Construction of Raipur Devsingh Road to Madaripur link road
by Chief Engineer PWD Central Zone,Lucknow
Published
Fri, 18 Sept
12:00 pm
Bid submission closes
Tue, 29 Sept
12:00 pm· Tomorrow
Bid opening
Tue, 29 Sept
12:30 pm
Fees, EMD and value
- Tender value
- Not stated
- See tender documents
- EMD
- ₹6,72,000
- 6.72 lakh · Exemption allowed
- Tender fee
- ₹2,715
- Work location
- Sitapur
- PIN 261001
- Period of work
- 150 days
- Bid validity
- 90 days
Tender details
- Organisation
- Chief Engineer PWD Central Zone,Lucknow › S.E. UPPWD Sitapur
- Location
- Uttar Pradesh
- Tender ID
- 2026_CEUCZ_1186508_9
- Reference no.
- 4283/352C/E.TEND/STP-LMP/26-27 Dt.09-09-2026
- Category
- Civil Works
- Tender type
- Open Tender
- Tender category
- Works · Civil Works - Roads
- Form of contract
- Fixed-rate
- Fee and EMD payment
- Online
- Source portal
- Uttar Pradesh eProcurement
Tender documents and BOQ
Notice inviting tender (NIT)
- 1.0 MB
NIT
Tendernotice_1.pdf
- 1.4 MB
T2
Tendernotice_2.pdf
Work item documents
- 565 KB
BOQBOQ
BOQ_2233409.xls
Uttar Pradesh eProcurement requires a security check (CAPTCHA) before each download, so the files themselves open there. Search for Tender ID 2026_CEUCZ_1186508_9.
Download on portalImportant dates
Published
18 Sept 2026, 12:00 pm
Documents available from
18 Sept 2026, 12:00 pm
Bid submission opens
18 Sept 2026, 12:00 pm
Pre-bid meeting
21 Sept 2026, 12:00 pm
Documents available untilNext
29 Sept 2026, 12:00 pm
Bid submission closes
29 Sept 2026, 12:00 pm
Bid opening
29 Sept 2026, 12:30 pm
Tender inviting authority
S.E.Sitapur/Kheri Circle PWD Sitapur
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
Pre-bid meeting
21 Sept 2026, 12:00 pm
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur, Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
How to bid
- 1Check the fees, EMD, dates and document list on this page to decide whether to bid.
- 2Download the tender documents and BOQ from Uttar Pradesh eProcurement (search for Tender ID 2026_CEUCZ_1186508_9), along with any corrigenda.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
Everything published on the portalCovers, payment instruments, fee and EMD details, work item details and more
Basic Details
- Organisation Chain
- Chief Engineer PWD Central Zone,Lucknow||S.E. UPPWD Sitapur
- Tender Reference Number
- 4283/352C/E.TEND/STP-LMP/26-27 Dt.09-09-2026
- Tender ID
- 2026_CEUCZ_1186508_9
- Withdrawal Allowed
- Yes
- Tender Type
- Open Tender
- Form Of Contract
- Fixed-rate
- Tender Category
- Works
- No. of Covers
- 2
- General Technical Evaluation Allowed
- No
- ItemWise Technical Evaluation Allowed
- No
- Payment Mode
- Online
- Is Multi Currency Allowed For BOQ
- No
- Is Multi Currency Allowed For Fee
- No
- Allow Two Stage Bidding
- No
Payment Instruments
Online Bankers
| S.No | Bank Name |
|---|---|
| 1 | SBI Bank |
Covers InformationNo. Of Covers - 2
| Cover No | Cover Type | Description | Document Type |
|---|---|---|---|
| 1 | Fee/PreQual/Technical | TECHNICAL DOCUMENT | |
| 2 | Finance | FINANCIAL DOCUMENT | .xls |
Tender Fee DetailsTotal Fee in ₹ * - 2,715
- Tender Fee in ₹
- 2,715
- Tender Fee Exemption Allowed
- No
EMD Fee Details
- EMD Amount in ₹
- 6,72,000
- EMD Exemption Allowed
- Yes
- EMD Fee Type
- fixed
Work Item Details
- Title
- Construction of Raipur Devsingh Road to Madaripur link road
- Work Description
- Construction of Raipur Devsingh Road to Madaripur link road
- NDA/Pre Qualification
- Please refer Tender documents.
- Product Category
- Civil Works - Roads
- Contract Type
- Tender
- Bid Validity(Days)
- 90
- Period Of Work(Days)
- 150
- Location
- Sitapur
- Pincode
- 261001
- Pre Bid Meeting Place
- Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
- Pre Bid Meeting Address
- Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
- Pre Bid Meeting Date
- 21-Sep-2026 12:00 PM
- Bid Opening Place
- Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
- Should Allow NDA Tender
- No
- Allow Preferential Bidder
- No
- Tenderer Class
- B
Critical Dates
- Published Date
- 18-Sep-2026 12:00 PM
- Bid Opening Date
- 29-Sep-2026 12:30 PM
- Document Download / Sale Start Date
- 18-Sep-2026 12:00 PM
- Document Download / Sale End Date
- 29-Sep-2026 12:00 PM
- Bid Submission Start Date
- 18-Sep-2026 12:00 PM
- Bid Submission End Date
- 29-Sep-2026 12:00 PM
Collected from Uttar Pradesh eProcurement on 28 Sept 2026, 2:22 am IST.
More from Chief Engineer PWD Central Zone,Lucknow
All their tenders →- Construction work of Missing Link Road village Thamarwa to village Daulatpur Padhai
Chief Engineer PWD Central Zone,Lucknow · Uttar Pradesh
Mon, 28 Sept12:00 pm · Today
- Construction work of Missing Link Road BP Road to Sikrohari Barbatapur to Tandiyawan
Chief Engineer PWD Central Zone,Lucknow · Uttar Pradesh
Mon, 28 Sept12:00 pm · Today
- Construction work of Sumerkheda to Rasulpur via Aimakheda
Chief Engineer PWD Central Zone,Lucknow · Uttar Pradesh
Mon, 28 Sept12:00 pm · Today
- Construction work of village Kherwa to Kakrahiya Road
Chief Engineer PWD Central Zone,Lucknow · Uttar Pradesh
Mon, 28 Sept12:00 pm · Today
- Construction work of Missing Link road of Ramkishore Katiyar Factory to Lokhanpur near Gadaipur at Pihani Road
Chief Engineer PWD Central Zone,Lucknow · Uttar Pradesh
Mon, 28 Sept12:00 pm · Today
Similar live tenders
Civil Works in Uttar Pradesh →- New construction of the Raipur (Revenue Village Dulhi) link road. (Dhaurahara)
Chief Engineer PWD Central Zone,Lucknow · Uttar Pradesh
Tue, 29 Sept12:00 pm · Tomorrow
- Construction of Inter Locking Tile Road at Saraswati Vihar Block 1 Lane NO1 Block Raipur Dehradun
Vice Chairman Mussoorie Dehradun Development Authority Dehradun · Uttarakhand
Fri, 2 Oct2:00 pm · 4 days left
- Construction/Repair of DB Flooring APF and Repair fo Road at Sub Yard Raipur MC Jalandhar Cantt Distt Jalandhar
Department of Agriculture · Punjab
Tue, 29 Sept11:00 am · Tomorrow
- Construction and Maintanance of Raipur Paliwar road to Raghawpur anusuchit basti (including 05 years maintenance)
Chief Engineer PWD Varanasi Zone · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Restoration of Road Cut Providing and Laying of 12 Inch I/D and 18 Inch I/D RCC NP-2, Storm Water Drain Pipeline on Both Side of the Road from Hallomajra Light Point to Raipur Khurd Ligght Point Including Construction of Manhole, Road Gullies
Chandigarh Administration · Chandigarh
Wed, 30 Sept2:00 pm · 2 days left
- Construction of Interlocking Road and RCC Drain from Kamlesh Viswakarma House to Manoj House via Santosh House in Ward 11 Shaheed Udham Singh Nagar Raipur in Nagar Panchayat Khaga Fatehpur
Directorate of Local Bodies UP · Uttar Pradesh
Mon, 28 Sept10:00 am · Today