Supply of material, installation Testing and commissioning of Signalling outdoor work in connection with the Extension of High-level passenger platforms at Vaitarna, Saphale, Kelve Road, Boisar, Gholvad, Palghar & Dahanu Road under ADEN/DRD of Mumbai Divison, Western Railway.
Published
Wed, 30 Sept
3:59 pm
Bid submission closes
Mon, 26 Oct
3:00 pm· 24 days left
Bid opening
Mon, 26 Oct
3:00 pm
Tender details
- Organisation
- Ministry of Railways
- Location
- Central Government
- Tender ID
- 92171677
- Reference no.
- SG_216_2_171_WA_PH53
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1To find the tender, search CPPP — Central Public Procurement Portal for Tender ID 92171677.
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
New to bidding? Read How to apply for government tenders in India, step by step, How to register and bid on eprocure.gov.in and other NIC portals and Digital signature (DSC) for e-tendering: which one you need.
More from Ministry of Railways
All their tenders- Measuring and Monitoring Relay
Ministry of Railways · Central Govt
TodayFri, 2 Oct, 10:30 am
TodayFri, 2 Oct, 10:30 am
- Hammer Box Assembly, Glass Sheet with Hammer
Ministry of Railways · Central Govt
TodayFri, 2 Oct, 10:30 am
TodayFri, 2 Oct, 10:30 am
- Snubber Spring (BLC)
Ministry of Railways · Central Govt
TodayFri, 2 Oct, 10:30 am
TodayFri, 2 Oct, 10:30 am
- VCD Display Unit 1
Ministry of Railways · Central Govt
TodayFri, 2 Oct, 10:30 am
TodayFri, 2 Oct, 10:30 am
- VCD Display Unit 2
Ministry of Railways · Central Govt
TodayFri, 2 Oct, 10:30 am
TodayFri, 2 Oct, 10:30 am
Similar live tenders
Civil Works in Central Govt- Supply of part material, installation, testing, and commissioning of outdoor signalling work in connection with Rebuilding of Arch Bridge No. 182, 294, 303, 309, 314, 337 & 351 on Rajdhani Route Virar - Joravasan Section of Mumbai Division, Western Railway.
Ministry of Railways · Central Govt
10 days leftMon, 12 Oct, 3:00 pm
10 days leftMon, 12 Oct, 3:00 pm
- 112 days left
Fri, 22 Jan, 11:00 am
112 days leftFri, 22 Jan, 11:00 am
- 19 days left
Wed, 21 Oct, 3:00 pm
19 days leftWed, 21 Oct, 3:00 pm
- Design, Supply, Installation, Testing and Commissioning of ElectronicInterlocking (E.I) system along with other Indoor and outdoor Signalling works at Sanjan, Dungri, Amalsad, Bhilad, and Bililmora stations of Mumbai Division, Western Railway.
Ministry of Railways · Central Govt
10 days leftMon, 12 Oct, 3:00 pm
10 days leftMon, 12 Oct, 3:00 pm
- Supply, installation, testing and other signalling works in connection with Engineering works (1) KIM - Provision of Sub-Way for inter platform transfer for passengers. (2) Ankleshwar and Miyagam :- Extension of High level PF (3) Surat - Vadodara Section:- Rebuilding of arch Bridge No. 500 A & 560
Ministry of Railways · Central Govt
6 days leftThu, 8 Oct, 3:00 pm
6 days leftThu, 8 Oct, 3:00 pm
- 13 days left
Thu, 15 Oct, 3:00 pm
13 days leftThu, 15 Oct, 3:00 pm