Consultancy Services for Authority Engineer during operation and maintenance period for 4 lane paved shoulder (km. 0.00 to Km. 9.260) of Forbesganj to Jogbani Section of NH-57A in the state of Bihar on EPC basis. (Total length in Km 9.260)
by National Highways Authority of India
Published
Tue, 29 Sept
5:45 pm
Bid submission closes
Tue, 10 Nov
12:00 pm· 40 days left
Bid opening
Wed, 11 Nov
12:30 pm
Tender details
- Organisation
- National Highways Authority of India
- Location
- Central Government
- Tender ID
- 2026_NHAI_292743_1
- Reference no.
- NIT No- 347/RO-PATNA/NHAI/2026-27
- Category
- Manpower & Services
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1To find the tender, search CPPP — Central Public Procurement Portal for Tender ID 2026_NHAI_292743_1.
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
New to bidding? Read How to apply for government tenders in India, step by step, How to register and bid on eprocure.gov.in and other NIC portals and Digital signature (DSC) for e-tendering: which one you need.
More from National Highways Authority of India
All their tenders- Independent Engineer Services for 4-lane Highway of Armoor-Jagtial-Mancherial Section of NH-63 from Armoor (design km.29.100) to Jagtial (design km.92.700) (total length 63.600 km) under NH(O) on Hybrid Annuity Mode in the state of Telangana
National Highways Authority of India · Central Govt
TodayThu, 1 Oct, 11:00 am
TodayThu, 1 Oct, 11:00 am
- Independent Engineer Services for 4-lane Highway of Armoor-Jagtial-Mancherial Section of NH-63 from Jagtial (design km.92.700) to Mancherial (design km.160.995) (total length 68.295 km) under NH(O)on Hybrid Annuity Mode in the state of Telangana
National Highways Authority of India · Central Govt
TodayThu, 1 Oct, 11:00 am
TodayThu, 1 Oct, 11:00 am
- Engagement of user fee agency through E-Tender at Bahala Fee Plaza at km 100.500 of Alwar to Nuh Section from design kilometer 92.400 to kilometer 127.350 of National Highway 248A in the State of Rajasthan
National Highways Authority of India · Central Govt
TodayThu, 1 Oct, 11:00 am
TodayThu, 1 Oct, 11:00 am
- Engagement of user fee collection agency on the basis of EQ through etender at Paluvai Fee Plaza in the state of Andhra Pradesh and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
National Highways Authority of India · Central Govt
TodayThu, 1 Oct, 11:00 am
TodayThu, 1 Oct, 11:00 am
- Engagement of user fee collection agency on the basis of E quotation through e-tender at Maranga Fee Plaza of National Highway Number 31 in Bihar
National Highways Authority of India · Central Govt
TodayThu, 1 Oct, 11:00 am
TodayThu, 1 Oct, 11:00 am
Similar live tenders
Manpower & Services in Central Govt- Consultancy Services for Authority Engineer during operation and maintenance period of Chhapra -Hajipur Section of NH-31 (Old NH-19) from Km.143.200 to Km.209.940 in the State of Bihar (Total length Km. 66.74).
National Highways Authority of India · Central Govt
13 days leftWed, 14 Oct, 12:00 pm
13 days leftWed, 14 Oct, 12:00 pm
- Consultancy Services for Authority Engineer during operation and maintenance period of Chhapra -Hajipur Section of NH-31 (Old NH-19) from Km.143.200 to Km.209.940 in the State of Bihar (Total length Km. 66.74).
National Highways Authority of India · Central Govt
13 days leftWed, 14 Oct, 12:00 pm
13 days leftWed, 14 Oct, 12:00 pm
- Consultancy Services for Authority Engineer during operation and maintenance period for 2 lane paved shoulder (km. 0.00 to 63.655) of Majhauli - Charout Section of NH 527C in the state of BIhar on EPC basis. (Total length in Km 63.655)
National Highways Authority of India · Central Govt
40 days leftTue, 10 Nov, 12:00 pm
40 days leftTue, 10 Nov, 12:00 pm
- Consultancy Services for Authority Engineer during operation and maintenance period for 2 lane paved shoulder (km. 0.00 to 63.655) of Majhauli - Charout Section of NH 527C in the state of BIhar on EPC basis. (Total length in Km 63.655)
National Highways Authority of India · Central Govt
40 days leftTue, 10 Nov, 12:00 pm
40 days leftTue, 10 Nov, 12:00 pm
- Consultancy Services for Authority Engineer during operation and maintenance period for 4 lane paved shoulder (km. 0.00 to Km. 9.260) of Forbesganj to Jogbani Section of NH-57A in the state of Bihar on EPC basis. (Total length in Km 9.260)
National Highways Authority of India · Central Govt
40 days leftTue, 10 Nov, 12:00 pm
40 days leftTue, 10 Nov, 12:00 pm
- Consultancy Services as Independent Engineer during Operation and Maintenance for four laning of Hospet Chitradurga section of NH13 new NH50 from Km.299.000 to Km.418.750 in the State of Karnataka under NHDP Phase III on DBFOT Toll basis.
National Highways Authority of India · Central Govt
5 days leftTue, 6 Oct, 3:00 pm
5 days leftTue, 6 Oct, 3:00 pm