Improvement/Strengthening of the Existing Road from KM 86.120 to KM 94.540 Heena-Tekhla Widening to 2-Lane Standard from KM 94.540 to KM 95.287, Construction of a 100M PMT Bridge at KM 93.425AND Treatment of Two Landslide Locations at Netala And
by Ministry of Road Transport and Highways
Published
Mon, 28 Sept
2:00 pm
Bid submission closes
Thu, 12 Nov
5:00 pm· 43 days left
Bid opening
Fri, 13 Nov
5:00 pm
Tender details
- Organisation
- Ministry of Road Transport and Highways
- Location
- Central Government
- Tender ID
- 2026_MoRTH_927938_1
- Reference no.
- 85048/DPR/G-D/KM 86.120 to Km 94.540/EPC Cell
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_MoRTH_927938_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
New to bidding? Read How to apply for government tenders in India, step by step, How to register and bid on eprocure.gov.in and other NIC portals and Digital signature (DSC) for e-tendering: which one you need.
More from Ministry of Road Transport and Highways
All their tenders- Special repair of NH 503A Punjab Border Bankhandi Una Lathaiani Salouni Bhota at various locations from Km 000 to 70000 SH Construction of Retaining wall Breast wall Wing wall RCC Box culverts RCC Cantilever walls Covered U shape Drain and Patch work
Ministry of Road Transport and Highways · Central Govt
48 min leftWed, 30 Sept, 1:00 pm
48 min leftWed, 30 Sept, 1:00 pm
- Special repair of NH 503A Punjab Border Bankhandi Una Lathaiani Salouni Bhota at various locations from Km 000 to 70000 SH Construction of Retaining wall Breast wall Wing wall RCC Box culverts RCC Cantilever walls Covered U shape Drain and Patch work
Ministry of Road Transport and Highways · Central Govt
48 min leftWed, 30 Sept, 1:00 pm
48 min leftWed, 30 Sept, 1:00 pm
- Short Term Improvement and Routine Maintenance of Km. 34/480 to 74/00 (for Vartej Dhasa section) of NH-51 in the state of Gujarat.
Ministry of Road Transport and Highways · Central Govt
TodayWed, 30 Sept, 2:00 pm
TodayWed, 30 Sept, 2:00 pm
- Short Term Maintenance of NH-351G Km. 0/00 to 62/200 Nageshree-Khambha-Chalala Road in the state of Gujarat.
Ministry of Road Transport and Highways · Central Govt
TodayWed, 30 Sept, 2:00 pm
TodayWed, 30 Sept, 2:00 pm
- Short Term Improvement and Routine Maintenance of Km. 78/700 to 116/600 (For Amreli-Babra section) of NH-351G in the state of Gujarat.
Ministry of Road Transport and Highways · Central Govt
TodayWed, 30 Sept, 2:00 pm
TodayWed, 30 Sept, 2:00 pm
Similar live tenders
Civil Works in Central Govt- Improvement/Strengthening of the Existing Road from KM 86.120 to KM 94.540 Heena-Tekhla Widening to 2-Lane Standard from KM 94.540 to KM 95.287, Construction of a 100M PMT Bridge at KM 93.425AND Treatment of Two Landslide Locations at Netala And
Ministry of Road Transport and Highways · Central Govt
43 days leftThu, 12 Nov, 5:00 pm
43 days leftThu, 12 Nov, 5:00 pm
- Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode
Ministry of Road Transport and Highways · Central Govt
23 days leftFri, 23 Oct, 12:00 pm
23 days leftFri, 23 Oct, 12:00 pm
- Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode
Ministry of Road Transport and Highways · Central Govt
23 days leftFri, 23 Oct, 12:00 pm
23 days leftFri, 23 Oct, 12:00 pm
- Widening and Strengthening Of Existing 2 Lane to 2 lane with Paved Shoulder from Km. 205.373 to Km. 311.700 of NH-326 in the State of Odisha under EPC mode (Package-2)
Ministry of Road Transport and Highways · Central Govt
48 days leftTue, 17 Nov, 5:00 pm
48 days leftTue, 17 Nov, 5:00 pm
- Widening and Strengthening Of Existing 2 Lane to 2 lane with Paved Shoulder from Km. 205.373 to Km. 311.700 of NH-326 in the State of Odisha under EPC mode (Package-2)
Ministry of Road Transport and Highways · Central Govt
48 days leftTue, 17 Nov, 5:00 pm
48 days leftTue, 17 Nov, 5:00 pm
- Widening and Strengthening of Existing 2 Lane to 2 Lane with Paved Shoulder from Km. 68.600 to Km. 162.700 and Km. 178.400 to Km. 183.732 of NH-326 in the State of Odisha under EPC Mode (Package-1)
Ministry of Road Transport and Highways · Central Govt
48 days leftTue, 17 Nov, 5:00 pm
48 days leftTue, 17 Nov, 5:00 pm