Construction of Kamlesh Sharma house in village karmaha Situted At Phutahwa Sonbarsa Road to Railway Bridge Link Road in Vikas Khand Sardarnagar - Length 1-80 km including 5-year maintenance- Lot No 11 of 19
by Chief Engineer Gorakhpur Zone PWD Gorakhpur UP
Published
Sat, 12 Sept
9:00 am
Bid submission closes
Wed, 30 Sept
12:00 pm· Tomorrow
Bid opening
Wed, 30 Sept
12:30 pm
Fees, EMD and value
- Tender value
- ₹1,72,50,000
- 1.73 crore
- EMD
- ₹10,63,000
- 10.63 lakh
- Tender fee
- ₹2,714
- Work location
- Gorakhpur
- PIN 273001
- Period of work
- 365 days
- Bid validity
- 90 days
Tender details
- Organisation
- Chief Engineer Gorakhpur Zone PWD Gorakhpur UP › GORAKHPUAR CIRCLE PWD GORAKHPUR
- Location
- Uttar Pradesh
- Tender ID
- 2026_CEGKP_1184724_11
- Reference no.
- 6801/135C-Gkp Circle/2026 Dated 27-08-2026
- Category
- Civil Works
- Tender type
- Open Tender
- Tender category
- Works · Civil Works
- Form of contract
- Percentage
- Fee and EMD payment
- Online
- Source portal
- Uttar Pradesh eProcurement
Tender documents and BOQ
Notice inviting tender (NIT)
- 4.5 MB
Tender Notice
Tendernotice_1.pdf
- 1.4 MB
Tender Corrigendume Date and Completion of works
Tendernotice_2.pdf
Work item documents
- 681 KB
t2
t26801.pdf
- 371 KB
boqBOQ
BOQ_2228972.xls
Uttar Pradesh eProcurement requires a security check (CAPTCHA) before each download, so the files themselves open there. Search for Tender ID 2026_CEGKP_1184724_11.
Download on portalImportant dates
Published
12 Sept 2026, 9:00 am
Documents available from
12 Sept 2026, 9:00 am
Bid submission opens
12 Sept 2026, 9:00 am
Documents available untilNext
30 Sept 2026, 12:00 pm
Bid submission closes
30 Sept 2026, 12:00 pm
Bid opening
30 Sept 2026, 12:30 pm
Tender inviting authority
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
How to bid
- 1Check the fees, EMD, dates and document list on this page to decide whether to bid.
- 2Download the tender documents and BOQ from Uttar Pradesh eProcurement (search for Tender ID 2026_CEGKP_1184724_11), along with any corrigenda.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
Everything published on the portalCovers, payment instruments, fee and EMD details, work item details and more
Basic Details
- Organisation Chain
- Chief Engineer Gorakhpur Zone PWD Gorakhpur UP||GORAKHPUAR CIRCLE PWD GORAKHPUR
- Tender Reference Number
- 6801/135C-Gkp Circle/2026 Dated 27-08-2026
- Tender ID
- 2026_CEGKP_1184724_11
- Withdrawal Allowed
- Yes
- Tender Type
- Open Tender
- Form Of Contract
- Percentage
- Tender Category
- Works
- No. of Covers
- 2
- General Technical Evaluation Allowed
- No
- ItemWise Technical Evaluation Allowed
- No
- Payment Mode
- Online
- Is Multi Currency Allowed For BOQ
- No
- Is Multi Currency Allowed For Fee
- No
- Allow Two Stage Bidding
- No
Payment Instruments
Online Bankers
| S.No | Bank Name |
|---|---|
| 1 | SBI Bank |
Covers InformationNo. Of Covers - 2
| Cover No | Cover Type | Description | Document Type |
|---|---|---|---|
| 1 | Fee/PreQual/Technical | E1 | |
| 2 | Finance | BOQ | .xls |
Tender Fee DetailsTotal Fee in ₹ * - 2,714
- Tender Fee in ₹
- 2,714
- Tender Fee Exemption Allowed
- No
EMD Fee Details
- EMD Amount in ₹
- 10,63,000
- EMD Exemption Allowed
- No
- EMD Fee Type
- fixed
Work Item Details
- Title
- Construction of Kamlesh Sharma house in village karmaha Situted At Phutahwa Sonbarsa Road to Railway Bridge Link Road in Vikas Khand Sardarnagar - Length 1-80 km including 5-year maintenance- Lot No 11 of 19
- Work Description
- Construction of Kamlesh Sharma house in village karmaha Situted At Phutahwa Sonbarsa Road to Railway Bridge Link Road in Vikas Khand Sardarnagar - Length 1-80 km including 5-year maintenance- Lot No 11 of 19
- NDA/Pre Qualification
- Please refer Tender documents.
- Tender Value in ₹
- 1,72,50,000
- Product Category
- Civil Works
- Contract Type
- Tender
- Bid Validity(Days)
- 90
- Period Of Work(Days)
- 365
- Location
- Gorakhpur
- Pincode
- 273001
- Bid Opening Place
- Gorakhpur
- Should Allow NDA Tender
- No
- Allow Preferential Bidder
- No
- Tenderer Class
- B
Critical Dates
- Published Date
- 12-Sep-2026 09:00 AM
- Bid Opening Date
- 30-Sep-2026 12:30 PM
- Document Download / Sale Start Date
- 12-Sep-2026 09:00 AM
- Document Download / Sale End Date
- 30-Sep-2026 12:00 PM
- Bid Submission Start Date
- 12-Sep-2026 09:00 AM
- Bid Submission End Date
- 30-Sep-2026 12:00 PM
Collected from Uttar Pradesh eProcurement on 28 Sept 2026, 1:35 am IST.
More from Chief Engineer Gorakhpur Zone PWD Gorakhpur UP
All their tenders- Construction of office Building for Office of Executive Engineer Construction Division 2 PWD Gorakhpur Lot No 1 of 1
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
TodayTue, 29 Sept, 12:00 pm
TodayTue, 29 Sept, 12:00 pm
- Construction of Gram Sabha Bakainiya Haraiya Prathmik Vidyalay to Khutahwa tola road. (including 05 Years Maintenance charge) Lot No 6 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
TomorrowWed, 30 Sept, 12:00 pm
TomorrowWed, 30 Sept, 12:00 pm
- Construction of Kaulahi to Jamuna Prasad Smark Digree Collage to Chandithan road.(including 05 Years Maintenance charge) Lot No 1 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
TomorrowWed, 30 Sept, 12:00 pm
TomorrowWed, 30 Sept, 12:00 pm
- Construction of Ranipur to Manoharchak Prathmik Swashthya kendra road. (including 05 Years Maintenance charge) Lot No 8 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
TomorrowWed, 30 Sept, 12:00 pm
TomorrowWed, 30 Sept, 12:00 pm
- Construction of Purainiya Khas to Lohasi Chhotka Tola Link road. (including 05 Years Maintenance charge) Lot No 4 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
TomorrowWed, 30 Sept, 12:00 pm
TomorrowWed, 30 Sept, 12:00 pm
Similar live tenders
Civil Works in Uttar Pradesh- CC Road Construction Work from Kamlesh Chand Sharma House to Runda Pura Wala House in Vivek Vihar Colony Karauli
DLB · Rajasthan
7 days leftTue, 6 Oct, 6:00 pm
7 days leftTue, 6 Oct, 6:00 pm
- C/O Retaining wall near the house of Sh. Kamlesh Kumar in village Karsai P.O. Gwalpathar Block Nadaun Distt. Hamirpur.
PWD · Himachal Pradesh
2 days leftThu, 1 Oct, 10:30 am
2 days leftThu, 1 Oct, 10:30 am
- Construction of a CC road from the house of Deendayal Namdev to the house of Ashok Sharma in Madawara village, Madawara Development Block.
Director Cum Chief Engineer RED · Uttar Pradesh
10 days leftFri, 9 Oct, 12:30 pm
10 days leftFri, 9 Oct, 12:30 pm
- Construction of an interlocking road and drain in Ward-Kothidih, extending from Jagdev house to Naomilal house via Kamlesh house.
Directorate of Local Bodies UP · Uttar Pradesh
TodayTue, 29 Sept, 2:00 pm
TodayTue, 29 Sept, 2:00 pm
- Dhandardu Const. of Street from Main Phirni to Joginder Sharma House in Village Dhandardu, Block Barwala, District Panchkula (VANGY 2025-26)
Haryana Government · Haryana
6 days leftMon, 5 Oct, 10:00 am
6 days leftMon, 5 Oct, 10:00 am
- For construction of RCC drain with Slab in Mango ward no-14 Ulidih Sharma Line from house of Dhanjay Shriwastav to house of B.D Sharma and House of Lalan sharma to house of Vikas Sharma and Diff. cross Road.
UDD Secretary · Jharkhand
10 days leftFri, 9 Oct, 5:00 pm
10 days leftFri, 9 Oct, 5:00 pm