Development of Chitrakoot Link Expressway under EPC Mode
by U.P. Expressways Industrial Development Authority
Published
Fri, 7 Aug
6:55 pm
Bid submission closes
Tue, 29 Sept
5:00 pm· Tomorrow
Bid opening
Wed, 30 Sept
12:30 pm
Tender details
- Organisation
- U.P. Expressways Industrial Development Authority
- Location
- Uttar Pradesh
- Tender ID
- 2026_UPEID_1175521_1
- Reference no.
- UPEIDA/2023/2665/Vol-VII_CLE
- Category
- Other
- Source portal
- Uttar Pradesh eProcurement
How to bid
- 1Open Uttar Pradesh eProcurement and search for Tender ID 2026_UPEID_1175521_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from U.P. Expressways Industrial Development Authority
All their tenders →- Development of 04 Way Side Amenities along Purvanchal Expressway PE_1, PE_2, PE_3 and PE_4
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Mon, 28 Sept4:00 pm · Today
- Development of 04 Way Side Amenities along Purvanchal Expressway PE_5, PE_6, PE_7 and PE_8
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Mon, 28 Sept4:00 pm · Today
- Authority Engineer for Jhansi Link Expressway
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Tue, 29 Sept4:00 pm · Tomorrow
- Authority Engineer for ALE PE Link
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Tue, 29 Sept4:00 pm · Tomorrow
- Authority Engineer for FLE
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Tue, 29 Sept4:00 pm · Tomorrow
Similar live tenders
Other in Uttar Pradesh →- Development of Interchange at Starting Point of Ahmedabad Dholera Expressway meeting with Sardar Patel Ring Road SPRR in Ahmedabad Gujarat on EPC Mode
National Highways Authority of India · Central Govt
Thu, 22 Oct11:00 am · 24 days left
- Development or construction of entry exit arrangement AT 4 Lane Greenfield Expressway SPUR from Delhi Vadodara Greenfield Expressway near Bandikui to Jaipur section of NE 4C in the state of Rajasthan on EPC Mode.
National Highways Authority of India · Central Govt
Wed, 30 Sept11:00 am · 2 days left
- Development or construction of entry exit arrangement AT 4 Lane Greenfield Expressway SPUR from Delhi Vadodara Greenfield Expressway near Bandikui to Jaipur section of NE 4C in the state of Rajasthan on EPC Mode.
National Highways Authority of India · Central Govt
Wed, 30 Sept11:00 am · 2 days left
- Development of Interchange at Starting Point of Ahmedabad Dholera Expressway meeting with Sardar Patel Ring Road SPRR in Ahmedabad Gujarat on EPC Mode
National Highways Authority of India · Central Govt
Thu, 22 Oct11:00 am · 24 days left
- Balance work for Construction of 8-lane access-controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section) in Gujarat on EPC mode (Pkg-VIII)-02nd Call
National Highways Authority of India · Central Govt
Tue, 13 Oct11:00 am · 15 days left
- Balance work for Construction of 8-lane access-controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section) in Gujarat on EPC mode (Pkg-VIII)-02nd Call
National Highways Authority of India · Central Govt
Tue, 13 Oct11:00 am · 15 days left