Construction work of Chhatihari Farendiya Link Road to Hoshila hote hue Gram Vidaura Amrendra Pratap Singh House Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 2 of 20
by Chief Engineer Gorakhpur Zone PWD Gorakhpur UP
Published
Sat, 12 Sept
12:00 pm
Bid submission closes
Wed, 30 Sept
12:00 pm· 2 days left
Bid opening
Wed, 30 Sept
12:30 pm
Fees, EMD and value
- Tender value
- ₹1,45,00,000
- 1.45 crore
- EMD
- ₹9,25,000
- 9.25 lakh
- Tender fee
- ₹2,714
- Work location
- Gorakhpur
- PIN 273001
- Period of work
- 365 days
- Bid validity
- 90 days
Tender details
- Organisation
- Chief Engineer Gorakhpur Zone PWD Gorakhpur UP › GORAKHPUAR CIRCLE PWD GORAKHPUR
- Location
- Uttar Pradesh
- Tender ID
- 2026_CEGKP_1184659_2
- Reference no.
- 6800/135C-Gkp Circle/2026 Dated 27-08-2026
- Category
- Civil Works
- Tender type
- Open Tender
- Tender category
- Works · Civil Works
- Form of contract
- Percentage
- Fee and EMD payment
- Online
- Source portal
- Uttar Pradesh eProcurement
Tender documents and BOQ
Notice inviting tender (NIT)
- 4.5 MB
Tender Notice
Tendernotice_1.pdf
- 1.6 MB
Tender Corrigendum Date and Date of Completion and RMC and Self Loading concrete Mixute Machine
Tendernotice_2.pdf
Work item documents
- 733 KB
t2
T26800.pdf
- 354 KB
boqBOQ
BOQ_2228758.xls
Uttar Pradesh eProcurement requires a security check (CAPTCHA) before each download, so the files themselves open there. Search for Tender ID 2026_CEGKP_1184659_2.
Download on portalImportant dates
Published
12 Sept 2026, 12:00 pm
Documents available from
12 Sept 2026, 12:00 pm
Bid submission opens
12 Sept 2026, 12:00 pm
Documents available untilNext
30 Sept 2026, 12:00 pm
Bid submission closes
30 Sept 2026, 12:00 pm
Bid opening
30 Sept 2026, 12:30 pm
Tender inviting authority
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
How to bid
- 1Check the fees, EMD, dates and document list on this page to decide whether to bid.
- 2Download the tender documents and BOQ from Uttar Pradesh eProcurement (search for Tender ID 2026_CEGKP_1184659_2), along with any corrigenda.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
Everything published on the portalCovers, payment instruments, fee and EMD details, work item details and more
Basic Details
- Organisation Chain
- Chief Engineer Gorakhpur Zone PWD Gorakhpur UP||GORAKHPUAR CIRCLE PWD GORAKHPUR
- Tender Reference Number
- 6800/135C-Gkp Circle/2026 Dated 27-08-2026
- Tender ID
- 2026_CEGKP_1184659_2
- Withdrawal Allowed
- Yes
- Tender Type
- Open Tender
- Form Of Contract
- Percentage
- Tender Category
- Works
- No. of Covers
- 2
- General Technical Evaluation Allowed
- No
- ItemWise Technical Evaluation Allowed
- No
- Payment Mode
- Online
- Is Multi Currency Allowed For BOQ
- No
- Is Multi Currency Allowed For Fee
- No
- Allow Two Stage Bidding
- No
Payment Instruments
Online Bankers
| S.No | Bank Name |
|---|---|
| 1 | SBI Bank |
Covers InformationNo. Of Covers - 2
| Cover No | Cover Type | Description | Document Type |
|---|---|---|---|
| 1 | Fee/PreQual/Technical | E1 | |
| 2 | Finance | BOQ | .xls |
Tender Fee DetailsTotal Fee in ₹ * - 2,714
- Tender Fee in ₹
- 2,714
- Tender Fee Exemption Allowed
- No
EMD Fee Details
- EMD Amount in ₹
- 9,25,000
- EMD Exemption Allowed
- No
- EMD Fee Type
- fixed
Work Item Details
- Title
- Construction work of Chhatihari Farendiya Link Road to Hoshila hote hue Gram Vidaura Amrendra Pratap Singh House Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 2 of 20
- Work Description
- Construction work of Chhatihari Farendiya Link Road to Hoshila hote hue Gram Vidaura Amrendra Pratap Singh House Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 2 of 20
- NDA/Pre Qualification
- Please refer Tender documents.
- Tender Value in ₹
- 1,45,00,000
- Product Category
- Civil Works
- Contract Type
- Tender
- Bid Validity(Days)
- 90
- Period Of Work(Days)
- 365
- Location
- Gorakhpur
- Pincode
- 273001
- Bid Opening Place
- Gorakhpur
- Should Allow NDA Tender
- No
- Allow Preferential Bidder
- No
- Tenderer Class
- B
Critical Dates
- Published Date
- 12-Sep-2026 12:00 PM
- Bid Opening Date
- 30-Sep-2026 12:30 PM
- Document Download / Sale Start Date
- 12-Sep-2026 12:00 PM
- Document Download / Sale End Date
- 30-Sep-2026 12:00 PM
- Bid Submission Start Date
- 12-Sep-2026 12:00 PM
- Bid Submission End Date
- 30-Sep-2026 12:00 PM
Collected from Uttar Pradesh eProcurement on 28 Sept 2026, 1:34 am IST.
More from Chief Engineer Gorakhpur Zone PWD Gorakhpur UP
All their tenders →- Construction of office Building for Office of Executive Engineer Construction Division 2 PWD Gorakhpur Lot No 1 of 1
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Tue, 29 Sept12:00 pm · Tomorrow
- Construction of Gram Sabha Bakainiya Haraiya Prathmik Vidyalay to Khutahwa tola road. (including 05 Years Maintenance charge) Lot No 6 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Kaulahi to Jamuna Prasad Smark Digree Collage to Chandithan road.(including 05 Years Maintenance charge) Lot No 1 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Ranipur to Manoharchak Prathmik Swashthya kendra road. (including 05 Years Maintenance charge) Lot No 8 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Purainiya Khas to Lohasi Chhotka Tola Link road. (including 05 Years Maintenance charge) Lot No 4 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
Similar live tenders
Civil Works in Uttar Pradesh →- Construction of Gorkhpuriyadeeh se Aligarhawa hote hue semenar link Road
Chief Engineer Basti Zone PWD Basti · Uttar Pradesh
Tue, 29 Sept12:00 pm · Tomorrow
- Construction work of Vikas Khand Gola me Pokhari Goan Dubey Tola CC Road to Umashankar Dubey House hote hue Kahar Tola hote hue Dalit Basti Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 20 of 20
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Kathar Butahani Imlihwa Gawon Hote hue Kalika Singh Purwa link Road
Chief Engineer Devipatan (Gonda) Zone PWD Gonda · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Alenpur Grint Prdhanmantri Marg se Baraipurwa Hote Hue Amwa Marg link Road
Chief Engineer Devipatan (Gonda) Zone PWD Gonda · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Mohana Lotam Marg Ke KM 2 se Rahudeela hote hue Raghunathpur Tak Link Road
Chief Engineer Basti Zone PWD Basti · Uttar Pradesh
Tue, 29 Sept12:00 pm · Tomorrow
- New Construction of Pure Taiya to Chak Bhadokhar Marg Hote Hue Gadiyani Link Road
Chief Engineer PWD Central Zone,Lucknow · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left