Construction of 6-lane VUP (1X20mX4.5m) at Km.202.860 (Panchalingala) under long-term rectification of MoRTH identified Blackspot (AP-02-085 / AP-04-183) along with Slip Road for Sunikesula Underpass (RHS) with MNB across KC canal on HYD-BLR section.
by National Highways Authority of India
Published
Thu, 20 Aug
4:15 pm
Bid submission closes
Mon, 5 Oct
3:00 pm· 6 days left
Bid opening
Tue, 6 Oct
3:00 pm
Tender details
- Organisation
- National Highways Authority of India
- Location
- Central Government
- Tender ID
- 2026_NHAI_288283_1
- Reference no.
- NHAI/RO-HYD/Blackspots/NH-44/ Hyd-Bgl/2026/25
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 2026_NHAI_288283_1 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
New to bidding? Read How to apply for government tenders in India, step by step, Digital signature (DSC) for e-tendering: which one you need and Documents required for government tenders: a checklist.
More from National Highways Authority of India
All their tenders- Diesel Power Generator (V2)
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 9:00 am
TomorrowWed, 30 Sept, 9:00 am
- Engagement of user fee agency through E-Tender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section of NH-352A (Pkg-II) in the State of Haryana
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
- Engagement of user fee agency through E-Tender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section of NH-352A (Pkg-II) in the State of Haryana
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
- Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
- Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City Pkg 1 from Km 0.000-Km7.926 (TL 20.00Km MCW Loop Ramp Link Road) in UP on HAM
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
Similar live tenders
Civil Works in Central Govt- Construction of 6-lane VUP (1X20mX4.5m) at Km.202.860 (Panchalingala) under long-term rectification of MoRTH identified Blackspot (AP-02-085 / AP-04-183) along with Slip Road for Sunikesula Underpass (RHS) with MNB across KC canal on HYD-BLR section.
National Highways Authority of India · Central Govt
6 days leftMon, 5 Oct, 3:00 pm
6 days leftMon, 5 Oct, 3:00 pm
- Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
- Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
National Highways Authority of India · Central Govt
TomorrowWed, 30 Sept, 11:00 am
TomorrowWed, 30 Sept, 11:00 am
- Construction of flyover for Long-Term Rectification of MoRTH Notified Accident Blackspot at Palasi Zero Mile More, NH-27 Km 212.000/NH-527 Km 0.000, Araria District, Bihar on EPC Mode
National Highways Authority of India · Central Govt
16 days leftThu, 15 Oct, 12:00 pm
16 days leftThu, 15 Oct, 12:00 pm
- Construction of flyover for Long-Term Rectification of MoRTH Notified Accident Blackspot at Palasi Zero Mile More, NH-27 Km 212.000/NH-527 Km 0.000, Araria District, Bihar on EPC Mode
National Highways Authority of India · Central Govt
16 days leftThu, 15 Oct, 12:00 pm
16 days leftThu, 15 Oct, 12:00 pm
- Lane Widening, and Junction improvement for Long Term Rectification of Blackspot No. 177(PHE Office to Jaitpura) on Sanawad-Khargone Road under Indore Division
Madhya Pradesh Road Development Corporation Limited · Madhya Pradesh
22 days leftWed, 21 Oct, 3:30 pm
22 days leftWed, 21 Oct, 3:30 pm