Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to Do Nadi Pool and Do Nadi Pool to Dungarpur and Tijwad to NH-927A PKG-4 merging point at Km 168/600 to 170/600
by Ministry of Road Transport and Highways
Published
Mon, 28 Sept
9:00 am
Bid submission closes
Mon, 26 Oct
11:00 am· 27 days left
Bid opening
Tue, 27 Oct
11:00 am
Tender details
- Organisation
- Ministry of Road Transport and Highways
- Location
- Central Government
- Tender ID
- 2026_MoRTH_927905_5
- Reference no.
- NIT 2/2026-27 EE PWD NH Dn Banswara
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_MoRTH_927905_5 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from Ministry of Road Transport and Highways
All their tenders- Independent Engineer Services for Construction of 4 Lane PS from Km 140.200 to 167.326 Chikkodi Gotur section including Chikkodi Bypass on NH 548B in the State of Karnataka on Hybrid Annuity Mode HAM under NH(O) Annual Plan 2023 24
Ministry of Road Transport and Highways · Central Govt
TodayTue, 29 Sept, 3:00 pm
TodayTue, 29 Sept, 3:00 pm
- Construction of Swimming Pool at IAHE Campus, Noida
Ministry of Road Transport and Highways · Central Govt
TodayTue, 29 Sept, 3:00 pm
TodayTue, 29 Sept, 3:00 pm
- Independent Engineer Services for Construction of 4 Lane PS from Km 140.200 to 167.326 Chikkodi Gotur section including Chikkodi Bypass on NH 548B in the State of Karnataka on Hybrid Annuity Mode HAM under NH(O) Annual Plan 2023 24
Ministry of Road Transport and Highways · Central Govt
TodayTue, 29 Sept, 3:00 pm
TodayTue, 29 Sept, 3:00 pm
- Construction of Swimming Pool at IAHE Campus, Noida
Ministry of Road Transport and Highways · Central Govt
TodayTue, 29 Sept, 3:00 pm
TodayTue, 29 Sept, 3:00 pm
- Consultancy Services for Preparation of feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulder on NH 169A from Km. 30.75 to Km. 51.60 Agumbe Ghat in the State of Karnataka
Ministry of Road Transport and Highways · Central Govt
TodayTue, 29 Sept, 3:00 pm
TodayTue, 29 Sept, 3:00 pm
Similar live tenders
Civil Works in Central Govt- Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to Do Nadi Pool and Do Nadi Pool to Dungarpur and Tijwad to NH-927A PKG-4 merging point at Km 168/600 to 170/600
Ministry of Road Transport and Highways · Central Govt
27 days leftMon, 26 Oct, 11:00 am
27 days leftMon, 26 Oct, 11:00 am
- Hard shoulder and interlocking block pavement work from Gowari to Panchal petrol pump Sagwara left out length 4 km
Ministry of Road Transport and Highways · Central Govt
27 days leftMon, 26 Oct, 11:00 am
27 days leftMon, 26 Oct, 11:00 am
- Hard shoulder and interlocking block pavement work from Gowari to Panchal petrol pump Sagwara left out length 4 km
Ministry of Road Transport and Highways · Central Govt
27 days leftMon, 26 Oct, 11:00 am
27 days leftMon, 26 Oct, 11:00 am
- Construction work of interlocking road-side pavement from Tiraha Fountain to Valmiki Basti in Mohalla Islamabad, Ward Number-04 of Nagar Panchayat Jhalu, District- Bijnor.
Directorate of Local Bodies UP · Uttar Pradesh
2 days leftThu, 1 Oct, 1:00 pm
2 days leftThu, 1 Oct, 1:00 pm
- Construction work of interlocking road-side pavement from R.R.R. Center to Eidgah Road in Mohalla Islamabad, Ward Number-04 of Nagar Panchayat Jhalu, District- Bijnor.
Directorate of Local Bodies UP · Uttar Pradesh
2 days leftThu, 1 Oct, 1:00 pm
2 days leftThu, 1 Oct, 1:00 pm
- Construction work of rubber-mold interlocking and plastering on the side pavement from Lucknow Prayagraj Highway (Kavya Enterprises) to Ramraj Chaudharys house in Ward No. 04 Kooti locality
Directorate of Local Bodies UP · Uttar Pradesh
17 days leftFri, 16 Oct, 5:00 pm
17 days leftFri, 16 Oct, 5:00 pm