Bengaluru city-Sampige road section: Fabrication of RH girders for the proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in various locations as RCC box of size 1x5.00mx2.65m(Total no of subways- 11). Maintenance period is 3 months.
Published
Thu, 17 Sept
1:17 pm
Bid submission closes
Mon, 12 Oct
3:00 pm· 13 days left
Bid opening
Mon, 12 Oct
3:00 pm
Tender details
- Organisation
- Ministry of Railways
- Location
- Central Government
- Tender ID
- 92152264
- Reference no.
- 23SBC26of17-09-26ITEM-01
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 92152264 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from Ministry of Railways
All their tenders- Supply, installation and commissioning of Lobby TSS equipment set for CMS (KIOSK)
Ministry of Railways · Central Govt
TodayTue, 29 Sept, 10:30 am
TodayTue, 29 Sept, 10:30 am
- Self Adhesive Insulation Material
Ministry of Railways · Central Govt
TodayTue, 29 Sept, 10:30 am
TodayTue, 29 Sept, 10:30 am
- Buffer Solution (4X2000ML)-FOR Auto- Analyser Olympus Au 400/AU480]
Ministry of Railways · Central Govt
TodayTue, 29 Sept, 10:30 am
TodayTue, 29 Sept, 10:30 am
- Brush Paint and Varnish flat size 50 mm
Ministry of Railways · Central Govt
TodayTue, 29 Sept, 10:30 am
TodayTue, 29 Sept, 10:30 am
- GR.Bharat Camex Compound
Ministry of Railways · Central Govt
TodayTue, 29 Sept, 10:30 am
TodayTue, 29 Sept, 10:30 am
Similar live tenders
Civil Works in Central Govt- Bengaluru city-Sampige road section: Fabrication of RH girders for the proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in various locations as RCC box of size 1x5.00mx2.65m(Total no of subways- 11). Maintenance period is 3 months.
Ministry of Railways · Central Govt
13 days leftMon, 12 Oct, 3:00 pm
13 days leftMon, 12 Oct, 3:00 pm
- Bengaluru city-Jolarpettai section: Fabrication of RH girders for the proposed construction of pedestrian subways in connection with safety fencing for speed increas up to 130 Kmph(Total no of subways-14). Maintenance period is 3 months.
Ministry of Railways · Central Govt
13 days leftMon, 12 Oct, 3:00 pm
13 days leftMon, 12 Oct, 3:00 pm
- Bengaluru city-Jolarpettai section: Fabrication of RH girders for the proposed construction of pedestrian subways in connection with safety fencing for speed increas up to 130 Kmph(Total no of subways-14). Maintenance period is 3 months.
Ministry of Railways · Central Govt
13 days leftMon, 12 Oct, 3:00 pm
13 days leftMon, 12 Oct, 3:00 pm
- Bengaluru City-Dharmavaram Section: Fabrication of RH girders for the proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in varoius locations in connection with speed increase up to 130 Kmph(Total no of subways-17). Maintenance period is 3 months.
Ministry of Railways · Central Govt
13 days leftMon, 12 Oct, 3:00 pm
13 days leftMon, 12 Oct, 3:00 pm
- Bengaluru City-Dharmavaram Section: Fabrication of RH girders for the proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in varoius locations in connection with speed increase up to 130 Kmph(Total no of subways-17). Maintenance period is 3 months.
Ministry of Railways · Central Govt
13 days leftMon, 12 Oct, 3:00 pm
13 days leftMon, 12 Oct, 3:00 pm
- Proposed standardization of Height Gauges as per RDSO standard at the locations of LHS, RUB & major bridges of steel girders in HDS-PRDP Section under the jurisdiction of ADEN/II/CTC of Khurda Road division
Ministry of Railways · Central Govt
13 days leftMon, 12 Oct, 3:00 pm
13 days leftMon, 12 Oct, 3:00 pm