other allied wor
E-in-C Branch - Military Engineer Services · Central Govt · CPPP
2026_MES_791233_1Published 26 Sept 2026
Sat, 24 Oct6:00 pm · 26 days left
Repair/Maint of Centrifugal Pump Sets, Monoblock Pump Sets, Submersible Pump Sets and Connected Items in Zone B Under Age E/M-I of GE Dehradun
E-in-C Branch - Military Engineer Services · Central Govt · CPPP
2026_MES_791284_1Published 26 Sept 2026
Mon, 19 Oct6:00 pm · 21 days left
Complete Machining of Set of Top Bracket Centre and Arm Assembly Conforming to Drawings 12560110709 Rev- 01,12560110711 REV-02, 22560110702 REV-01, Annexure-A, T-PQRHGM/ 2413-Chilla and Qap No. QP/HGM/Topbracket and ARM/01.
Bharat Heavy Electricals Limited · Central Govt · CPPP
2026_BHEL_65495_1Published 26 Sept 2026
Tue, 6 Oct6:00 pm · 8 days left
Repair replacement and improvement to defective parts overhauling of compressor hot and cold water pipeline insulations AHU filters heaters descaling of condensor chiller and their defective accessories certain essential spares and other allied works
E-in-C Branch - Military Engineer Services · Central Govt · CPPP
2026_MES_791315_1Published 26 Sept 2026
Sat, 24 Oct6:00 pm · 26 days left
Repair replacement and improvement to defective parts, overhauling of compressor hot and cold water pipeline insulations AHU filters heaters descaling of condensor chiller and their defective accessories certain essential spares and other allied wo
E-in-C Branch - Military Engineer Services · Central Govt · CPPP
2026_MES_791277_1Published 26 Sept 2026
Sat, 24 Oct6:00 pm · 26 days left
Fabrication of 04Nos Engine Guards and 4Nos Transmission Guards of 04Nos Motor Graders (MG25165, 25170, 25206, 25208) of Amlohri Project
Northern Coalfields Limited · Central Govt · CPPP
2026_NCL_366207_1Published 26 Sept 2026
Fri, 9 Oct11:00 am · 11 days left