Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Barabanki with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
by U.P. Expressways Industrial Development Authority
Published
Thu, 27 Aug
6:00 pm
Bid submission closes
Mon, 5 Oct
12:00 pm· 7 days left
Bid opening
Mon, 5 Oct
3:30 pm
Tender details
- Organisation
- U.P. Expressways Industrial Development Authority
- Location
- Uttar Pradesh
- Tender ID
- 2026_UPEID_1180218_1
- Reference no.
- 5883/4039/UPEIDA/2025-26
- Category
- Manpower & Services
- Source portal
- Uttar Pradesh eProcurement
How to bid
- 1Open Uttar Pradesh eProcurement and search for Tender ID 2026_UPEID_1180218_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from U.P. Expressways Industrial Development Authority
All their tenders →- Development of 04 Way Side Amenities along Purvanchal Expressway PE_1, PE_2, PE_3 and PE_4
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Mon, 28 Sept4:00 pm · Today
- Development of 04 Way Side Amenities along Purvanchal Expressway PE_5, PE_6, PE_7 and PE_8
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Mon, 28 Sept4:00 pm · Today
- Authority Engineer for Jhansi Link Expressway
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Tue, 29 Sept4:00 pm · Tomorrow
- Authority Engineer for ALE PE Link
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Tue, 29 Sept4:00 pm · Tomorrow
- Authority Engineer for FLE
U.P. Expressways Industrial Development Authority · Uttar Pradesh
Tue, 29 Sept4:00 pm · Tomorrow
Similar live tenders
Manpower & Services in Uttar Pradesh →- Lease of 12 Nos of plots within the Integrated Logistics Park in Pushpak Node, Navi Mumbai under the Pass-Through Policy
City and Industrial Development Corporation of Maharashtra Ltd · Maharashtra
Thu, 15 Oct5:00 pm · 17 days left
- Selection of Consultant for preparation of DPR for the proposed DGP Integrated Industrial and Logistics Hub and allied works at DVC More (Mouza Gopinathpur), Durgapur, Paschim Bardhaman in line with ADB project preparation guideline/standard pract
Asansol Durgapur Development Authority · West Bengal
Tue, 29 Sept3:00 pm · Tomorrow
- Custom Bid for Services - Hiring of Integrated Logistics Services for a period of 05 (five) years for ONGC, Hazira Plant
Ministry of Petroleum and Natural Gas · Central Govt
Mon, 5 Oct4:00 pm · 7 days left
- Infrastructure Development work of Telecom Manufacturing Zone at Gwalior (M.P.) Package 1 on EPC Basis
MP Industrial Development Corporation Limited · Madhya Pradesh
Mon, 5 Oct3:00 pm · 7 days left
- New Katni Junction-Infrastructure up gradation of training institutes (MDDTI-NKJ) for integrated skill development(Phase-II)
Ministry of Railways · Central Govt
Tue, 6 Oct3:00 pm · 8 days left
- DIGHI PORT INDUSTRIAL AREA.... Dighi Port Industrial Area DPIA....Development of Infrastructure facilities for Mega Leather Footwear and Accessories Cluster in Ratwad, Dist. Raigad.... Construction of Gabbian wall in Valley portion. EC Rs.40,02,129.0
Maharashtra Industrial Development Corporation · Maharashtra
Thu, 1 Oct5:00 pm · 3 days left