Supply- Electromagnetic Voltage Transformer: 72.5KV, 25MM/KV Creepage, Single Phase Potential Trans
by Department of Heavy Industry
Published
Tue, 29 Sept
4:18 pm
Bid submission closes
Sat, 10 Oct
5:00 pm· 10 days left
Key terms of this bid
Read from the GeM bid document on 30 Sept 2026, 3:36 am IST. The document below is the final word.
- EMD
- Not required
- Performance security
- 5% ePBG
- For 60 months
- Bid type
- Two Packet
- Total value wise evaluation
- Reverse auction
- No
- Offer validity
- 120 days
- From the bid end date
- Experience & turnover relaxation
- No
- Purchase preference
- MSE
Documents sellers must upload
- Certificate (Requested in ATC)
- Additional Doc 1 (Requested in ATC)
- Additional Doc 2 (Requested in ATC)
- Additional Doc 3 (Requested in ATC)
- Additional Doc 4 (Requested in ATC)
- Compliance of BoQ specification and supporting document
Delivery to 2 locations
Fatehpur HVDC substation Near Lodhi bhawan bharsawan PO: Ashok Nagar Bharsawan District: Fatehpur Uttar Pradesh 212664, India
PIN 212664 · Quantity 8 · Deliver within 238 days
Bhadla HVDC substation NH 911, Near Baba Ramdevji Mandir PO: Bap, District: Phalodi Rajasthan 342307, India
PIN 342307 · Quantity 8 · Deliver within 147 days
Tender details
- Organisation
- Ministry of Heavy Industries and Public Enterprises › Department of Heavy Industry
- Location
- Central Government
- Tender ID
- GEM/2026/B/8095710
- Category
- Electrical & Power
- Quantity
- 16
- Source portal
- GeM — Government e-Marketplace
Bid document
How to bid
- 1Read the bid document on this page: the terms, eligibility, EMD, specifications and ATC (additional terms and conditions).
- 2Log in to your GeM seller account (register at gem.gov.in if you don't have one; it's free).
- 3Search BidPlus for bid number GEM/2026/B/8095710 and submit your offer before the closing time.
New to bidding? Read GeM seller registration: documents, charges and steps, How to read a GeM bid document, section by section and GeM reverse auction: how bid to RA works, who gets in and how L1 is decided.
More from Department of Heavy Industry
All their tenders- Stack Analyzer System, Supervision for E&C of Stack Analysers, MANDATORY SPARES for Stack Analyzer Syst, O&M Training for Analysers
Department of Heavy Industry · Central Govt
42 min leftWed, 30 Sept, 6:00 pm
42 min leftWed, 30 Sept, 6:00 pm
- Resistance Box, Required for 20/5T EOT Crane Long Traverse operation at Shed-7. SS punch grid type res
Department of Heavy Industry · Central Govt
42 min leftWed, 30 Sept, 6:00 pm
42 min leftWed, 30 Sept, 6:00 pm
- 12 Watt BLDC Table Fan
Department of Heavy Industry · Central Govt
42 min leftWed, 30 Sept, 6:00 pm
42 min leftWed, 30 Sept, 6:00 pm
- Group Marker Carrier for Push-in Type TB as per BHEL Specification No. CEE/25001# 009, Connectwell M, Vertical Marker (1-50), Suitable for Push-in Type TB, as per BHEL Specification No. CEE/25001# 010, Vertical Marker (51-100)
Department of Heavy Industry · Central Govt
42 min leftWed, 30 Sept, 6:00 pm
42 min leftWed, 30 Sept, 6:00 pm
- Proof Machined C2R Forging Dia 240 X 715, C1 Forging Proof MCHND Dia 439x96, Annld C1 Block Forging Size 40X147X192, C1 FORG 40x140x560, C1 FORG 40x140x56
Department of Heavy Industry · Central Govt
42 min leftWed, 30 Sept, 6:00 pm
42 min leftWed, 30 Sept, 6:00 pm
Similar live tenders
Electrical & Power in Central Govt- Tomorrow
Thu, 1 Oct, 6:00 pm
TomorrowThu, 1 Oct, 6:00 pm
- Universal Motor with starter-switch, Primary Current Injection Set, Meter Reading Instrument MRI, Rewinding Machine, Control Panel, Potential Transformer, bus bar banding machine, bus bar punching machine, Electric PPR Pipe Welding Machine, Single Phase Smart Energy Meter, Three Phase Smart Energy Meter
Labour and Employment Department Gujarat · Gujarat
20 days leftTue, 20 Oct, 3:00 pm
20 days leftTue, 20 Oct, 3:00 pm
- 16 days left
Fri, 16 Oct, 12:00 pm
16 days leftFri, 16 Oct, 12:00 pm
- 17 days left
Sat, 17 Oct, 9:00 am
17 days leftSat, 17 Oct, 9:00 am
- 3 days left
Sat, 3 Oct, 2:00 pm
3 days leftSat, 3 Oct, 2:00 pm
- Primary Voltage Transformer for three phase electric locomotives
Ministry of Railways · Central Govt
22 days leftThu, 22 Oct, 2:30 pm
22 days leftThu, 22 Oct, 2:30 pm