construction of permanent infrastructure at BOP Simbalghat of 57 Bn SSB Sitarganj under FTR Hqr Ranikhet. For SH Architect and Engineering consultancy services
Published
Wed, 23 Sept
3:00 pm
Bid submission closes
Wed, 30 Sept
3:00 pm· 2 days left
Bid opening
Thu, 1 Oct
4:00 pm
Fees, EMD and value
- Tender value
- Not stated
- See tender documents
- EMD
- Nil
- Tender fee
- No fee
- Work location
- BOP Simbalghat of 57th Bn SS
- PIN 262405
- Period of work
- 60 days
- Bid validity
- 75 days
Tender details
- Organisation
- DG Sashastra Seema Bal,MHA › IG FTR HQRS Ranikhet,SSB › DIG SHQ Pilibhit,Ranikhet,SSB
- Location
- Central Government
- Tender ID
- 2026_SSB_927106_1
- Reference no.
- EE/SHQ/SSB/2025-26/41
- Category
- Consultancy & Survey
- Tender type
- Open Tender
- Tender category
- Works · Civil Works
- Form of contract
- Percentage
- Fee and EMD payment
- Not Applicable
- Source portal
- Central Govt eProcurement (NIC)
Tender documents and BOQ
Notice inviting tender (NIT)
- 574 KB
NIT
Tendernotice_1.pdf
Work item documents
- 261 KB
boqBOQ
BOQ_974270.xls
- 555 KB
NIT
niqsimbalghat.pdf
Central Govt eProcurement (NIC) requires a security check (CAPTCHA) before each download, so the files themselves open there. Search for Tender ID 2026_SSB_927106_1.
Download on portalImportant dates
Published
23 Sept 2026, 3:00 pm
Documents available from
23 Sept 2026, 3:00 pm
Clarifications open
23 Sept 2026, 3:00 pm
Bid submission opens
23 Sept 2026, 3:00 pm
Clarifications closeNext
30 Sept 2026, 3:00 pm
Documents available until
30 Sept 2026, 3:00 pm
Bid submission closes
30 Sept 2026, 3:00 pm
Bid opening
1 Oct 2026, 4:00 pm
Tender inviting authority
Executive Engineer SHQ SSB Pilibhit
SHQ SSB Pilibhit
How to bid
- 1Check the fees, EMD, dates and document list on this page to decide whether to bid.
- 2Download the tender documents and BOQ from Central Govt eProcurement (NIC) (search for Tender ID 2026_SSB_927106_1), along with any corrigenda.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
Everything published on the portalCovers, payment instruments, fee and EMD details, work item details and more
Basic Details
- Organisation Chain
- DG Sashastra Seema Bal,MHA||IG FTR HQRS Ranikhet,SSB||DIG SHQ Pilibhit,Ranikhet,SSB
- Tender Reference Number
- EE/SHQ/SSB/2025-26/41
- Tender ID
- 2026_SSB_927106_1
- Withdrawal Allowed
- Yes
- Tender Type
- Open Tender
- Form Of Contract
- Percentage
- Tender Category
- Works
- No. of Covers
- 2
- General Technical Evaluation Allowed
- No
- ItemWise Technical Evaluation Allowed
- No
- Payment Mode
- Not Applicable
- Is Multi Currency Allowed For BOQ
- No
- Is Multi Currency Allowed For Fee
- No
- Allow Two Stage Bidding
- No
Covers InformationNo. Of Covers - 2
| Cover No | Cover Type | Description | Document Type |
|---|---|---|---|
| 1 | Fee/PreQual/Technical | BOQ | .xls |
| NIQ | |||
| 2 | Finance | finance | .xls |
Tender Fee DetailsTotal Fee in ₹ * - 0.00
- Tender Fee in ₹
- 0.00
- Tender Fee Exemption Allowed
- No
EMD Fee Details
- EMD Amount in ₹
- 0.00
- EMD Exemption Allowed
- No
- EMD Fee Type
- fixed
Work Item Details
- Title
- construction of permanent infrastructure at BOP Simbalghat of 57 Bn SSB Sitarganj under FTR Hqr Ranikhet. For SH Architect and Engineering consultancy services
- Work Description
- construction of permanent infrastructure at BOP Simbalghat of 57 Bn SSB Sitarganj under FTR Hqr Ranikhet. For SH Architect and Engineering consultancy services
- NDA/Pre Qualification
- Please refer Tender documents.
- Tender Value in ₹
- 0.00
- Product Category
- Civil Works
- Contract Type
- Tender
- Bid Validity(Days)
- 75
- Period Of Work(Days)
- 60
- Location
- BOP Simbalghat of 57th Bn SS
- Pincode
- 262405
- Bid Opening Place
- DIG, SHQ, SSB, Pilibhit
- Should Allow NDA Tender
- No
- Allow Preferential Bidder
- No
- Tenderer Class
- As per Tender Document
Critical Dates
- Published Date
- 23-Sep-2026 03:00 PM
- Bid Opening Date
- 01-Oct-2026 04:00 PM
- Document Download / Sale Start Date
- 23-Sep-2026 03:00 PM
- Document Download / Sale End Date
- 30-Sep-2026 03:00 PM
- Clarification Start Date
- 23-Sep-2026 03:00 PM
- Clarification End Date
- 30-Sep-2026 03:00 PM
- Bid Submission Start Date
- 23-Sep-2026 03:00 PM
- Bid Submission End Date
- 30-Sep-2026 03:00 PM
Collected from Central Govt eProcurement (NIC) on 28 Sept 2026, 12:54 am IST.
More from DG Sashastra Seema Bal,MHA
All their tenders →- Supply of explosive items
DG Sashastra Seema Bal,MHA · Central Govt
Tue, 29 Sept3:30 pm · Tomorrow
- Supply of explosive items
DG Sashastra Seema Bal,MHA · Central Govt
Tue, 29 Sept3:30 pm · Tomorrow
- Preparation of Structural Drawings, Working Drawings, Detailed Estimates etc for 40 women barrack at 22nd Bn Hqr Maharajganj
DG Sashastra Seema Bal,MHA · Central Govt
Wed, 30 Sept10:00 am · 2 days left
- Preparation of Structural Drawings, Working Drawings, Detailed Estimates etc for 40 women brrack at Bn Hqr SSB Siddharthnagar
DG Sashastra Seema Bal,MHA · Central Govt
Wed, 30 Sept10:00 am · 2 days left
- Preparation of Structural Drawings, Working Drawings, Detailed Estimates etc for 40 women barrack at 22nd Bn Hqr Maharajganj
DG Sashastra Seema Bal,MHA · Central Govt
Wed, 30 Sept10:00 am · 2 days left
Similar live tenders
Consultancy & Survey in Central Govt →- construction of permanent infrastructure at BOP Simbalghat of 57 Bn SSB Sitarganj under FTR Hqr Ranikhet. For SH Architect and Engineering consultancy services
DG Sashastra Seema Bal,MHA · Central Govt
Wed, 30 Sept3:00 pm · 2 days left
- c/o Permanent building at BOP Harney of 48 Bn Jaynagar under SHQ Muzaffarpur
DG Sashastra Seema Bal,MHA · Central Govt
Wed, 30 Sept4:00 pm · 2 days left
- c/o Permanent building at BOP Harney of 48 Bn Jaynagar under SHQ Muzaffarpur
DG Sashastra Seema Bal,MHA · Central Govt
Wed, 30 Sept4:00 pm · 2 days left
- Construction of surveillance cum OP Shelter G2 in AOR of BOP Nadeshwari of 194 Bn BSF under SHQ BSF Gandhinagar
DG,BSF,MHA · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
- Construction of 08 bedded Mahila barrack at BOP Rajuwala of 92 Bn Now 20 Bn BSF under SHQ BSF JSMR North SH Electrical work
DG,BSF,MHA · Central Govt
Tue, 6 Oct11:00 am · 8 days left
- Construction of 01 Nos Surveillance com OP shelter G2 at BOP Mauzam Base of 66 BN now 19 Bn BSF under SHQ BSF Abohar SH Electrical work
DG,BSF,MHA · Central Govt
Mon, 5 Oct11:00 am · 7 days left