S&T Work in connection with:(1) Construction of long haul loop in Up grid by extending DE of ORL of Up loop L/No.-1 at KTE end with dispatch facility and connecting banking engine siding to Up loop L/No.-1 at BSP end at KGS station of Bilaspur Division.(2) Chhulha: Construction of Long Loop Line (CAL-750m, DS- PT) with bi-directional 03rd line by extending DE of loop line No.-5 at APR end.
Published
Tue, 8 Sept
11:38 am
Bid submission closes
Wed, 30 Sept
3:00 pm· 2 days left
Bid opening
Wed, 30 Sept
3:00 pm
Tender details
- Organisation
- Ministry of Railways
- Location
- Central Government
- Tender ID
- 91874699
- Reference no.
- 15A-ST-Tender-2026
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 91874699 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from Ministry of Railways
All their tenders →- Supply, installation and commissioning of Lobby TSS equipment set for CMS (KIOSK)
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
- Electronic Auto drain valve
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
- Supply Installation Commissioning of Visual Display Unit (65 Inch LED) for Monitroring of cleaning Activities as Per Attached Specification
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
- 4 CORE 50 SQ MM PVC insulated heat resistant electrical cable
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
- Earthing shunt for WAG-9 loco
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
Similar live tenders
Civil Works in Central Govt →- S&T Work in connection with: Rupaund (RPD): Extension of DE of DN loop (C/loop) L/1 at KTE end for long haul formation and goods parking line.
Ministry of Railways · Central Govt
Wed, 30 Sept3:00 pm · 2 days left
- S&T Work in connection with: Provisioning in 1 in 12 cross over from shunting neck line 04th line at BSP end for handling of long haul trains from UP grid of RIG yard.
Ministry of Railways · Central Govt
Wed, 14 Oct3:00 pm · 16 days left
- S&T work in connection with a long Loop Line at DN Grid and proper pathway in station yard at Barabamboo.
Ministry of Railways · Central Govt
Tue, 6 Oct3:00 pm · 8 days left
- S&T works in connection with Construction of 2 additional Loop Lines in DN grid of Maluka yard.
Ministry of Railways · Central Govt
Thu, 1 Oct3:00 pm · 3 days left
- S&T work in connection with Construction of long Loop Line to 3rd Line at UP side, Bhalulata.
Ministry of Railways · Central Govt
Fri, 16 Oct3:00 pm · 18 days left
- Alteration Work for Construction of 2 additional Loop Lines in DN grid of Maluka yard.
Ministry of Railways · Central Govt
Thu, 1 Oct3:00 pm · 3 days left