Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
by National Highways Authority of India
Published
Thu, 15 Jan
1:00 pm
Bid submission closes
Mon, 5 Oct
11:00 am· 5 days left
Bid opening
Tue, 6 Oct
11:30 am
Tender details
- Organisation
- National Highways Authority of India
- Location
- Central Government
- Tender ID
- 2026_NHAI_263118_1
- Reference no.
- NHAI/KNT/Tumkur/ Shivamogga/2026/300344
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_NHAI_263118_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
New to bidding? Read How to apply for government tenders in India, step by step, How to register and bid on eprocure.gov.in and other NIC portals and Digital signature (DSC) for e-tendering: which one you need.
More from National Highways Authority of India
All their tenders- Diesel Power Generator (V2)
National Highways Authority of India · Central Govt
TodayWed, 30 Sept, 9:00 am
TodayWed, 30 Sept, 9:00 am
- Engagement of user fee agency through E-Tender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section of NH-352A (Pkg-II) in the State of Haryana
National Highways Authority of India · Central Govt
TodayWed, 30 Sept, 11:00 am
TodayWed, 30 Sept, 11:00 am
- Engagement of user fee agency through E-Tender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section of NH-352A (Pkg-II) in the State of Haryana
National Highways Authority of India · Central Govt
TodayWed, 30 Sept, 11:00 am
TodayWed, 30 Sept, 11:00 am
- Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
National Highways Authority of India · Central Govt
TodayWed, 30 Sept, 11:00 am
TodayWed, 30 Sept, 11:00 am
- Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs and Parks) on Delhi-Agra Section on NH-2 from Km. 16.100 to Km. 20.500 in Delhi and Haryana on Item Rate (Percentage) basis.
National Highways Authority of India · Central Govt
TodayWed, 30 Sept, 11:00 am
TodayWed, 30 Sept, 11:00 am
Similar live tenders
Civil Works in Central Govt- Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
National Highways Authority of India · Central Govt
5 days leftMon, 5 Oct, 11:00 am
5 days leftMon, 5 Oct, 11:00 am
- RFP For Construction of Gonda Bypass (western part) of NH 330B to four lane with paved shoulder configuration design length of 20.570 Km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh
Ministry of Road Transport and Highways · Central Govt
30 days leftFri, 30 Oct, 11:00 am
30 days leftFri, 30 Oct, 11:00 am
- RFP For Construction of Gonda Bypass (western part) of NH 330B to four lane with paved shoulder configuration design length of 20.570 Km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh
Ministry of Road Transport and Highways · Central Govt
30 days leftFri, 30 Oct, 11:00 am
30 days leftFri, 30 Oct, 11:00 am
- Construction of Four-Lane access control Arwal Bypass from km 54.200 To Km 66.500 (Design ch. 67.680) of existing NH-139 on Naubatpur- Hariharganj Road in the State of Bihar under EPC Mode.
Ministry of Road Transport and Highways · Central Govt
15 days leftThu, 15 Oct, 3:00 pm
15 days leftThu, 15 Oct, 3:00 pm
- Construction of Four-Lane access control Arwal Bypass from km 54.200 To Km 66.500 (Design ch. 67.680) of existing NH-139 on Naubatpur- Hariharganj Road in the State of Bihar under EPC Mode.
Ministry of Road Transport and Highways · Central Govt
15 days leftThu, 15 Oct, 3:00 pm
15 days leftThu, 15 Oct, 3:00 pm
- Construction of Alirajpur Bypass (2-Lane with Paved Shoulder) from Ch. 0.000 to Ch. 11.792 in the State of Madhya Pradesh (Total Length-11.792 Kms) under EPC Mode
Madhya Pradesh Road Development Corporation Limited · Madhya Pradesh
5 days leftMon, 5 Oct, 3:30 pm
5 days leftMon, 5 Oct, 3:30 pm