Comprehensive Annual Maintenance Contract of 01 No. Integrated Power Supply System(IPS) HBL- MAKE installed at Chaibasa-Pandrasali IB in Chakradharpur Division.
Published
Wed, 30 Sept
6:10 pm
Bid submission closes
Mon, 26 Oct
3:00 pm· 23 days left
Bid opening
Mon, 26 Oct
3:00 pm
Tender details
- Organisation
- Ministry of Railways
- Location
- Central Government
- Tender ID
- 92380709
- Reference no.
- ST-CKP-T-26-27-106
- Category
- Electrical & Power
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1To find the tender, search CPPP — Central Public Procurement Portal for Tender ID 92380709.
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
New to bidding? Read How to apply for government tenders in India, step by step, How to register and bid on eprocure.gov.in and other NIC portals and How to fill the BOQ in an e-tender: item rate, percentage rate and common errors.
More from Ministry of Railways
All their tenders- 1) Irrigation & Aspirating Straight Tip and 2) Irrigation & Aspirating 45 Degree Angled Tip
Ministry of Railways · Central Govt
2 days leftMon, 5 Oct, 10:30 am
2 days leftMon, 5 Oct, 10:30 am
- 2 days left
Mon, 5 Oct, 10:30 am
2 days leftMon, 5 Oct, 10:30 am
- Cal a 450 ML & Cal B 200ML - Electrolyte Reagent (Sodium, Potassium & Chloride) -Nulyte Smart Electrolyte Analyzer]
Ministry of Railways · Central Govt
2 days leftMon, 5 Oct, 10:30 am
2 days leftMon, 5 Oct, 10:30 am
- Paint, aluminium brushing for general purpose.
Ministry of Railways · Central Govt
2 days leftMon, 5 Oct, 10:30 am
2 days leftMon, 5 Oct, 10:30 am
- Non-Flammable Solvent Based Adhesive
Ministry of Railways · Central Govt
2 days leftMon, 5 Oct, 10:30 am
2 days leftMon, 5 Oct, 10:30 am
Similar live tenders
Electrical & Power in Central Govt- Comprehensive Annual Maintenance Contract of M/s Amara Raja make Integrated power supply (IPS) system installed in SEE division of E.C. Railway for 3 years.
Ministry of Railways · Central Govt
23 days leftMon, 26 Oct, 12:00 pm
23 days leftMon, 26 Oct, 12:00 pm
- Comprehensive Annual Maintenance Contract for M/s. Amararaja make Integrated Power Supply (IPS) installations over Tiruchchirappalli Division for a period of Three (03) Years
Ministry of Railways · Central Govt
11 days leftWed, 14 Oct, 2:00 pm
11 days leftWed, 14 Oct, 2:00 pm
- Comprehensive Annual maintenance contract for testing/repairs/replacement of various modules/componants of Statcon Energiaa Make IPS (Integrated powersupply) system at various Stations/LC/Auto Huts in Jaipur division for 3 Years.
Ministry of Railways · Central Govt
18 days leftWed, 21 Oct, 3:00 pm
18 days leftWed, 21 Oct, 3:00 pm
- Comprehensive Annual Maintenance Contract (AMC) for 12 Nos. (Major) Integrated Power Supply Systems (IPS) (Make: Statcon Energiaa Pvt. Ltd.) over Bilaspur Division by OEM / Authorised Dealer of M/s Statcon Energiaa Pvt. Ltd. for a period of 36 Months (03 Years) on a single tender basis.
Ministry of Railways · Central Govt
6 days leftFri, 9 Oct, 3:00 pm
6 days leftFri, 9 Oct, 3:00 pm
- 16 days left
Mon, 19 Oct, 12:00 pm
16 days leftMon, 19 Oct, 12:00 pm
- Annual Maintenance Contract for 41 Major IPS & 20 Mini IPS of M/s Statcon makes Integrated Power Supply System (IPS) systems in Hyderabad division for a period of two years.(Including GST @ 18 Percent )
Ministry of Railways · Central Govt
12 days leftThu, 15 Oct, 11:30 am
12 days leftThu, 15 Oct, 11:30 am