Electrical & Power · Bharat Coking Coal Limited tenders
33 live·updated 2 h ago
33 Electrical & Power · Bharat Coking Coal Limited tenders are open for bids.
Refine by state / ut, category, department, portal
State / UT
CategoryClear
- Electrical & Power33
- Other31
- Machinery & Equipment28
- Civil Works13
- Manpower & Services10
- Water & Sanitation5
- Vehicles & Transport1
- IT & Electronics1
Show 1 more
DepartmentClear
Towards patch repairing of a transformer 1000KVA, 6.6KV/550V Asst. Reg.No.ARN/12A at Loyabad Colliery under Sijua Area
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366222_1Published 26 Sept 2026
Wed, 7 Oct5:00 pm · 9 days left
(i)For Maintenance of one no.1 MVA 6.6KV/550V Transformer installed at Loyabad Colliery Make-ECE, Asset Sl.No.ARN/14 LBC(ii)Complete Rewinding and Overhauling of a 750 KVA Power Transformer 6.6KV/550V at 5 Pit Substation of LBC Make-ECE Asset.No.LOY/E
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366216_1Published 26 Sept 2026
Wed, 14 Oct5:00 pm · 16 days left
Cable Jointing Hanging Laying as per require at Bastacolla Guest House and Laboratory under Bastacolla Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365987_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Repairing and Replacement of 70 No Picks and Holder of Atlas Copco Make Feeder Breaker Crusher Drum at BNR Siding ROCP/SJ.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365981_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Repairing of 300HP Auto Starter 550V Amba Speed Make ATS Type Control Panel Sl. No.- A-219 at Bastacolla Colliery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366083_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Complete Repairing of 400 Amps 3.3 KV Sait Make Sl. No- SA1295 VCB Switch with Busbar Secondary Controlling of 2MVA 11KV/3.3KV Power Transformer at Main Substation ROCP/SJ.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365982_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
Replacement and Installation of AB /GOC switches at various places in Golukdih Substation
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365984_1Published 25 Sept 2026
Thu, 8 Oct9:00 am · 10 days left
For Execution of bottom dressing, labelling and numbering of 6.6KV/550V, 220V Over head line Rails and Tubular pole Total 205 number Details 80 Nos. 20x4 Nos. Feeder for (Pump and shovel)(6.6KV-02 Nos. 3.3KV-02 Nos) from NOCP Sub-station to OCP Mi
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366117_1Published 24 Sept 2026
Tue, 6 Oct5:00 pm · 8 days left
For erection and dismantling of lighting line at Rehandling Patch, Ecological Park of TOCP and Domestic line at TMC
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366115_1Published 24 Sept 2026
Tue, 6 Oct5:00 pm · 8 days left
For the setting up independent Power Source for reliable operation of the Controlling Circuit of Different Switch installed at 6.6KV Jogta Substation Kankanee Colliery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366102_1Published 24 Sept 2026
Tue, 6 Oct5:00 pm · 8 days left
Maintenance of 11KV double feeder overhead line which is approx. 9KM long under Kusunda Area
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366101_1Published 24 Sept 2026
Sat, 10 Oct11:00 am · 12 days left
Repairing and maintenance of 440v overhead line from lal banglow substation to rawani basti and 440v head shrinkable joint kit pole mounting at KDSK siding under NGKC, Kusunda Area
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366086_1Published 24 Sept 2026
Wed, 7 Oct11:00 am · 9 days left
Diversion cum reorganization of 550V Overhead line from 2 seam substation to Pump station for clearance of mineable land at East Basuriya Colliery, Kusunda Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366095_1Published 24 Sept 2026
Wed, 7 Oct11:00 am · 9 days left
Complete overhauling of engine of 7 KVA Kirloskar make Generator at agent office under ADIC, Kusunda Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366050_1Published 24 Sept 2026
Mon, 5 Oct11:00 am · 7 days left
Compete repairing of 630A, 550V/440V OCB switch make - Easun, Sl. No. - KKC/ Easun/01(7510451) at khas kusunda substation of GKKC colliery under kusunda Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_366057_1Published 24 Sept 2026
Wed, 7 Oct11:00 am · 9 days left
Complete Repairing of 400 Amp 11KV/OCB with Busbar Biecco Lowrie make Sl. No PB4-13086 of main Switch of Victory Sub Station at Bastacolla Colliery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365864_1Published 21 Sept 2026
Mon, 5 Oct9:00 am · 7 days left
Supply and fitting of 50W Street LED lights at D type street, C type (new and old) subhash Bhawan and Ravindra sadan in Phase 1 under Harina Township of Block II Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365818_1Published 21 Sept 2026
Mon, 5 Oct5:00 pm · 7 days left
Execution of 5.0 Ha Plantation (Densification, Rejuvenation of old site) at Benidih OB Dump, ABOCP Mine and Upkeeping of Garden including garden lighting and other allied electrical works at NNTS, Harina Colony under Block-II Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365817_1Published 21 Sept 2026
Mon, 5 Oct5:00 pm · 7 days left
Repairing of house wiring of M2-115, M1-B15, M6-36, M4-88 Under Matigarh Township of Block-II Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365822_1Published 21 Sept 2026
Mon, 5 Oct5:00 pm · 7 days left
Supply and Fitting of ABPS make APP type HT Capacitor Unit of 297.52KVAr, 4.16kv with accessories for Moonidih U/G Sub-Station
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365672_1Published 19 Sept 2026
Sat, 3 Oct6:00 pm · 5 days left
Dismantling and relocation of two HT pump motor sets, along with all associated electrical accessories, to a secure location, followed by their reinstallation at Jarlahi sump, AMP Colliery Barora Area.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365649_1Published 19 Sept 2026
Tue, 29 Sept6:00 pm · Tomorrow
New Establishment 500 KVA Transformer at Patherdih Coal Washery for Power Supply to Bhatdih Basti of Patherdih Coal Washery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365751_1Published 19 Sept 2026
Mon, 28 Sept6:00 pm · Today
Maintenance of 11KV D.G Feeder No.1 AND 2 from Jealgora Substation to Patherdih Coal Washery.
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365750_1Published 19 Sept 2026
Mon, 28 Sept6:00 pm · Today
For Electrical re-wiring of A type Quarter No.NTT/530 P.No.Anita Dakua (General Mazdoor(b)Qtr No.NTS/C-30 P.No.61423821 Raghvendra Narayan Pandey, Clerk Grade-III (C ) Qtr.No.B-22 P.No.62954147 Rajesh Chouhan(Dozer Operator)at NPTS.(ii)and Anand Patra
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365717_1Published 18 Sept 2026
Tue, 29 Sept5:00 pm · Tomorrow
Maintenance of 550V O/H line at khas Kusunda Substation to filter plant khas kusunda GKKC under Kusunda Area
Bharat Coking Coal Limited · Central Govt · CPPP
2026_BCCL_365706_1Published 18 Sept 2026
Wed, 30 Sept11:00 am · 2 days left