Construction of 2 cell box culvert of 5x5 meter at Bhattha Chauraha to Chhoti Retawaiya link road Km 1 in District Gorakhpur in FY 2026-27 LOT (6/6)
by Chief Engineer Gorakhpur Zone PWD Gorakhpur UP
Published
Wed, 23 Sept
6:00 pm
Bid submission closes
Wed, 30 Sept
12:00 pm· 2 days left
Bid opening
Wed, 30 Sept
12:30 pm
Fees, EMD and value
- Tender value
- ₹92,00,000
- 92 lakh
- EMD
- ₹5,85,000
- 5.85 lakh
- Tender fee
- ₹2,714
- Work location
- Gorakhpur
- PIN 273001
- Period of work
- 90 days
- Bid validity
- 90 days
Tender details
- Organisation
- Chief Engineer Gorakhpur Zone PWD Gorakhpur UP › GORAKHPUAR CIRCLE PWD GORAKHPUR
- Location
- Uttar Pradesh
- Tender ID
- 2026_CEGKP_1188517_6
- Reference no.
- 7075/135C-Gkp Circle/2026 dated 09-09-2026
- Category
- Civil Works
- Tender type
- Open Tender
- Tender category
- Works · Civil Works
- Form of contract
- Percentage
- Fee and EMD payment
- Online
- Source portal
- Uttar Pradesh eProcurement
Tender documents and BOQ
Notice inviting tender (NIT)
- 1.9 MB
Tender Notice
Tendernotice_1.pdf
- 610 KB
Corrigendum
Tendernotice_2.pdf
Work item documents
- 678 KB
t2
t27075.pdf
- 356 KB
boqBOQ
BOQ_2239046.xls
Uttar Pradesh eProcurement requires a security check (CAPTCHA) before each download, so the files themselves open there. Search for Tender ID 2026_CEGKP_1188517_6.
Download on portalImportant dates
Published
23 Sept 2026, 6:00 pm
Documents available from
23 Sept 2026, 6:00 pm
Bid submission opens
23 Sept 2026, 6:00 pm
Documents available untilNext
30 Sept 2026, 12:00 pm
Bid submission closes
30 Sept 2026, 12:00 pm
Bid opening
30 Sept 2026, 12:30 pm
Tender inviting authority
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
How to bid
- 1Check the fees, EMD, dates and document list on this page to decide whether to bid.
- 2Download the tender documents and BOQ from Uttar Pradesh eProcurement (search for Tender ID 2026_CEGKP_1188517_6), along with any corrigenda.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
Everything published on the portalCovers, payment instruments, fee and EMD details, work item details and more
Basic Details
- Organisation Chain
- Chief Engineer Gorakhpur Zone PWD Gorakhpur UP||GORAKHPUAR CIRCLE PWD GORAKHPUR
- Tender Reference Number
- 7075/135C-Gkp Circle/2026 dated 09-09-2026
- Tender ID
- 2026_CEGKP_1188517_6
- Withdrawal Allowed
- Yes
- Tender Type
- Open Tender
- Form Of Contract
- Percentage
- Tender Category
- Works
- No. of Covers
- 2
- General Technical Evaluation Allowed
- No
- ItemWise Technical Evaluation Allowed
- No
- Payment Mode
- Online
- Is Multi Currency Allowed For BOQ
- No
- Is Multi Currency Allowed For Fee
- No
- Allow Two Stage Bidding
- No
Payment Instruments
Online Bankers
| S.No | Bank Name |
|---|---|
| 1 | SBI Bank |
Covers InformationNo. Of Covers - 2
| Cover No | Cover Type | Description | Document Type |
|---|---|---|---|
| 1 | Fee/PreQual/Technical | E1 | |
| 2 | Finance | BOQ | .xls |
Tender Fee DetailsTotal Fee in ₹ * - 2,714
- Tender Fee in ₹
- 2,714
- Tender Fee Exemption Allowed
- No
EMD Fee Details
- EMD Amount in ₹
- 5,85,000
- EMD Exemption Allowed
- No
- EMD Fee Type
- fixed
Work Item Details
- Title
- Construction of 2 cell box culvert of 5x5 meter at Bhattha Chauraha to Chhoti Retawaiya link road Km 1 in District Gorakhpur in FY 2026-27 LOT (6/6)
- Work Description
- Construction of 2 cell box culvert of 5x5 meter at Bhattha Chauraha to Chhoti Retawaiya link road Km 1 in District Gorakhpur in FY 2026-27 LOT (6/6)
- NDA/Pre Qualification
- Please refer Tender documents.
- Tender Value in ₹
- 92,00,000
- Product Category
- Civil Works
- Contract Type
- Tender
- Bid Validity(Days)
- 90
- Period Of Work(Days)
- 90
- Location
- Gorakhpur
- Pincode
- 273001
- Bid Opening Place
- Gorakhpur
- Should Allow NDA Tender
- No
- Allow Preferential Bidder
- No
- Tenderer Class
- B
Critical Dates
- Published Date
- 23-Sep-2026 06:00 PM
- Bid Opening Date
- 30-Sep-2026 12:30 PM
- Document Download / Sale Start Date
- 23-Sep-2026 06:00 PM
- Document Download / Sale End Date
- 30-Sep-2026 12:00 PM
- Bid Submission Start Date
- 23-Sep-2026 06:00 PM
- Bid Submission End Date
- 30-Sep-2026 12:00 PM
Collected from Uttar Pradesh eProcurement on 28 Sept 2026, 1:32 am IST.
More from Chief Engineer Gorakhpur Zone PWD Gorakhpur UP
All their tenders →- Construction of office Building for Office of Executive Engineer Construction Division 2 PWD Gorakhpur Lot No 1 of 1
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Tue, 29 Sept12:00 pm · Tomorrow
- Construction of Gram Sabha Bakainiya Haraiya Prathmik Vidyalay to Khutahwa tola road. (including 05 Years Maintenance charge) Lot No 6 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Kaulahi to Jamuna Prasad Smark Digree Collage to Chandithan road.(including 05 Years Maintenance charge) Lot No 1 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Ranipur to Manoharchak Prathmik Swashthya kendra road. (including 05 Years Maintenance charge) Lot No 8 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Purainiya Khas to Lohasi Chhotka Tola Link road. (including 05 Years Maintenance charge) Lot No 4 of 8
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
Similar live tenders
Civil Works in Uttar Pradesh →- Construction of a 3-meter span double-cell RCC box culvert on the Bachcha Baba Ashram to Dhamna Kachhar route
Cheif Engineer Kanpur Zone PWD Kanpur · Uttar Pradesh
Fri, 9 Oct12:00 pm · 11 days left
- Construction of 6 cell box culvert of 5x5 meter at Kaharpurwa/Aamghat tola in Kalyanpur in District Gorakhpur in FY 2026-27 LOT (1/6)
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of Box culvert in 6x6 meter 03 cell at Mahudabar Gopalpur Padariya Sewai Link road in Block Piprauli District Gorakhpur Lot No 1 of 1
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of 2 cell box culvert of 3x3 meter at Chhamusthan to Ghirau Tola Sheetalpur link road Km 2 in District Gorakhpur in FY 2026-27 LOT (5/6)
Chief Engineer Gorakhpur Zone PWD Gorakhpur UP · Uttar Pradesh
Wed, 30 Sept12:00 pm · 2 days left
- Construction of 2 Cell 6x3.00 Meter box culvert, protection works, approach road and additional approach road between Gandhar and Hismah villages in Block Dadraul in Distt. Shahjahanpur. (Fin Year 2026-27)
Cheif Engineer Bareilly Zone PWD Bareilly · Uttar Pradesh
Mon, 28 Sept12:00 pm · Today
- Construction of 3 Cell 6x3.00 Meter box culvert, protection works, approach road and additional approach road between Barua Banjar village and Barua Khurd village in Block Dadraul in Distt. Shahjahanpur. (Fin Year 2026-27)
Cheif Engineer Bareilly Zone PWD Bareilly · Uttar Pradesh
Mon, 28 Sept12:00 pm · Today